Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Table of Contents
0
REVISION RECORD........................................................................................................................... 2
INTRODUCTION ................................................................................................................................. 3
2.1
Alignment ............................................................................................................................................ 4
2.2
CALCULATIONS ................................................................................................................................ 5
4.1
General ................................................................................................................................................ 6
4.2
4.3
Recommendations .............................................................................................................................. 6
REFERENCES .................................................................................................................................... 8
APPENDIX:
Appendix 1
Ground Information
Appendix 2
Appendix 3
Appendix 4
01/08/2012
Page 1
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
REVISION RECORD
Revision
Description of Amendments
Date
First Issue
20/06/2011
Final Submission
13/09/2011
01/08/2012
01/08/2012
Page 2
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
INTRODUCTION
Contract 918 consists of design and construction of station at Tan Kah Kee, the twin
bored tunnels from the cross over box northwest of Tan Kah Kee Station (TKK) to the
station at Sixth Avenue (SAV) within C917, and another twin bored tunnels between
the Tan Kah Kee station (TKK) and the station at Botanic Garden (BTN) to be
constructed under the C919.
The Tunnel works include twin bored tunnel with inner diameter of 5.8m and outer
diameter 6.35m as well as two mined cross passages. The total length of the twin
bored tunnel is about 1.483 kilometres. The length of twin bored tunnel from Cut Cover
Tunnel to Sixth Avenues Station is 0.558 kilometres and the length of twin bored tunnel
from Tan Kah Kee Station to Botanic Garden Station (BTN) is 0.925 kilometres.
This report provides estimate of required face pressures to be applied and controlled
during driving from TKK to BTN station only. The estimated TBM face pressure for
bored tunnels between CCT and SAV station is covered by a separate report.
The twin bored tunnel will be constructed by slurry tunnel boring machines (slurry
TBMs). The slurry TBM is designed to allow excavation in the varying soft ground
conditions. Pre-cast concrete segmental lining, designed to provide the final
permanent support, will be installed at the tail section of the TBM as it advances
though the ground.
The report shall be read in conjunction with drawing and geotechnical data presented
in Appendix 1 and Appendix 2.
The overall site plan of Contract C918 is presented in Figure 1-1 below.
01/08/2012
Page 3
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
2.1
ALIGNMENT
As stated above, contract C918 bored tunnel alignment features twin bored tunnels.
At Launching area:
Expo Bound Track tunnel (Left tunnel from TKK to BTN)
Bukit Panjang Bound Track tunnel (Right tunnel from TKK to BTN)
At Receiving area:
Expo Bound Track tunnel (Left tunnel from TKK to BTN)
Bukit Panjang Bound Track tunnel (Right tunnel from TKK to BTN)
As mentioned in Section 1 above, the alignment of DTL 2 for C918 commences from
the launching area which is located at the TKK station. After the launch, the TBMs will
run more or less at the same level throughout the drive.
The length of the bored tunnels is about 0.925 kilometers for each drive. Both tunnels
will be driven along decreasing chainages.
2.2
GROUND CONDITIONS
The ground conditions are interpreted based on GIBR attached in LTA consolidated
working document documents Ref [1]. The project site is located primarily in Fill
underlying by Kallang Formation and the bottom layers are comprised of Bukit Timah
Granite.
The subsurface layering can be classified into the following layers:
Fill
Various grades of Rock, i.e. Grade IV (GIV), Grade III (GIII), Grade II (GII)
and Grade I (GI)
For easy reference, the soil profile along the tunnel alignment is presented in Appendix
1.
01/08/2012
Page 4
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
CALCULATIONS
The calculation approach investigates the stability of tunnel face by considering limit
equilibrium of a sliding wedge at the face loaded by a prismatic body.
The imposed loads comprise of surface surcharge of 20 kPa and gravity loading of soil
above the sliding wedge. Ground water table at 1m below the ground surface is
considered in calculations. Both drained and undrained behaviours of relevant soil
materials are examined. Generally, recommended face pressures are derived from the
more conservative drained case.
A total of 38 sections for each TBM drive have been calculated. Selection of sections
for calculations is based on variations of overburden, and geology at the tunnel face.
The distance between the analysis sections is generally about 25m.
The calculation approach is based on Anagnostou and Kovari, Ref.[7]. This approach
has previously been applied successfully to the TBM tunnel drives for other projects in
Singapore including, the North East Line, the Deep Tunnel Sewerage System (DTSS),
the Circle Line Stages 2, 3, 4 & 5 and the Downtown Line 1.
The following design considerations are mentioned in particular:
1. The ground conditions at tunnel level and above are taken from the geotechnical
interpretive report and the geotechnical soil profile which is presented in Appendix 1.
