Rev. # : 00
Tag # QK 111G
Job Report
MACHINERY MAINTENANCE UNIT
Dated: 06 - 08- 14
QK-111 G
HISTORY-
Last Inspection
Old oil was replaced with new one (Shell Morlina 220).
Prepared By : KMK
Page 1of 4
Form # : MAC-55
Rev. # : 00
Tag # QK 111G
Job Report
Dated: 06 - 08- 14
ALIGNMENT READINGS
Motor/Spacer
Axial
0
+0.0
5
+0.0
2
UCR
Side
+0.0
7
Gear
Box/Spacer
Gear
Box/Spacer
Axial
Radial
+0.0
4
-0.01
UCR
Side
0.03
Prepared By : KMK
-0.02
-0.01
-0.03
UCR
Side
Page 2of 4
Form # : MAC-55
Rev. # : 00
Tag # QK 111G
Job Report
Dated: 06 - 08- 14
CLEARANCES:
-
Backlash
Found: 0.35 mm
Recommended: 0.25 mm 0.50 mm
FAN
9.6
9.6
6
9.5
9.6
9.5
2
1
9.6
9.6
9.6
Prepared By : KMK
Page 3of 4
Form # : MAC-55
Rev. # : 00
Tag # QK 111G
Job Report
Dated: 06 - 08- 14
TEAM
ENGINEER
-
Khalid Niazi
Section Manger-Machinery
STAFF
-
Bahar Shah
Sup
M. Jamil
Sup
Qaiser Abbas
Senior Technician
Muhammad Ali
Senior Technician
COS
-
Amin Khan
Anas Wahab
Prepared By : KMK