Professional Documents
Culture Documents
Battle of Mega Bridges (Final)
Battle of Mega Bridges (Final)
10.000m
20.000m
30.000m
40.000m
50.000m
Padma Bridge
Minpu Bridge
Total length: 3,610m
Project Cost (est.): not available
Expected Date of Completion: not available
Design: Cable-stayed bridge (double-decker)
Carries: S32 Shenjiahuhu Expressway (Upper deck); road and pedestrian traffic
Hardanger Bridge
Total Length: 1,380m
Project Cost (est.): 200 million euro
Expected Date of Completion: 2013
Design: Suspension bridge
Carries: Two lanes of roadway and a bike/walkpath
Bridges Asia 2013 tackles Efficient Design, Construction and Maintenance of Long Span Bridge
Projects. Attend the conference and get access to visits, exclusive presentations and case
studies on the mega bridge projects in Asia, including:
To find out more, visit www.bridges-asia.com. To attend the conference, email enquiry@iqpc.com.sg or call +65 6722 9388.
Disclaimer:
Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may
still understandably occur in some cases. If you believe that a serious inaccuracy has been made please let us know. This
infograph is provided for information purposes only. IQPC accepts no responsibility whatsoever for any direct or indirect
losses arising from the use of this report or its contents.
References:
http://en.wikipedia.org/wiki/Hong_Kong%E2%80%93Zhuhai%E2%80%93Macau_Bridge
http://en.wikipedia.org/wiki/Padma_Bridge
http://en.wikipedia.org/wiki/Penang_Second_Bridge
http://en.wikipedia.org/wiki/Hardanger_Bridge
http://en.wikipedia.org/wiki/Minpu_Bridge
http://en.wikipedia.org/wiki/Danube_Bridge_2
http://www.nssmc.com/en/product/use/case/bridge/nyattan_bridge.html/
http://www.intellasia.net/construction-on-nhat-tan-bridge-to-be-completed-by-sep-2014-189144
http://talkvietnam.com/tag/nhat-tan-bridge-project/