The document contains cost estimates for two construction items:
1) Earth excavation for 1000 cubic feet including labor of 3.75 coolies per day at Rs. 45 per day, sundries at 3%, and contractor profit and overheads of 35.44% for a total rate of Rs. 210 per 1000 cubic feet.
2) Cement concrete of ratio 1:4:8 for foundation and plinth work including materials of brick ballast, stone ballast, cement, and sand, labor of mason, coolie, and bhishti, sundries at 3%, and contractor profit and overheads of 21% for a composite rate of Rs. 7300.99 per 100
The document contains cost estimates for two construction items:
1) Earth excavation for 1000 cubic feet including labor of 3.75 coolies per day at Rs. 45 per day, sundries at 3%, and contractor profit and overheads of 35.44% for a total rate of Rs. 210 per 1000 cubic feet.
2) Cement concrete of ratio 1:4:8 for foundation and plinth work including materials of brick ballast, stone ballast, cement, and sand, labor of mason, coolie, and bhishti, sundries at 3%, and contractor profit and overheads of 21% for a composite rate of Rs. 7300.99 per 100
The document contains cost estimates for two construction items:
1) Earth excavation for 1000 cubic feet including labor of 3.75 coolies per day at Rs. 45 per day, sundries at 3%, and contractor profit and overheads of 35.44% for a total rate of Rs. 210 per 1000 cubic feet.
2) Cement concrete of ratio 1:4:8 for foundation and plinth work including materials of brick ballast, stone ballast, cement, and sand, labor of mason, coolie, and bhishti, sundries at 3%, and contractor profit and overheads of 21% for a composite rate of Rs. 7300.99 per 100
03-01-a Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in
ashes, sand, soft soil or silt clearance
for 1000 CFT LABOUR Qty Unit Rates/day Day Amount Coolie 3.75 Day 45 1 168.75 Sundries Labour only Add 3% 5.06 173.81 A Contractors Profit + Over Heads (Material+Labour+Equipment) 35.44 B 209.25 (A+B) Composite Rates Per 1000 Cft of Amount= 209.25 210 Above 100% 1 Cum of Amount= 7.39 8 Above 108% Total Labour = 79% 21% of Coolie Amount= 1000 cft @ of = Item Code : 06-03-B Spec. No : Unit 100 Cft Item Name : Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (PCC Ratio 1:4:8) Detail Qty Unit Rate(Price) Amount Material Brick Ballast / Stone Ballast 96 cft 1050 100 cft 1008 Ordinary Portland Cement 9 bag 360 1 bag 3240 Sand 48 cft 825 100 cft 396 4644 Labour Mason 0.25 Day 475 1 Day 118.75 Coolie 5 Day 225 1 Day 1125 Bhishti 0.5 Day 225 1 Day 112.5 1356.25 Sundries (Labour Only): 40.69 1396.94 Contractors Profit + Over Heads (Material+Labour+Equipment) : 21% 1260.05 Composite Rates Per : 100 Cft 7300.99 Per.Cum 2578.34 Amount Total Material 58.82 % 3 % of Labour = Total Labour 20.18 % = Change only Green area digits for items price only & Final Red Cell be your cost