The contractor shall:
- Construct an aggregate motor pool and vehicle parking area within a fenced area, splitting it into inbound and outbound sections with two vehicle and personnel gates each. The access road shall be 9.3 meters wide.
- Build aggregate sidewalks connecting the motor pool to Road H. Two sets of concrete stairs with mid-landing will be built between buildings.
- Provide native crushed aggregate around buildings within 3 meters to reduce erosion and dust, and in other traffic areas. Additional aggregate will be supplied if needed.
The contractor shall:
- Construct an aggregate motor pool and vehicle parking area within a fenced area, splitting it into inbound and outbound sections with two vehicle and personnel gates each. The access road shall be 9.3 meters wide.
- Build aggregate sidewalks connecting the motor pool to Road H. Two sets of concrete stairs with mid-landing will be built between buildings.
- Provide native crushed aggregate around buildings within 3 meters to reduce erosion and dust, and in other traffic areas. Additional aggregate will be supplied if needed.
The contractor shall:
- Construct an aggregate motor pool and vehicle parking area within a fenced area, splitting it into inbound and outbound sections with two vehicle and personnel gates each. The access road shall be 9.3 meters wide.
- Build aggregate sidewalks connecting the motor pool to Road H. Two sets of concrete stairs with mid-landing will be built between buildings.
- Provide native crushed aggregate around buildings within 3 meters to reduce erosion and dust, and in other traffic areas. Additional aggregate will be supplied if needed.
The Contractor shall construct a motor pool and unit vehicle parking area of aggregate construction located within a fenced area as indicated with the drawings in Appendix B-1. The lot shall be split in two with a separating fence for inbound and outbound vehicles including two vehicle and two personnel gates. Access aggregate road to motor pool gates shall be 9300mm wide including 2000mm widening for pedestrian access to the personnel gates. 2.3.3.3 SIDEWALKS The Contractor shall construct aggregate sidewalks to connect the motor pool with Road H. Two sets of concrete stairs will be constructed between building 101 and 100 and between building 100 and 107. Stairs shall have a landing at the midpoint between the high elevation and low elevation of the, foundations shall be below the frost depth and steel hand rails on at least one side. The stairs shall be constructed per details provided in Appendix B-1. 2.3.4 EROSION CONTROL The Contractor shall provide the following to reduce erosion and to provide dust control: a. Native crushed aggregate shall be placed around all buildings, from the face of building wall out 3m (min.).
b. Native crushed aggregate shall be placed at areas of anticipated foot or vehicle traffic.
c. Replacement aggregate shall be provided at areas that are found to be deficient based upon discussions with the Contracting Officer.
Buildings that do not have aggregate, or need additional gravel and that do not meet these requirements are: Building Number Building Description 100 Vehicle Maintenance Building 101 Vehicle Maintenance Building 106 Fueling/Administration Transportation Battalion 107 Vehicle Parts Warehouse 108 Logistic Warehouse 109 Medical Warehouse 110 Generator Building 111 Laundry Building 114 Medical Clinic 115 Training Building 116 Recreation Building 118E Billeting NCO/Enlisted 118W Billeting NCO/Enlisted 119 Billeting Officers 120 Billeting Female 122 Administration Building 123 Administration Building Security W912DQ-13-R-4034