Contract B.O.Q.
ITEM
DESCRIPTION
UNIT
QTY
RATE
TOTAL (AED)
A A.1 A.2 B
General Requirements Design and approvals Site overhead/ Preliminaries Section 1 Removing existing gypsum wall partition and construction of block wall Removing existing electrical and plumbing fixtures Demolishing and removing existing gypsum wall partition Removing existing glass partition Construction of 1.2 m high 100mm thick hollow block wall 12mm thick Cement and sand plaster to internal walls Repairing existing floor due to renovation work Fixing electrical and plumbing fixtures Ls m2 m2 m2 m2 Ls Ls 1 383 36 42 84 76 1 0.00 18.00 20.00 90.00 40.00 120.00 0.00 6,894.00 720.00 3,780.00 3,360.00 9,120.00 Ls Ls 1 35,000.00 15,000.00 20,000.00
Section 2 Construction of three new glass partition rooms Fixing glass partitions Modification of MEP services m2 Ls 82 1 650.00 53,300.00 -
C.1 C.2
Summary
112,174.00
BILL NO.01