Professional Documents
Culture Documents
Turhal Enh Deplase Projesi
Turhal Enh Deplase Projesi
POZ NO
5.1.2.2
9.3.05
009.3.06
11.4.06
011.5.08
011.6.1.01
011.7.01
011.7.04
011.8.1.01
011.8.1.04
027.1.1
30.1.2
030.2.1
BRM
KG.
KG.
KG.
AD.
AD.
AD.
TK.
TK.
TK.
TK.
AD.
M.
AD.
MKTAR
32439
3572
275
6
6
717
45
27
51
27
38
190
38
1.30
4.86
4.88
28
5.14
12.58
12.61
31.28
12.85
31.92
2.14
2.21
22.54
7.98
2.99
2.01
11.92
0
4.14
10.31
13.39
13.39
17.99
8.91
11.09
107.33
DEMONT BR.FYATI
TOP.FYATI
DEMONTAJ
POZ NO
5.1.2.2
9.3.05
011.6.1.01
011.7.01
011.7.04
011.8.1.01
011.8.1.04
MALZEMENN CNS
B.A Hava Hatt Galv. Ve Galv. Civatal Demir Direkler(TOPLAM)-MALZEME
RAVENAWG1/0 (220.52 Kg/Km ) elik-Al iletken
K1 TIPI zolatr (Normal Tip)
TEK ASKI TERTBATI : SWALLOW-3/0
CIFT ASKI TERTBATI : SWALLOW-3/0
TEK GERGI TERTBATI : SWALLOW-3/0 (Al Klempli)
CIFT GERGI TERTBATI : SWALLOW-3/0 (Al Klempli)
TOPLAM DEMONTAJ BEDEL
BRM
KG.
AD.
TK.
TK.
TK.
TK.
TK.
MKTAR
30000
3572
717
45
27
51
27
2.69
2.1
1.66
4.15
5.38
5.38
7.23
80,700.00
7,501.20
1,190.22
186.75
145.26
274.38
195.21
90,193.02
356,032.73
90,193.02
446,225.75
TOP.FYATI