SUBMITTAL PLAN
Submittals
Trans. No. Sub. No. Item Rev. Dwg.
Specification
Description Section Para. Type Reviewed Date of Submission
Submittal Dates
Date Submitted REMARKS
DISTRIBUTION :
Subcon
Operation
QA
Document Controller
SUBMITTAL LOG
Item No. Transmittal Number
LOCATION : 28th st., cor. 3rd ave., Crescent Park, West District, Bonifacio, Global City, Taguig DATE : REPORT NO. :
Description
Date Submitted
Date Responded
REMARKS
DISTRIBUTION :
Subcon
Operation
QA
Document Controller
LOCATION : 28th st., cor. 3rd ave., Crescent Park, West District, Bonifacio, Global City, Taguig DATE OF SUBMITTAL : APPROVAL NEEDED BY (Not Later Than) : SUBMITTAL NUMBER (To be filled-in by MDC Doc's Controller) :
ROUTE
Subcon
(SUBCON :
)
MDC Op'ns
MDC TSD
NUMBER OF SETS SHOP DWGS PRODUCT DATA SAMPLES MOCK-UP TEST REPORTS
Specification Section:
If this is a resubmittal/revision, indicate document . number of original/disapproved submittal: .
MDC PM
Methods, Manuals,
Submittal Number
TO BE FILLED-IN BY MDC-PM/CQC
OTHERS
DESCRIPTION
ACTION CODE
Date Received:
TO BE FILLED-IN BY CONSULTANTS : Engineer/s
Received by:
Signature : Name : Date : Signature : Name : Date :
APMC/ALI
Architect/s
ACTION CODES A - Approved B - Approved as Noted C - Revise & Resubmit (work MAY NOT PROCEED) D - Disapproved (work MAY NOT PROCEED) DISTRIBUTION
Subcon
Acknowledging receipt of this submittal, we certify that it conforms to the contract conditions in all respects.
Documents Controller
QA Document Controller
Subcon
Operations
FORM NO. : QAQC - WAS 002 PROJECT : NABAS WIND POWER PROJECT
NO.
NO.
NO.
TOTAL
WBS NO.
TESTS REQUIRED
OFF-SITE
DESCRIPTION OF ITEMS
FREQUENCY OF TESTING
HOW OFTEN?
DATE
DATE
DONE BY
NAME?
RESULT
WHAT?
INTERPRETED BY
WHOM?
DISTRIBUTION :
Subcon
Production
CQC
Project Documentation
FORM NO. : QAQC - WAS 003 PROJECT : NABAS WIND POWER PROJECT
_________
(Contractor/Subcontractor)
___________________
Field Engineer
____________________
Project Head
TO :
SUBCONTRACTOR
ATTENTION : TYPE:
INFORMATION NEEDED:
REPLY: REMARKS:
Approved
Disapproved
ATTACHMENTS:
Others:
_______________________
REPLY FROM:
(Company) DISTRIBUTION:
(Name / Designation)
(Signature)
Contractor Subcontractor
Others:
Revision No. 001 (February 2014) Legend: RFI No. RFI-A 0001 (Architectural) RFI-S 0001 (Structural) RFI-I 0001 (Interior Design) RFI-M 0001 (Mechanical) RFI-E 0001 (Electrical) RFI-O 0001 (Others) RFI-P 0001 (Plumbing) RFI-F 0001 (Fire Protection)
REQUESTED BY :
PWEI
Subcon
_________________________________ __________________________________________
(Company) (Name / Designation) REVIEWED AND CHECKED BY: (PWEI ENGINEERS) SUBCONTRACTORS: Project In Charge (PIC) We hereby certify that preceding works have been completed and accepted. We certify further that we are ready to do our respective works with this work request. EEI Field Engineer CENDAUR ENGINEERING Field Engineer GAMESA Field Engineer SAFETY Safety Officer Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date Name/Signature/Date
___________________
(Signature)
REMARKS
NOTE : This form must be submitted to the QA Team, duly accomplished & signed by the corresponding Contractors' personnel in charge at least 24 hours before actual execution. VERIFIED BY: (Work may proceed) : APPROVED BY:
________________________________
APPROVED BY:
________________________________
________________________________
(Field Superintendent/Supervisor)
DISTRIBUTION : Subcon
(Officer In Charge)
QA
(Signature)
REMARKS
the corresponding Contractors' personnel in charge at least 24 hours before actual execution.
________________________________
FORM NO. : QAQC - WAS 004 PROJECT : NABAS WIND POWER PROJECT
LOCATION : NABAS, AKLAN DATE SUBMITTED : INSPECTION DATE & TIME: CONTROL NO. :
STRUCTURE
REQUESTED BY :
PWEI
Contractor
(Company)
(Name / Designation)
(Signature)
CHECKED BY:
(PWEI Engineer)
REMARKS
REMARKS :
NOTE : This form must be submitted to The OPERATION'S TEAM, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24 hours before actual execution.
INSPECTED BY: APPROVED BY:
( Field Engr.)
DISTRIBUTION : Subcon Production