Activity
Reference
1.Visual check
1
Electrical cable
trays
2.Dimension check
Relevant drawings
3.Cable tray
Inspection check list
1.Visual check
Relevant drawings
3.Check connections
and Lugs
4.Megger reading
electrical power
cables
1.Check as per drawin
Electrical Panel Boards
Relevant drawings
2.Earthing
Installation of
electrical lighting
and switch socket
Installation of
electrical
equipments
1.Check instalation as
per drawing
2.Check end connectioRelevant drawings
3.Lighting protection
instalation
4.Functional check
1.Check instalation as
per drawing
2.Check end connectio
Relevant drawings
3.Functional check
4.Check earthing
QAP (ELECTRICAL/FAS)
S.NoItem
1
Description
a) Cable Trays
b)Conduits MS /PVC
c) Cables
d) Electrical Panels (DB/UPS)
e)Lights
f) Switches and sockets
g)Smoke detector
h)Fire alarm
Contrac
tor
F
F
F
F
F
F
F
F
F
2 Material Identification check against as per manufacturers test certificates and approval
a) Cable Trays
b)Conduits MS /PVC
c) Cables
d) Electrical Panels (DB/UPS)
e)Lights
f) Switches and sockets
g)Smoke detector
h)Fire alarm
3 Visual Check
a) Cable Trays
b)Conduits MS /PVC
c) Cables
d) Electrical Panels (DB/UPS)
e)Lights
f) Switches and sockets
g)Smoke detector
h)Fire alarm
4 Installation
a) Installation as per drawing
b) Alignment checks
c) Hanging arrangements checks
d) Cable pulling checks
e) Panel installation as per relevant drawing
f) Earthing checks
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
5 Termination
a) Check end connections as per relevant drawing
b) Tagging as per good engineering
c) Preparation of as built drawing
d) Earthing check
F
F
F
F
6 Commissioning / Charging
a) Check end connections as per relevant drawing
b) Tagging as per good engineering
c) Ferruels as per good engineering
d) Proper Earthing check
e) Functional check
F
F
F
F
F
OwnerConsultant
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R