Claim Report No. HAL/KPT/RD33


SR.3/2012/034,
Dt.26.05.2012
for
unserviceability of fuel regulator
PT -59I.

The R.S. Via Letter No.P1123/27-114782, Dt. 10.04.2013 rejected the


Claim and informed that the IS had to forward a new indent for repair of the
aggregate in Russia.

Russian side to
forward the item.

The R.S. Via Letter No. P1123/27-125489, Dt. 20.06.2013 forwarded a reply
requesting to make payment for the expenses of the R.S. for a total amount
of 10050.00 USD.
During MTR of 30th IRSA meeting Russian side forwarded a letter No.
P1123/27-15500, Dt. 14.11.2013 enclosing invoice for transfer of the
amount.

2.

Claim Report No. HAL/KPT/RD33


SR.3/2012/036,
Dt.08.10.2012 for replacement
of defective item Main Fuel
Pump (HP-59AHT, Sl. No.
33912104031HT).

Vide Letter No. HAL/ED-KPT/PROJ/P12/2013/720, Dt. 31.12.13. Russian


side has been informed about the transfer of the amount.
Claim Report No. HAL/KPT/RD-33 SR.3/2012/036, Dt.08.10.2012 for
replacement of defective item Main Fuel Pump (HP-59AHT, Sl. No.
33912104031HT) was forwarded to the R.S. via Letter No. HAL/EDKPT/PROJ/P12/2012/618, Dt.08.10.2012.

Russian side to
forward the item.

The equipment has been delivered to Moscow. During MTR of 30 th IRSA


meeting Russian side promised to forward the conclusion of the claim in
Nov-Dec 2013.
Russian side vide letter No.P1123/27-151832, Dt. 20.12.2013 informed that
the claim is rejected as the defect is caused during operation.

3.

Claim Report No. HAL/KPT/RD33


SR.3/2012/038,
Dt.13.10.2012 for replacement
of defective articles.

Claim Report No. HAL/KPT/RD-33 SR.3/2012/038, Dt.13.10.2012 for


replacement of 2 defective BPR-88 Ser. 4 was forwarded to the R.S. via
Letter No. HAL/ED-KPT/PROJ/P12/2012/651, Dt.13/10/2012.

Russian side to
forward the item.

The equipment has been delivered to Moscow. During MTR of 30 th IRSA


meeting Russian side promised to forward the conclusion of the claim in
Nov-Dec 2013.

4.

Claim Report No. HAL/KPT/RD-

Russian side vide letter No.P1123/27-151832, Dt. 20.12.2013 informed that


the claim is rejected as the defect is caused during operation.
Claim Report No. HAL/KPT/RD-33 SR.3/2013/039, Dt.10.05.2013 was
Page 1 of 2

Vide

letter

SL.

BRIEF POINTS

BRIEF DETAILS

STATUS

33
SR.3/2013/039,
Dt.10.05.2013 for replacement
of oil tanks & spark plugs.

forwarded to the R.S. via Letter No. HAL/ED-KPT/PROJ/P12/2013/260, Dt.


10.05.2013.

No.P1123/27101854,
Dt.
21.01.2014
Russian side have
proposed
the
schedule
to
deliver
the
balance Oil Tanks
& Spark Plugs in
2014-2016.

During MTR of 30th IRSA meeting Russian side have promised to supply a
batch of 12 oil tanks and 50 spark plugs by Dec 2013 and also plan for next
batch of supplies.
Vide Airway bill No. 176-5242 4400, Dt. 11.12.2013 a batch of 12 oil tanks
and 50 spark plugs has been received.

Page 2 of 2

You might also like