2. TBM face pressures are derived by calculations based on the approach presented in
Ref.[7], considering the local ground conditions as well as groundwater seepage
forces at the face.
3. Seepage pressure and related temporary depressurisation at the excavation face
were considered in the analyses using drained soil parameters. Since the TBM will
be advancing at an average rate of about 10m per day, this is considered
conservative.
The input parameters used in calculation are summarized in Appendix 2 and the
results of calculations are summarised in Appendix 3.
01/08/2012
Page 5
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
4.1
GENERAL
Based on existing ground conditions at tunnel level, the required face pressures are
calculated and presented in Appendix 3.
4.2
TBM OPERATION
The twin bored tunnels will be driven using two slurry TBM for each drive.
The TBM is expected to be operated with the pressure chamber fully filled and
pressurized, such that the recommended face pressure range as provided in Appendix
3 is maintained at all times.
The tables in Appendix 3 provide the following information:
Recommended face pressure range at tunnel axis level
Recommended tail void grouting pressure range
Recommended compressed air pressure during cutterhead interventions
Hydrostatic groundwater pressure at tunnel axis level
4.3
RECOMMENDATIONS
The recommended face pressure ranges are proposed in Appendix 3.
The proposed values are based on the understanding that during TBM driving, the
following strategy will be adopted in principle:
In general, the applied face pressure shall be within the recommended face
pressure range at all times
Shop Houses:
From the findings of the CIAR, Ref. [9], the tunnel excavation needs to limit the
volume loss to 1.0% in the zone of the Shop Houses. The conclusion from that
assessment is that the volume loss of 1.0% needs to be applied for Bukit Panjang
bound tunnel only between chainage 46+020 and 45+950. According to Report Ref.
[8], Figure 4-4 the recommended minimum face pressure is 220 kPa as indicated on
the graph in Appendix 3.
DTSS:
The TBMs will be operated at target face pressures, which are typically in the range
of the local hydrostatic groundwater pressure. In this kind of operation scenario,
drastic pressure gradients between the TBMs excavation chamber and the outside
water pressure are avoided.
01/08/2012
Page 6
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Cluny Court:
From the findings of the CIAR, Ref. [9], the tunnel excavation needs to limit the
volume loss to 0.5% in the zone of Cluny Court building. The conclusion from that
assessment is that the volume loss of 0.5% needs to be applied for both tunnel
drives of Bukit Panjang and Expo bounds between chainage 46+020 and 45+950.
According to Report Ref. [8], Figure 4-1, the recommended minimum face pressure
is 300 kPa as indicated on the graphs in Appendix 3.
CCL Tunnels:
Ref. [8] includes the volume loss assessment for the above CCL tunnels (refer to
Figure 4-2). Within this zone, TBM face pressures in the range of 300kPa is
required in order to maintain the volume loss of 0.5% or below, which is the
maximum volume loss for this area in accordance with the project specifications,
Ref. [3]. During the approach of the C918 TBMs towards the CCL crossing area, the
volume loss shall be verified in monitoring sections. The recommended minimum
face pressure at the monitoring sections are indicated on the graphs in Appendix 3.
Settlements and muck volume balance shall be continuously determined to provide
the main criteria to judge the adequacy of applied face pressures.
For cutterhead intervention (refer to Appendix 4), it is recommended to initially apply
at least the stated air pressure. However, after visual inspection and verification, the
air pressure may be reduced in stages. If no are adverse soil behavior is visible at
the face and the stability of excavation face is ensured, the intervention may be
even be carried out in atmospheric conditions (free air).
The actual face pressures applied during driving and air pressures during
cutterhead interventions shall be reviewed by the TBM operation team, QP(D),
QP(S) and LTA project team on a regular basis. If necessary, the recommended
pressure values presented in this report shall be updated.
