WORK PACK CHECKSHEET
Project Name:
Project number:
Client:
Job number:
Workpack title:
Discipline superintendant:
Equipment numbers:
Discipline supervisor:
Work Pack Index
Supplied/attached
(Tick boxes below)
Job No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Drawings Supplied
Yes
No
Site instruction required?
Yes
No
Yes
No
Yes
No
Yes
No
Design changes
Reference
(Form PRJ-01-T04)
Job Description
(Generated by supervisor)
Engineering Required
Risk Assessment Required?
(Generated by contractor)
Timing requirement
(Generated by planners)
(to contractor if applicable)
Vendor Requirements
(Consult vendor list)
Field Inspection Checklists
(Verify with QC department)
Other Requirements
Documentation required from GRDM supervisor
Punch List submitted
Yes
No
Red line M/up Dwgs Submitted
Yes
No
Punch List Category 1 and 2
completed Handover area
Yes
No
Contractor MDR submitted
Yes
No
Design change form submitted
Yes
No
Checksheets submitted
Yes
No
Yes
No
(Form PRJ-01-T06)
Punchlist Category 3 and 4
complete Contractor works
complete
Signed