You are on page 1of 1

Ref.: TSC/TR/Report: B/R1 Job.

No APR14-E-5702

Date: 12-04.2014

To

HOTEL HOLIDAY INTERNATIONAL P.O.BOX: 5802,SHARJAH- U.A.E MR. DOMNICK.GOMES (050-6350994) Inspection Pending on Boiler Thorough

Attn Subject Type of Inspection Dear Sir,

: : :

This is with reference to the safety inspection of the steam water Boiler referred below at your premises Boiler Room, Sharjah,U.A.E. We conducted the Visual and Hydro test (dt.12-04-2014) of the boiler carried out, Description: Maker Serial No./ID Y.O.M Type / Model Design Pressure / MAWP Capacity Hydraulic Test Pressure Safety valve blowoff Recommendation / Remarks: 1 2

: STEELCO.DUBAI : 00658 : 1992 : WATER TUBE BOILER : 7.0 bar : 560 Kcal/hr : 10.5 bar : 7.0 bar

Functional test is pending due to maintenance work.

This is for your kind information and necessary action. With best regards, For TEAM SAFETY CONSULTANTS
Name and position of person who carried out the inspection and test: Authorized signatory authenticating this Report:

ABDUL AZIZ
Inspection Engineer

_______________

You might also like