01/08/2012
Page 7
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
REFERENCES
For the preparation of this document the following data sources were used:
[1]
[2]
[3]
[4]
[5]
[6]
SIL, Additional Soil Investigation Works for C918 Tunnel Section, Borelogs
[7]
[8]
[9]
[10] Contractors Design Consultant, Interfacing of C918 Bored Tunnels with existing
CCL MRT Tunnels, Document No.: DOC/918/TUN/DCS/9062
01/08/2012
Page 8
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Appendix
01/08/2012
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Appendix
01/08/2012
Page 16
Page 1
Geotechnical Design Parameters for Bukit Panjang Bound DTL MRT Project Bukit Panjang Bound - C918
1
GW
cond
Chainage
(mDMD)
(mDMD)
Geotechnical Ground Level Top of Rail
Unit at Tunnel
Axis
10
11
12
13
14
15
Layer 2
Layer 3
Layer 4
Layer 5
Layer 6
16
17
(m)
Z1
(m)
Z2
18
19
Soil Layers Depth
(m)
(m)
Z3
Z4
20
21
22
23
(m)
Z5
(m)
Z6
kN/m3
1
kN/m3
2
24
25
Bulk Weight
kN/m3
kN/m3
3
4
26
27
kN/m3
5
kN/m3
6
28
29
kN/m2
Additional Effective Lateral
surcharge Earth Pressure
Coefficient
46+727.180
46+700.000
46+675.000
46+650.000
46+625.000
46+600.000
46+575.000
46+550.000
46+541.000
46+535.000
46+525.000
46+500.000
46+475.000
46+450.000
46+425.000
46+400.000
46+375.000
46+350.000
46+341.200
46+329.400
46+325.000
46+300.000
46+275.000
46+250.000
46+225.000
46+200.000
46+175.000
46+150.000
46+125.000
46+100.000
46+075.000
46+050.000
46+025.000
46+000.000
45+975.000
45+950.000
45+925.000
45+900.000
45+875.000
45+850.000
45+825.000
45+809.880
GIII
GIII
GVI
N-3
N-3
N-3
N-3
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV70
GV90
GV120
GV120
GV120
GV120
GV120
GIII
GIII
GIII
GV150
GV150
GV120
GIV
GIII
GIII
GV70
GV120
GV120
N-1
GV150
GV150
GV70
GV70
GV70
GII
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
101.400
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
104.000
101.000
104.000
104.000
104.000
104.000
104.500
105.000
104.500
104.000
104.000
104.000
103.750
103.500
103.650
101.300
103.500
103.200
105.100
106.000
106.300
105.600
106.250
106.500
84.700
83.900
83.100
82.400
81.600
80.900
80.100
79.500
79.500
79.500
79.500
77.900
77.100
76.400
75.700
74.800
74.100
73.400
72.600
72.600
72.600
71.900
71.100
70.400
70.300
68.800
68.300
68.100
68.100
68.140
69.950
69.800
69.750
70.000
70.500
71.000
71.500
72.200
72.650
73.300
73.800
74.000
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
F1
F1
F1
E
E
E
E
GVI
E
E
E
E
E
E
E
E
E
E
E
F2
F2
F1
F1
F1
F1
F2
F1
F1
F1
F1
F1
F1
F2
F2
F2
F1
F2
F2
F2
F2
F2
F2
GVI
GVI
GVI
F1
F2
F2
F2
GV70
GVI
F2
F2
F2
F1
F1
F1
F2
F2
F1
F2
GVI
GVI
GVI
GVI
F1
F1
F1
GVI
GVI
GVI
GVI
GVI
E
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV70
GV70
GV70
GVI
GVI
GVI
GVI
GIV
GV120
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GIII
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV50
GV90
GV120
GV120
GV120
GV120
GV120
GVI
GVI
GIII
GV150
GV150
GV70
GV120
GIII
GIII
GV70
GV120
GV120
GV150
GV70
GV70
GV70
GV70
GV
GII
GIII
GIII
GVI
N-3
N-3
N-3
N-3
GVI
GVI
GVI
GVI
GVI
GVI
GV50
GV50
GV50
GV70
GV90
GV120
GV120
GV120
GV120
GV120
GIII
GIII
GIII
GV150
GV150
GV120
GIV
GIII
GIII
GV70
GV120
GV120
N-1
GV150
GV150
GV70
GV70
GV70
GII
2.40
2.00
3.31
3.70
2.30
3.00
2.80
2.51
3.10
0.50
3.10
3.80
3.80
3.00
2.70
3.11
4.00
4.00
4.30
1.30
4.30
3.50
2.70
6.30
6.20
5.41
3.00
2.00
2.51
2.21
7.40
3.00
4.00
1.70
3.90
4.00
5.30
6.90
7.00
6.50
5.55
5.40
3.80
4.00
4.20
3.80
4.11
4.10
3.30
4.50
3.60
3.60
3.60
3.10
3.00
