TITLE: STANDARD OPERATION PROCEEDURE


1. Objective

2. Scope

3. Responsibility

4. Records

5. Reference

6. Instructions

Black Start Up Power (6.6 KV):

Electrical Engineer / Shift Electrician

BLACK START UP POWER (6.6 KV):


How to Switch ON Main plant I/C Breaker.

Ensure UAT breaker (Panel No. 08) in Rack out position.

Ensure DC supply 220 V DC/UPS supply 110 V/AC supply 240 V available in BPT 1/2/3 panel.

Switch ON MCB of 110 V / 240 V AC / 220 V DC in BPT 1/2/3 panels.

Then switch ON MCB of 110 V UPS / 240 V AC / 240 V DC in BC I & II / UAT / Main Plant I/C
Panel.

Ensure all panels AC/DC Fuses healthy.

Ensure all panel relays in healthy condition.

Also reset Enunciator window if glowing.

Now check incoming voltage on main plant incomer panel voltmeter.

Now main plant Incomer and B/C I & II HT breaker keep in service position.

Ensure service / Test. / Movement / Removable handle in service position.

Then Switch ON main plant I/C breaker.

Now reset under voltage relay on Bus-3 I.E. BPT-03.

Now switch DS-39 Auto/Independent/Manual Switch keep on Independent mode which is


located on BC-I.

Now switch ON B/C-II breaker.

Reset U/V relay of BPT-02 i.e. Bus-2.

After resetting u/v bus-2 Switch ON BC-I breaker.

Then reset u/v on Bus-I i.e. BPT-01.

PREPARED BY: C.PALANI

REVIEWED BY: V.V.HAJARE

APPROVED BY: S.D.SHETTY

Electrical In-Charge(ENMAS)

Electrical FIL (CPP)

General Manager (CPP)