EHV Over Head Line & Under Ground Cable Protective Regulations
PREFACE
Dubai is one of the renowned
cities within the Gulf countries,
as well as internationally, for
business, security & tourism, which
is becoming one of the modern
citiy of the world. Therefore,
reliability of Electricity becomes
one of the basic requirements for
modernization.
Electricity is one of the basic needs, for the human
beings health, education, business, agriculture,
transportation, communication, industrialization &
etc. This is to be considered a measuring parameter
of the citizens living standard, industrialization
and economic growth for a country. The mentioned
parameters will affect, if there is shortage of electricity
or frequent failure, due to any reasons.
Transmission lines are the backbone of electricity
network which transmit power from generating
stations to distribution system, for supplying power to
the customer.
DEWA 400 / 132kV OHL & Cable lines are in open fields
and passing through desert / hilly terrain, urban areas
and crossing roads / bridge / underpass / canals &
utility services etc.
CHAPTER 1
Note:
EHV Over Head Line & Under Ground Cable Protective Regulations
Double Circuit
10
Single Circuit
EHV Over Head Line & Under Ground Cable Protective Regulations
11
12
132kV & Fibre Opticcable in 50cm Wide Trough in Congested Area Due to Inadiquate Space
EHV Over Head Line & Under Ground Cable Protective Regulations
13
14
EHV Over Head Line & Under Ground Cable Protective Regulations
15
Cable Laying Method Directly Buried 132kV Power / Pilot / F.O. Cable
16
EHV Over Head Line & Under Ground Cable Protective Regulations
17
18
1.4 Accessories
A. Cable Accessories
1.4.1 Cable Joints & Terminations
Cable joint and termination is the integral part of the Transmission under ground lines system as a whole.
Note:
a. Vertical mounted
EHV Over Head Line & Under Ground Cable Protective Regulations
19
20
1.4.9 Installation of Permanent Height limit gantry at road crossing tower location
EHV Over Head Line & Under Ground Cable Protective Regulations
21
1.4.11 Installation of no dumping Sign board at OHL to restrict the dumping of waste materials in OHL corridor
22
CHAPTER 2
24
Sl.No.
Hazards
Works within & around the Transmission Lines without obtaining NOC, violation
of NOC condition & Method statement
High
High
High
High
EHV Over Head Line & Under Ground Cable Protective Regulations
25
26
Precautionary measures
Hazards
level
Contractor works within & around the Transmission lines to be allowed with
valid NOC & following all NOC conditions / method statement.
Low
All under ground cables should be identified & protect at the work areas.
Low
OHL clearance shall be confirmed & height limit gantry shall be provided to
work under OHL.
Low
Ensure manual excavation over / in the close vicinity of the Transmission lines.
Low
CHAPTER 3
3.1.2 Purpose
3.1.3 Scope
28
EHV Over Head Line & Under Ground Cable Protective Regulations
29
30
EHV Over Head Line & Under Ground Cable Protective Regulations
31
Road work
EHV Over Head Line & Under Ground Cable Protective Regulations
33
C.
Installation of Pipelines.
EHV Over Head Line & Under Ground Cable Protective Regulations
35
of
chamber
and
36
EHV Over Head Line & Under Ground Cable Protective Regulations
37
J.
38
k.
Cable diversion contract No., Cable
manufacture name, Cable test report, Data
of cable laid, Cable type and size, No. Of
cables, Distance between cable centre to
centre and cable circuit Name.
l. Cable joint details i.e. Coordinates
(Four corners), Joint type, Jointer name and
date, Joint Manufacture name.
EHV Over Head Line & Under Ground Cable Protective Regulations
39
40
EHV Over Head Line & Under Ground Cable Protective Regulations
41
Contact details
To
Senior Manager
Senior Manager
Infrastructure
information & permit
Dept.
Connection services
Dept.
Location
P.B.No.
564
564
564
Emirates.
Dubai
Dubai
Dubai
Tel.
04-3072603
04-5066445
04-5066826 / 827
Fax.
04-3245545
04-5066793
04-3984655
Dept.
Senior Manager
42
CHAPTER 4
20cm
DANGER
20cm
15cm
DANGER
15cm
Rear view
20cm
75cm
DANGER
20cm
15cm
Rear view
75cm
Front view
44
DANGER
Front view
15cm
EHV Over Head Line & Under Ground Cable Protective Regulations
45
46
EHV Over Head Line & Under Ground Cable Protective Regulations
47
Protection Slab Details For Road Construction On Top Of The 132kV Trough / Cable
9. Parking
installation: Parking (Asphalted or
Interlocking Tiles) is allowed above the existing 132kV
cables in trough or direct buried Fiber optic / Pilot
Cables and the following requirements and additional
protections should be met and provided respectively.
a. Providing of protection / spare duct as shown in the
Figure: 4.1.8 & 4.1.9.
b. No part of parking area should be constructed over
underground cable joint and flush type Link box.
