Professional Documents
Culture Documents
Contract B.O.Q.
ITEM
DESCRIPTION
QTY
UNIT
RATE
TOTAL (AED)
A B C
Site overhead/ Preliminaries Removing existing electrical and plumbing fixtures Demolishing and removing existing gypsum wall partition
1 1 383
Ls Ls m2
40,000.00 6,894.00
D E F G H I
Removing existing glass partition Construction of 100mm thick hollow block wall 12mm thick Cement and sand plaster to internal walls Repairing existing floor due to renovation work Repairing existing ceiling due to renovation work Fixing electrical and plumbing fixtures
36 42 84 76 1110 1
m2 m2 m2 Ls Ls Ls
Page 1
208,174.00
BILL NO.01
1/1