You are on page 1of 1

Doc no: Rev: Date:

CONG/30140/003 00 07 February 2013

Works To Go
Area information
Project no: Contract no: Plant: Area & area no: Area description: Gridline: Drawing number: 30140 30174B STP CIL AREA 19 CIL N/a 19-CC-002 REV 2

Item no.
1 2 3 4 5 6 7 8 9

Description & RECORDING


STAIR NO. 10, 11, 12,13,14,15,16,17 TO BE COMPLETED GRIND OUT SHRINKAGE JOINT ON MID SECTION SLABS BETWEEN CIL TANKS REMOVAL OF POLYSETHERENE AND FILLING JOINTS WITH SIKADUR COMBUFLEX SG PLUGGING FORMWORK TIE IN RODS HOLES WITH NON SHRINK HIGH STRENGTH GROUT. PAINTING OF RING BEAMS WITH MASTERSEAL AS PER NCR REMOVAL OF ALL LAITANCE , FINS, CONCRETE SPLASH ON OTHER CONCRETE SURFACES FILLING OF ELECTRICAL DUCT ON CIL SWITCHROOM WITH EXPANDABLE FOAM( TO BE DONE BY ELECTRICALS) CLEAN ALL CONCRETE SURFACES FROM GREASE, OIL, CHEMICALS, SAND BLASTING RESIDUALS. DO GENERAL CLEANING AND TIDYING UP.

Status A B C

Remarks

Legend

Approved by:
QA/QC INSPECTOR

Approval signatures Name & Surname

Signature

Date

SAMUEL YEKO

Page 1 of 1