You are on page 1of 5

Code: LLM18-QP-04.

14/FU
Rev.: 0
Date :
Total Page: 1

FIT-UP DIMENSIONAL INSPECTION


REPORT
Report No.: FUClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-FU-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-006

No.

Location

Drawing Dim.

L1

2000

L2

2931

L3

294

L4

2931

L5

294

L6

2900

L7

680

L8

2000

Actual Dim.

Deviation

Tolerance

L9

2931

10

L10

294

11

L11

2931

12

L12

294

13

L13

2900

14

L14

680

15

L15

2000

16

L16

1000

17

L17

2000

18

L18

1000

19

L19

2000

20

L20

1000

21

L21

310

22

L22

218

23

L23

310

24

L24

218

25

L25

310

26

L26

122

27

L27

310

28

L28

122

29

L29

500

30

L30

400

31

L31

500

32

L32

400

(attached)

Result

Note: Application standard EN ISO 13920:1996 class B.


Measurement implement: Metal tape.
LILAMA 18
Prepared

VKS

Inspected/Reviewed

Reviewed/Approved

Sign:

Sign:

Name:
Date:

Name:
Date:
Page 1/5

Remarks

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.:DI -

Code: LLM18-QP-04.14/DI
Rev.: 0
Date:
Total Page: 2

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-006

No.

Location

Drawing Dim.

L1

2931

L2

310

L3

218

L4

218

L5

310

L6

2931

L7

310

L8

218

L9

218

10

L10

310

11

L11

2931

12

L12

310

13

L13

122

14

L14

122

15

L15

310

16

L16

2931

17

L17

310

18

L18

122

19

L19

122

20

L20

310

21

L21

2000

22

L22

1000

23

L23

2000

24

L24

1000

25

L25

2000

26

L26

1000

27

L27

2000

28

L28

1000

29

L29

2900

30

L30

70

31

L31

2760

32

L32

680

33

L33

680

34

L34

1360

35

L35

70

Actual Dim.

Deviation

Tolerance

2
Page 2/5

(attached)

Result

Remarks

Code: LLM18-QP-04.14/DI
Rev.: 0
Date:
Total Page: 2

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.:DI Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: GROUND SUPPORT OF DUCT

Drawing No.: AJ-2440-Z30-006

No.

Location

Drawing Dim.

36

L1
L36

1220

37

L37

680

38

L38

287

39

L39

120

40

L40

460

41

L41

70

42

L42

320

Actual Dim.

Deviation

LILAMA 18
Prepared

Tolerance

(attached)

Result

VKS

Inspected/Reviewed

Reviewed/Approved

Sign:

Sign:

Name:

Name:

Date:

Date:
Page 3/5

Remarks

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2440-Z30-006

Item: GROUND SUPPORT OF DUCT

Test & Inspection


procedure

Item
No.
A

Acc.

Rej.

VISUAL CHECK FOR WELD


Fillet weld (leg length or throat
depth)

Acceptance criteria

Intermittent weld
a) Intermittent pitch
b) Weld length

Linear misalignment in
butt weld

Leg length and throat depth shall not be


less than design dimensions on drawing.
When not specified on drawing, throat
depth shall be minimum 0.7t. Where t:
thickness of a thinner plate at welded
plates.
Intermittent pitch shall be between +/-10
mm of design values on drawing.
Weld length shall be between -5 and
+10 mm of design values on drawing.
Linear misalignment shall be not excess
10% of plate thickness at welds, but
maximum 3.0mm.

Unevenness in bead surface


Depth D shall be 2 mm or less for
50mm long weld.

4
Irregularity in bead width
5

Difference in bead widths (a - b) shall be


5 mm
or less for 50 mm long weld.
a b < 3 mm

Overlap
Overlap shall be 1.5 mm. or less per 100
mm long in bead direction.

6
Undercut

Depth of undercut shall be 1.0 mm or


less.

7
Crater treatment
8

Craters shall have been treated.

Pit

No pits shall exist.

10

Slag inclusion

No included slag shall exist.

11

Crack

No cracks shall exist.

12

Spatter

Spatters shall be removed.


Conclusion

Accepted

Rejected

Remark

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2440-Z30-006

Item: GROUND SUPPORT OF DUCT

Item
No.

Test & Inspection


procedure

Acceptance criteria

Acc.

VISUAL CHECK FOR SHAPE/SIZE

Contused wound, hammer


wound, irregularity, etc.

These wounds shall be ground for


inconspicuous and smooth surfaces.

Finished conditions after


removing temporary jigs used
during manufacture.

Smoothing shall reach the base


metal. Concave portions shall
be repaired

Contamination, stuck foreign


Cleaning has been done. No foreign
materials, and foreign materials
materials shall exist.
left in equipment.

Inclination, bend and deflection.

These defects shall not been visually


detected.

Matching marks:
1) Orientation marks
(00,900,1800,2700)
2) Center line mark

Marking shall be made.

Finished conditions at convex


and corner portions (for lined
products).

Finish shall be smooth (min. 2R).

Finished conditions at concave


and corner portions (for lined Finish shall be smooth (min. 5R).
products).

Corners in bolt holes mounting


strainers for water collecting
plates, lining attaching internal Parts to be lined shall have corners
parts, external surfaces of
chamfered (min. 1C).
flanges, and bolt holes in
flanges.
Conclusion
LILAMA 18
Prepared/Inspected

Sign
Name:
Date:

Inspected/Reviewed

Accepted

Rej.

Rejected

VKS
Reviewed/Approved

Remark