You are on page 1of 2

NEIE

NORTHEAST

CHINA

INTERNATIONAL

ELECTRIC

POWER

CORPORATION

Ref: NEIE/SHK/
20-05-2014

Date:

Chief Engineer (EHV-II)


NTDC, Hyderabad.
Subject:

CONTRACT NO. SHK-001 (PACKAGE 1)


DESIGN, MANUFACTURE, SUPLY, INSTALLATION, TESTING &
COMMISIONING OF PLANT FOR UPGRADATION OF EXISTING 220KV
SHIKARPUR SUBSTATION TO 500KV LEVEL.
Dismantling & reconstruction of Boundary Wall around 500KV
Switchyard and wall at proposed acquired land.

Ref:

1. Your Letter No. CE(EHV-II)/NTDC/HYD/2356-62


2. Our Letter No. NEIE/SHK/473
3. Barqaab Letter No. 696/500/220Kv SS (Shikarpur)/C.E
4. Barqaab Letter No. 688/500/220Kv SS (Shikarpur)/C.E
5. Barqaab Letter No. 652/500/220Kv SS (Shikarpur)/C.E

Dated: 25-02-2014
Dated: 18-03-2013
Dated: 07-05-2014
Dated: 23-04-2014
Dated: 24-03-2014

Dear Sir,
1. In the site meeting of dated 13-05-2014, the subject matter was discussed with
Project Director (EHV-II) Hyderabad, who instructed to start the site activities on
Boundary Wall according to the following parameters already approved by the
Engineer and accepted by our office vide letter No. NEIE/SHK/473 dated: 18-032014.
In this contest, it is stated that;
i.

Length of Boundary Wall to be constructed as per General Layout Drawing No.


SHK/NEIE/001 is 683 Li.m.

ii.

Boundary Wall Drawing No. BQ/NTDC/SHK/BW-107-13 & General Layout


Drawing No. SHK/NEIE/001 approved by Barqaab on which all the details are
based may be reffered.

iii.

Total amount approved by Chief Engineer (EHV-II) NTDC, Hyderabad is


Rs. 14849841/-.

2. Further please refer our letter No. NEIE/SHK/473 dated: 18-03-2014 wherein
acceptance was given to construct the Boundary Wall at an amount of
Rs. 14849841/- at the following terms and conditions.
1.

All the terms & conditions of Contract No. SHK-001(Package-1) will be


followed.

2.

The items already existing in bid price will be followed.

3.

The items not covered in bid price but as advised shall be prepared according
to WAPDA composite Schedule of Rates 2013 Zone 4 after 20% discount. The
___________________________________________________________________________
17/2 Block D, Model Town , Lahore Pakistan
Tel: (92 42) 35845017 Fax: (92 42) 358915017 E-mail. Neie.shk001@gmail.com

NEIE

NORTHEAST

CHINA

INTERNATIONAL

ELECTRIC

POWER

CORPORATION

necessary variation approval of these items as at Annexure-B is required for


further payment procedure.
4.
5.

The revised drawing according to site requirement is enclosed for review and
approval.
The detailed estimate prepared/based according to the Contract No SHK-001
(Package-1) and WAPDA C.S.R 2013 Zone 4 is enclosed for reference at
Annexure-A.

3. Now as per above quoted correspondence and clarified in above Para 1 and 2, the
length of wall is fixed in the drawings approved, rate allowed in the contract BOQ
and rate submitted for approval of variation, the amount allowed has been fixed Rs.
14,849,841/- regardless the length of wall to be constructed which can increase or
decrease as per site requirement and hence corresponding amount shall change.
Accordingly the final cost shall be adjusted and allowed.
It is therefore requested to review the approval of revised drawing as already requested
and amount keeping in view the terms and conditions quoted in our letter at Sr. No. 2,
otherwise it shall not be possible for us to proceed for the execution of this work.
Thanks and Regards
Yours sincerely

Copy to:
1. Project Director (EHV-II) NTDC, Hyderabad.
2. Executive Engineer (EHV-II) NTDC, Hyderabad.
3. Chief Engineer Barqaab, Ali Complex, 3rd Floor, 23-Empress Road, Lahore.
4. Project Manager Barqaab, Saif Plaza, Jahaz Chowk, Shikarpur.

___________________________________________________________________________
17/2 Block D, Model Town , Lahore Pakistan
Tel: (92 42) 35845017 Fax: (92 42) 358915017 E-mail. Neie.shk001@gmail.com