You are on page 1of 1

A.

Already AddedGrid Substations:


1. Kulaura 132/33 kV grid Substation, Capacity 2x25/41 MVA
2. Sherpur 132/33 kV grid Substation, Capacity 2x35/50 MVA
3. Satmasjid 132/33 kV grid Substation, Capacity 2x80/120 MVA
Transmission Line:
1. Old Airport-Sajmasjid 132 kV (U/G) double circuit transmission
line: 16.588 circuit kilometer
2. Fenchuganj Kulaura 132 kV double circuit transmission line: 50
circuit kilometer
3. Jamalpur Sherpur 132 kV double circuit transmission line: 40
circuit kilometer
Grid Substations Capacity Up-gradation:
1. Four substations capacity upgrade: 225 MVA

B. Will be AddGrid Substations:


1. Barisal 230/132 kV grid Substation, Capacity 2x225/300 MVA
Transmission Line:
1. Barisal Bhola 230 kV double circuit transmission line: 125
circuit kilometer

Summary:
1. Substationa. 230/132 kV Substation Capacity Addition
b. 132/33 kV Substation Capacity Addition

: 600 MVA
: 422 MVA

c. 132/33 kV Substation Capacity up-gradation : 225 MVA


2. Transmission Linea. 230 kV transmission line: 125 circuit kilometer
b. 132 kV transmission line: 106 circuit kilometer

You might also like