The site DMM 3091 was inspected during a preventative maintenance review. The supply voltage was checked at 54.8 VDC and MW/BTS equipment was cleaned of dust. The DCDU power supply was tightened and the ODU connector bracket was tightened. The jumper cable connectors and combiner at the roof top were also cleaned.
The site DMM 3091 was inspected during a preventative maintenance review. The supply voltage was checked at 54.8 VDC and MW/BTS equipment was cleaned of dust. The DCDU power supply was tightened and the ODU connector bracket was tightened. The jumper cable connectors and combiner at the roof top were also cleaned.
The site DMM 3091 was inspected during a preventative maintenance review. The supply voltage was checked at 54.8 VDC and MW/BTS equipment was cleaned of dust. The DCDU power supply was tightened and the ODU connector bracket was tightened. The jumper cable connectors and combiner at the roof top were also cleaned.