2e+3or./: API RP 1107 Hot Tapping Inspection Procedure Qualification Record Pipelines Piping Repair Testing Welder Qualification Welding Procedure Qualification Welding Procedure Specification This document is the property of Petroleum e!elopment "man# $$%& 'either the (hole nor any part of this document may )e disclosed to others or reproduced# stored in a retrie!al system# or transmitted in any form )y any means *electronic# mechanical# reprographic recording or other(ise+ (ithout prior (ritten consent of the o(ner&
Version 1.0
The follo(ing ta)le lists the four most recent re!isions to this document& to these are held on file )y the issuing department& 4er/&on No. 2ersion 1&0 Date 03/04/00 %ut5or "TT/13 Scope 0 Remar*/ "riginal issue&
April 2000
SP-1167
Version 1.0
Contents
%ut5or&/e. (or I//ue ...................................................................................................................& Content/.......................................................................................................................................&& 1. Intro.uct&on.............................................................................................................................1 '. Spec&,&cat&on ,or -el.&n) on Pre//ur&/e. P&pe/..................................................................' %ppen.&6 % 1lo//ar+ o, De,&n&t&on/7 Term/ an. %88rev&at&on/............................................" %ppen.&6 9 %men.ment/0Supplement/ to Part II o, DEP "#.1#.6#."#-1en........................! 1 1eneral......................................................................................................................................! '.:ual&,&cat&on o, -el.&n) Proce.ure/.....................................................................................! ". -el.er :ual&,&cat&on..............................................................................................................; !. <a&ntenance -el.&n)............................................................................................................; ; In/pect&on an. Te/t&n) o, <a&ntenance -el./.....................................................................6 =.Documentat&on..........................................................................................................................6 %ppen.&6 C Re,erence/..............................................................................................................7 U/er Comment (orm..................................................................................................................=
April 2000
ii
SP-1167
Version 1.0
1.
1.1
Introduction
Purpose
This specification gi!es the minimum technical re5uirements for the (elding of fittings on to pressurised pipelines# using the S1AW process& This specification replaces .R 46706# Specification for Welding on Pressurised Pipes# issued in 8anuary 199:& The )asis of .R 46706 (as API Recommended Practice RP1107# Pipeline 1aintenance Welding Practices& Part II of the .R consisted of amendments and supplements to RP1107& In ecem)er 199;# most of the re5uirements of .R 46706 (ere incorporated into .P 60&10&:0&607<en# Welding on Pressurised Pipes# Part II of (hich includes similar changes to the API document& The .P has )een adopted )y P " as the )asis for hot tap (elding and related (or=& Therefore# the technical content of this specification is confined to those aspects of the .P (here the particular re5uirements of P " are not ade5uately co!ered& These are presented in Part II as amendments and supplements to .P 60&10&:0&607<en&
1.2
April 2000
Page 1
SP- 1167
Version 1.0
2.
2.1
Specification Requirements
Welding# and inspection shall )e in accordance (ith the re5uirements of Part II of .P 60&10&:0&607<en# ecem)er 199;# *and API RP1107# Third .dition# April 1991+# as further amended and supplemented )y Appendi> ? of this specification& The amendments and supplements of the te>t in Appendi> ? ha!e )een necessary to incorporate special P " re5uirements& The %lause num)ering in Appendi> ? follo(s that of API RP1107& Where clauses of API RP1107 are amended or supplemented neither )y this specification nor )y .P 60&10&:0&60 they shall apply in their entirety&
2.2
2."
2.'
2.*
Performance +onitoring
Re5uirements for monitoring (elding process !aria)les# (elder performance and (eld 5uality are detailed in rele!ant sections of API RP1107 as amended/supplemented )y Part II of .P 60&10&:0&607<en and Appendi> ? of this specification&
2.,
-ffecti e period
The re5uirements of this specification shall remain in force indefinitely unless superseded )y an authorised re!ision&
2..
April 2000
Page 2
SP-1167
Version 1.0
1eneral De,&n&t&on/
'dd the fo""o$in%& Compan+ Corporate (unct&onal D&/c&pl&ne >ea. U/er ma+ Petroleum e!elopment "man $$%& *To )e ta=en as synonymous (ith the term APrincipalB used in the .P+& The person responsi)le for the discipline to (hich the standard )elongs& The %ompany# %onsultant or %ontractor designate (ho uses this document& Indicates a possi)le course of action
Spec&,&c De,&n&t&on/
De"ete the definition for ()om!an#*.
