You are on page 1of 1

1.

0 PROJECT TITLE

Designing a suitable cooling system so that the tank MBR-01 and MBR-02 has a surface
temperature around 22
o
C after the medium mixer and root is stored into the above tanks.

2.0 PROJECT BACKGROUND


3.0 OBJECTIVE

a) To reduce the temperature of MSR-21 (medium mixer and sterilization tank) to be 22
o
C-
24
o
C after a certain period.
b) To reduce the total time taken of MSR-21 (medium mixer and sterilization tank) to
maintain its coldness around 22-24
o
C.
c) To maintain the surface temperature of MBR-01 and MBR-02 within 22
o
C or less.

4.0 METHODOLOGY

You might also like