TODAY PROGRESS REPORT-23/09/2014

1. P1HBK10CT019-FURNACE TEMP. MONITORCable termination and loop checking from FTMS


PANEL to DCS MP ok.
2. P1HBK10CT020- FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP Ok.
3. P1HBK10CT021- FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP Ok.
4. P1HBK10CT022--FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP ok.
5. P1HBK10CT023--FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP ok.
6. P1HBK10CT024--FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP ok.

7. P1HBK10CT025--FURNACE TEMP. MONITORCable termination and loop checking from FTMS


PANEL to DCS MP ok.
8. P1HBK10CT026--FURNACE TEMP. MONITORCable termination and loop checking from FTMS
PANEL to DCS MP ok.
9. CCTV (Front and Rear side)-Checking from DCS
ok.