风险矩阵
Control Objective
控制目标 the construction
Ensure and
engineering work is under proper
guidence.
The feasibility report is prepared by the engineering department and reviewed by the
finance department and the company's management.
After the completion of the project design, the engineering department initiates the
project review process and prepare related supporting documents. The review is
conducted by multi departments, including the engineering department, the request
department, the financial director and othe company's management, etc..
The engineering department initiates the approval process in the OA system, where
clarifies the project name, project dates, stages, the opinion of the project leaders, and
attaches supporting documents, which are reviewed by management (engineering,
finance, request department,GMO, etc.). The project will be proposed to government
after approval.
The project leader fills out the PDI form with all the detailed information from the project. N
The PDI form will be appropriately approved according to the approval matrix in Docu
Sign system. After approval, the project analyst sends the approved PDI form to
accounting analyst requiring the active number of this project. Accounting analyst checks
the information and registers the project in SAP system, creating the active number of this
PDI. Then the active number will be returned to project analyst.
For all technical acquisitions to be made (Material / Services), as part of the quotation N
process, the purchasing team sends all the received technical proposals (without the
commercial info) to the technical departments for evaluation. The technical department
reviews the technical proposals and indicates which of the involved suppliers are able to
perform the service or deliver the item.
The hired services are measured by the respective company, that sends a preview of the N
measuring document to the CMOC's contract user before invoicing. The contract user
analyses the document and creates a FRS in SAP system. The approval of the FRS follows
the approval matrix in the company's policy. After approval, vendor could issue the
invoice.
Monthly the Administrative Engineering team performs a monitoring of the financial N
performance of the ongoing projects, by comparing the approved budget for each one of
the projects to its financial events. In the monitoring, the engineering team considers the
sponsorship changes (budget reallocation between approved projects).
The project budget is prepared based on the approved project design proposal. The
budget is sent to investment department for review and then submit it to the engineering
department, finance department, request department for approval.
A laboratory is based on site. It is responsible for testing the quality of materials supplied Y
and its operation is strictly based on ISO standard. Purchase order related controls please
refer to CT.P2P.06.
The engineering department, construction and supervision units jointly carry out quality N
acceptance check for purchased construction materials, and sign on the "Acceptance
Form". If a third-party test is required, the third-party agency will conduct the quality test
and issue the quality report. If the acceptance is unqualified, it will not be accepted.
Safety production inspection N
If hidden dangers of safety accidents are found during the inspection process, the safety
management will report to the project leader in time, and requiring the construction unit
to carry out remediation plan within a time limit. Follow-up remediation shall be reflected
in the inspection report.
N
Every two weeks, the engineering department holds meetings with the project
supervision and construction units and other relevant request departments to discuss the
project progress and main issues , including but not limited to: quality management,
progress management and safety management.
At the same time, the supervision unit prepares and submits a monthly project report to
the engineering department to summarize the project progress and issues identified in
the month, and the follow-up matters.
After the project is completed, in order to proceed with the activation of the project in Y
SAP System, the project manager fills and sends “Activation Dossier” to Accounting
analyst,the dossier contains at least 1) Activation Letter, which is signed by Project
Specialist; 2) Project Charter;3) Composition of Expense; 4) Invoice; 5) Closing terms and
acceptance report, which is signed by Project responsible and Project client/sponsor.
After Accounting analyst receives the checks the Activation Dossier, she activates the
project in the SAP system.
Control Level Control Owner Control Type Control Document Preventive(P)预防性控制/
控制层级 Daisuke
控制活动责任人 Yamaki
- 控制类型
Manual 控制文档 Preventive
Project Manager
(Niobium)
Liu Yuanqi -
Project Manager
(Phosphates
Catalao)
Application Control
Per event
Per event
Per event
Per event
Per event
Monthly
Monthly
Per event
Weekly
Per event
Weekly
Per event
Remediation Plans
整改计划
PwC comments