Afghanistan Engineer District BASIC CHANGE DOCUMENT (BCD)
Ready-Relevant-Responsive-Reliable 12 Mar 2009 12-Mar-09 2 Prepare the BCD 1 3 12-Mar-09 3 Prepare the BCD Accept the next available number. Do not change the prefix as this is your office designation in RMS. Use only for 2-part modifications (very rarely used). Consult Chief of CAB before assigning multi-part designation to your change request 12-Mar-09 4 Prepare the BCD Step 1. Enter Change Request Title Be descriptive but short. Avoid Misc Changes, etc. Add site name, period of delay, if applicable 12-Mar-09 5 Prepare the BCD Step 2. Enter Inception Date Todays date 12-Mar-09 6 Prepare the BCD Step 3. Enter Mod Required Date based on YOUR ESTIMATED VALUE of the mod. This is the estimated signature date. (Do NOT accept the default date that the program enters for you). Mods from $0 to $24,999 = inception date plus 60 days Mods from $25,000 to $99,999 = inception date plus 90 days Mods from $100,000 to $499,999 = inception date plus 120 days Mods over $500,000 = inception date plus 180 days 12-Mar-09 7 Prepare the BCD Step 4. Enter your last name (dont use your initials, were not here long enough to remember your initialswe do remember your name)
If you use the pick list and your name/title is incorrect or missing, go to the slides at the end of this presentation to fix it. 12-Mar-09 8 Prepare the BCD Choose the correct Agency Code: Allowable codes have an arrow 12-Mar-09 9 Prepare the BCD Choose the correct Reason Code: Allowable codes have an arrow 12-Mar-09 10 Prepare the BCD Choose the correct Mod Type Code: All mods are Bilateral 12-Mar-09 11 Prepare the BCD Enter the Approval team: COR: Program/Project Manager: YOUR ACO: If BCD is not approved or placed on another mod put in date here 12-Mar-09 12 Prepare the BCD 1 2 12-Mar-09 13 Prepare the BCD Accept the item number 12-Mar-09 14 Prepare the BCD Enter change request title, your estimate of the money and time that you feel the contractor should receive to accomplish this modification. Enter Spec paragraph and contract drawing numbers, if applicable 12-Mar-09 15 Prepare the BCD Enter detailed scope of work. Click the edit button to open a larger screen; use the spell check button The BCD SOW should be as detailed and clear as possible to include exactly which site, what the change is, changes to the specifications, drawings, codes, requirements, quantity, quality, time period evaluated for time extensions, etc. The BCD SOW will be used to create the RFP letter and SF 30 modification document. The BCD SOW should be detailed enough so that an Independent Government Estimate (IGE) can be produced, using only this document (and any applicable attachments) as the basis.
You and the contractor may understand what is being asked of them, but the BCD SOW should be written so that ANYBODY can clearly understand what the change is.
See next slide for time extension information 12-Mar-09 16 Time Extension Description of Change: It has been determined that delay in performance of work under this contract was by reasons beyond the contractors control and without his fault or negligence; namely (enter type of delay: security, access, rain, snow, etc) during the period month year thru month year, which delayed work progress. Therefore, it is understood and agreed that the contract performance time is extended xx calendar days at no additional cost to the Government.
Time Extension Reason for Change: Describe conditions which caused the delay. Include QA reports, weather analysis spreadsheet, emails, etc to support the decision to allow the time extension.
Prepare the BCD 12-Mar-09 17 Prepare the BCD Enter change in drawings. If none, leave blank Do not put time or money in any of theses areas because it will print out on the RFP of which the contractor gets a copy of. 12-Mar-09 18 Prepare the BCD Enter change in specifications. If none, leave blank 12-Mar-09 19 Prepare the BCD Enter reason why the mod came into being. Reference email messages, correspondence, meetings etc When all blocks are completed, close the BCD item 12-Mar-09 20 Prepare the BCD 12-Mar-09 21 Prepare the BCD Remove any check marks not needed; add information as it happens. This is a living screen that details the actions as they occur. Todays date (date of BCD) Click this radio button to include modification in the CWE 12-Mar-09 22 Prepare the BCD Remove any check marks not needed; add information as it happens. This is a living screen that details the actions as they occur. If revised plans are required, enter date that you requested drawings from Engineering; the due date; who is preparing them; when you received them. If no revisions are needed, remove the check mark 12-Mar-09 23 Prepare the BCD Remove any check marks not needed; add information as it happens. This is a living screen that details the actions as they occur. If revised specifications are required, enter date that you requested them from Engineering; the due date; who is preparing them; when you received them. If no revisions are needed, remove check mark 12-Mar-09 24 Prepare the BCD Remove any check marks not needed; add information as it happens. This is a living screen that details the actions as they occur. A government estimate is required for any modification greater than $100,000 in value. Enter date that you requested the estimate from Engineering; the due date; who is preparing the estimate. When you receive the estimate, enter date received, amount and time. If an estimate is not required, remove the check mark. 12-Mar-09 25 Prepare the BCD Remove any check marks not needed; add information as it happens. This is a living screen that details the actions as they occur. RFP letter date; proposal due date in RFP letter (Office Engineer Function) When contractors proposal is received, enter the letter in correspondence and enter the received date, amount and time requested here 12-Mar-09 26 Prepare the BCD Office Engineer adds money here when the PR&C is received This screen for info only; this is an office engineer responsibility 12-Mar-09 27 Prepare the BCD 1 Import any supporting documents hereemails, letters, weather sheets, QA/QC narrative reports, serious incident reports, etc 2 12-Mar-09 28 Sign the BCD Click the BCD button. The BCD will open. Click the Print button in the top right-hand corner. Change the printer to Adobe pdf Choose a file location for the BCD. The BCD will appear on your screen in a pdf format. Click the Sign icon at the top or from the Advanced menu Choose Place Signature. Using your mouse, click and drag to draw the area where you would like your signature to appear. Follow instructions in the Adobe program to complete the signature. Re-save the file. Close the adobe version of the BCD See next page 12-Mar-09 29 Print the BCD Click the close button to exit the BCD. You may receive the error message below. Choose No to exit the BCD. 12-Mar-09 30 Sign & Route the BCD Now that the BCD is complete, Requested by: COR (preparer) will review, print to adobe and sign the BCD (use the sign feature of Adobe) Email the BCD to the PM Recommended by: PM will review and sign the BCD (use the sign feature of Adobe) Request a PR&C in the amount of the initial estimate Email the BCD & PR&C to Administrative Contracting Officer (ACO) Approval by: ACO will review and sign the BCD (use the sign feature of Adobe) ACO will assign change to an Office Engineer Office Engineer Review BCD for complete SOW and funding estimate Prepare RFP for ACO signature Import signed BCD and RFP into RMS correspondence Email RFP to contractor with copy to COR & PM Notify PM that an IGE is required PM Contact PA for Engineering labor code Request IGE from Engineering
12-Mar-09 31 Fix your Signature Block 1 2 4 If your name is not in the Office Personnel list, change to the Other District Personnel List. Find your name in the list. Click to highlight your name. Choose Edit. 4 12-Mar-09 32 Fix your Signature Block Change your Abbreviated Name to your full last name Edit your Signature Block Add any other Signature Blockyou can have as many as you need 1 2