48
Protection Slab Details For Road Widening On Top Of The 132kV Trough / Cable
11. No Blocking of Access: Entrance to DEWA substation
and access to DEWA Corridor should not be blocked
for the new project / work by any means temporary
or permanently
12. Backfilling: Backfilling of transmission cable route
to be carried out as per DEWA standard. Backfilling
materials / excavated soil or any other materials
which is used for placement of buried pipe shall not
be left at the site. The stored / dumped materials or
soil shall be disposed immediately and the site shall
EHV Over Head Line & Under Ground Cable Protective Regulations
49
50
EHV Over Head Line & Under Ground Cable Protective Regulations
51
52
2. Crash barrier: Temporary concrete crash barriers need to be installed around nearby tower foundation
Fig 4.1.16
EHV Over Head Line & Under Ground Cable Protective Regulations
53
Minimum Horizontal Clearence From 400 / 132kV OHL Tower Foundation To The Edge Of The Road,
When The Line & The Road Is Running In Parallel
54
4. Vertical Clearance: Minimum vertical clearance of about 16.5 and 15m to be ensured from the lowest
conductor to the finished road level for 400kV and 132kV OHL respectively.
Fig 4.1.18
Minimum Vertical Clearence From Bottom Conductor of 400 / 132kV O / H Line To The Top Of The Road Level
For High Way / Secondary Road (considering a maximum conductor temperature of 80 degree Celsius)
EHV Over Head Line & Under Ground Cable Protective Regulations
55
56
EHV Over Head Line & Under Ground Cable Protective Regulations
57
58
Fig 4.2.2 Protection of direct buried oil filled cable inside wooden box with supporting
Typical Protection for Single Group Of 132kV Oil File Filled Cables
EHV Over Head Line & Under Ground Cable Protective Regulations
59
60
EXISTING G.L
5.0mtr.
PROP. TRENCH EXCAVATION
Minimum Horizontal Clearence From 132 / 400kV / O / H Line Tower To Prop. Trench Excavaion
EHV Over Head Line & Under Ground Cable Protective Regulations
61
62
EHV Over Head Line & Under Ground Cable Protective Regulations
63
64
EHV Over Head Line & Under Ground Cable Protective Regulations
65
66
EHV Over Head Line & Under Ground Cable Protective Regulations
67
Note:
Width of the OHL corridor
varies from one to another
tower location.
20m - Minimum horizontal
clearance from 400kV
outer conductor
15m - Minimum horizontal
clearance from 132kV
outer conductor
68
EHV Over Head Line & Under Ground Cable Protective Regulations
69
70
EHV Over Head Line & Under Ground Cable Protective Regulations
71
72
EHV Over Head Line & Under Ground Cable Protective Regulations
73
Note: Width of the OHL corridor varies from one to another tower location.
No Tree Plantation Allowed Inside DEWA Transmission OHL Corridor
74
Fig 4.7.2
Minimum Clearance requirement for Lighting Pole Installation from OHL conductor
EHV Over Head Line & Under Ground Cable Protective Regulations
75
76
3 Construction parking:
a. Parking area construction is not allowed
within DEWA Transmission OHL Corridor. OHL
Corridor details shall be confirmed from TMD
NOC center.
b. DEWA patrolling access road must be repaired
by the contractor, if damaged.
c. Leftover / Waste / debris materials should
be removed from the OHL Corridor, after the
completion of work.
d. Parking of Light / Heavy Vehicle within the OHL
corridor is prohibited.
CHAPTER 5
5.1 Patrolling
following reasons:
To ensure healthiness of the remaining cables /
lines in Ring network feeder, if any one or more
of the Ring network feeder is / are shut down
for repair and maintenance or s requested for
approved purposes.
5.1.4 Special Patrolling
This type of patrol is acted upon the request
from concerned parties to exert additional
attention (extra patrol) to specific circuit on the
following reasons:
79
80
EHV Over Head Line & Under Ground Cable Protective Regulations
81
82
CHAPTER 6
84
EHV Over Head Line & Under Ground Cable Protective Regulations
85
86
Table 6B
EHV Over Head Line & Under Ground Cable Protective Regulations
87
88
CHAPTER 7
90
Moreover, we are providing Awareness Training to contractors Staff to improve their safety skills to work in the
vicinity of 400 / 132kV OHL / cable lines and being certified from our end.
In this Hand Book, are explained the following items in different chapters in order to protect the existing 400 /
132kV Transmission Lines network as below:
1. Transmission Lines & Accessories
4. Protective Regulations & precautionary measures for the protection of Transmission Lines
5. Implementation of NOC conditions & precautionary measures
6. Legal Actions against violators
The above items will helps all contractors, consultant, utility depts & private parties for proceeding NOC
application, with proper method statement for safe construction works in & around the transmission lines.
Furthermore, all concern parties will get general / technical knowledge about the transmission OHL & Cable lines
and safety precautionary measures to avoid unwanted damages.
All are welcome for Queries, clarifications and suggestion if any.
We hope contractor, consultant, utility departments & private parties will follow DEWA protective rules &
regulations, for the uninterrupted electricity supply, in the Emirates of Dubai.
EHV Over Head Line & Under Ground Cable Protective Regulations
91
Connection Services
NOC
No Objection Certificate
DM
Dubai Municipality
OHL
F.R.L
F.O
Fibre Optic
R.C.C
GIS
GPS
R T A
HDD
TMD
TP
Trial Pit
LILO
UG
Under Ground
92
Contact Us
For any clarification related to any information mentioned in the Hand Book, please send your queries / comments