%88rev&at&on/
'dd the fo""o$in%& C(D> DCS T% %orporate 0unctional iscipline Head
ocument %ontrol Section *"T?/@+ Technical Authority# as defined in .R 70070@ and <-7@7@&
April 2000
Page 3
SP- 1167
Version 1.0
Appendi/ 3 1 1.'
1.'.2
0eneral +aterials
Filler +etal 1.'.2.2 Storage and handling of filler metal
'dd the fo""o$in%& Prior to the commencement of 5ualification or production (elding# (hiche!er is sooner# the %ontractor shall su)mit a consuma)le handling procedure to the %ompany for re!ie( and appro!al& Test (elding or production (elding shall not commence until the consuma)le handling procedure has )een appro!ed )y %ompany TA $e!el @ or higher&
1.,
2.
2.1
The %ontractorBs o(n PQRs may also )e su)mitted to the %ompany %0 H for consideration pro!ided all the a)o!e re5uirements are met& .ssential 2aria)les
2.'
-ssential 7aria!les
+e!"ace item o. as fo""o$s& Any changes in (elding parameters (hich result in a !ariation of heat input greater than D 10E of that 5ualified# (ith the follo(ing e>ception& 0or root and )uttering runs deposited directly on to run pipe of thic=ness :&4mm and )elo(# the permitted !ariation in 5ualified heat input shall )e limited to F0E# 713E&
April 2000
Page 4
SP-1167
Version 1.0
2.,
2.,.1
2.,.,
+e!"ace the first !ara%ra!h as fo""o$s& 0or material designated to meet the re5uirements of either Asour ser!iceB# 'A%. 1R0173 or .P 61&40&617<en&# the ma>imum root and mid7thic=ness hardness shall )e @4; H210& The ma>imum cap hardness shall )e @73 H210&
".
".1
Welder 6ualification
Purpose
+e!"ace the first sentence of the second !ara%ra!h as fo""o$s& Test (elding shall )e (itnessed )y the %ompany& Welding parameters shall )e monitored )y the %ontractor to demonstrate that consistent control of the heat input ranges specified in the applica)le WPS is achie!ed&
'.
'.1
+aintenance Welding
0eneral
9e: +e!"ace third sentence $ith the fo""o$in%& The magnetic particle inspection procedure shall )e in accordance (ith .R 70770@&
'.;
April 2000
Page 5
SP- 1167
Version 1.0
the feasi)ility study * .P 61&6;&:0&107<en+ and procedure 5ualification tests& In all cases# the de!iation shall )e authorised )y the %ompany (elding %0 H and detailed in the appro!ed WPS&
*
*.1
*."
<on5Destructi e 2esting
+e!"ace the "ast sentence $ith the fo""o$in%& All magnetic particle inspection shall )e performed in accordance (ith a %ompany appro!ed procedure meeting the re5uirements of .R 70770@& The procedure shall )e su)mitted to the %ompany prior to test (elding or production (elding# (hiche!er is the sooner&
*.'
;.
;.2
;.2.1
Documentation
Pre5Welding Documentation
Content of the 6ualit& Plan In the second !ara%ra!h, re!"ace reference to (IS- 1000.* $ith& ASP71171B. +e!"ace the te,t of item / as fo""o$s& @& Reference to A'SI/API RP1107# .P 60&10&:0&607<en and this specification&
April 2000
Page 6
SP-1167
Version 1.0
Appendi/ C References
The fo""o$in% chan%es are a!!"icab"e to '!!endi, ) of DEP 30.10.60.30-Gen&
PDO Stan.ar./
'dd the fo""o$in% references& Technical Authorities System 'on7 estructi!e .>amination *Amendments/Supplements to AS1. Section 2+ <uideline for <ranting Technical Authority System Standard Procedure Qualification Records for Welding on Pressurised Pipes Quality Assurance Specification for .ngineering Wor=s .R 70070@ .R 70770@ <-7@7@ PR71@7: SP71171
%mer&can Stan.ar./
De"ete reference to 'ST0 E 1111.
Internat&onal Stan.ar./
De"ete reference to IS- 1000.
April 2000
Page 7
SP- 1167
Version 1.0
Heading 'um)er,
0igure 'um)er,
Su))e/t&on/:
Ref& Ind&,
Signature,
ate, Phone,
%0 H Ref& Ind&,
C(D> %ct&on/ Recd& Dec&/&on: ate, ReCect, Accept# re!ise at ne>t issue, Accept# issue temporary amendment %omments,
Ref& Ind&,
ate,
"riginator Ad!ised,
ate,
Inits&,
ate,
Inits&,