4.10
4.90
4.20
5.00
6.00
3.40
3.40
3.40
2.70
1.21
3.00
3.00
6.00
3.00
4.00
4.00
6.50
7.40
6.51
4.50
4.10
4.90
5.00
4.60
3.30
5.60
5.20
5.80
5.70
1.80
1.40
3.30
3.70
3.35
4.00
2.11
7.00
6.50
6.50
6.50
7.00
6.81
6.00
4.70
6.20
4.80
2.20
4.40
4.40
4.40
3.40
4.00
6.00
6.10
7.40
6.20
4.81
4.00
13.00
9.00
6.30
3.40
6.50
6.00
6.00
6.50
9.80
7.35
6.40
4.80
4.30
3.90
4.00
2.70
3.70
3.35
4.00
8.00
2.90
3.30
3.30
3.30
3.80
1.70
7.00
7.70
8.00
9.00
9.50
7.61
7.61
7.61
9.10
9.80
9.20
9.10
8.50
11.60
5.00
7.40
4.95
3.00
9.70
10.51
4.80
4.00
3.00
3.90
2.90
6.30
7.10
6.40
6.00
2.70
4.00
2.70
2.00
4.60
3.30
3.00
2.90
3.30
3.31
3.30
3.70
6.90
2.80
3.60
3.00
2.41
4.20
7.00
7.00
7.00
8.70
10.50
4.40
5.11
4.20
7.71
15.40
13.30
4.51
2.30
3.50
6.80
9.50
9.50
9.51
8.60
6.20
2.70
2.40
5.20
6.40
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
19
19
19
15
15
15
15
18.5
15
15
15
15
15
15
15
15
15
15
15
18.5
18.5
19
19
19
19
18.5
19
19
19
19
19
19
18.5
18.5
18.5
19
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19
18.5
18.5
18.5
19.5
18.5
18.5
18.5
18.5
19
19
19
18.5
18.5
19
18.5
18.5
18.5
18.5
18.5
19
19
19
18.5
18.5
18.5
18.5
18.5
15
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
18.5
18.5
18.5
18.5
23
19.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
18.5
18.5
23
19.5
19.5
19.5
19.5
23
23
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
24
23
23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
23
23
23
19.5
19.5
19.5
23
23
23
19.5
19.5
19.5
21.3
19.5
19.5
19.5
19.5
19.5
24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
Cutterhead Intervention
CHI1
46+636.000 GV50
CHI2
46+430.000 GV70
CHI3
46+341.200 GV90
CHI4
46+280.000 GV90
CHI5
46+131.000 GV120
CHI6
46+020.000 GV120
CHI7
45+870.000 GV90
103.720
103.900
104.000
104.400
103.500
103.750
105.500
81.600
75.700
73.400
71.300
67.900
69.700
72.600
FILL
FILL
FILL
FILL
FILL
FILL
FILL
E
E
E
E
E
E
E
F1
F1
F2
F1
F2
F1
F2
F1
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV70
GV90
GV70
GV70
GV120
GV90
GV50
GV70
GV90
GV90
GV120
GV120
GV90
2.50
2.71
4.00
3.00
1.80
3.70
6.90
3.80
4.70
6.00
1.61
4.00
4.45
4.80
4.50
5.00
2.20
3.80
4.50
5.60
7.61
4.50
7.60
9.50
10.00
5.30
7.00
5.30
2.13
3.50
4.20
10.00
15.30
8.60
3.60
3.17
3.17
3.17
3.17
3.17
3.17
3.17
18.7
18.7
18.7
18.7
18.7
18.7
18.7
15
15
15
15
15
15
15
19
19
18.5
19
18.5
19
18.5
19
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
0
0
0
0
0
0
0
0.50
0.50
0.50
0.50
0.50
0.50
0.50
MasterGTInfo-C918_Bukit Panjang
MasterGTInfo-C918_Bukit Panjang
Page 17
Page 1
[m]
[%]
6.60
60%
[m]
4.17
P
Lscrew
[m]
0.89
[m]
na
[kPa]
20.00
q
FS tot
[-]
1.20
FS air
[-]
1.00
(normally use 1.0 - especially in shallow ground order to avoid air blow-out)
cu
[-]
1.00
[-]
1.00
ptv
[kPa]
350
Flagfpmin
[-]
fpmin
[%]
30%
pair-0
[kPa]
80
10
Fill
F1
F2
E
GVI
GV L
GV
GIV
GIII
GII
GV50
GV70
GV90
GV120
GV150
GVI50
c'
[kPa]
0.00
0.00
0.00
0.00
3.00
4.00
4.00
50.00
300.00
500.00
4.00
4.00
4.00
4.00
4.00
3.00
f
[deg]
30.00
29.00
24.00
22.00
30.00
31.00
31.00
40.00
45.00
50.00
31.00
31.00
31.00
31.00
31.00
30.00
g
[kN/m3]
18.70
19.00
18.50
15.00
18.50
19.50
19.50
23.00
23.00
24.00
19.50
19.50
19.50
19.50
19.50
18.50
cu
[kPa]
20.00
0.00
21.00
10.00
90.00
200.00
200.00
250.00
0.00
0.00
200.00
200.00
200.00
200.00
200.00
90.00
K0
[-]
0.50
0.50
0.75
0.75
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
E
[MPa]
7.00
13.00
5.50
1.70
37.00
60.00
90.00
300.00
3000.00
6000.00
50.00
70.00
90.00
120.00
150.00
50.00
N-1
N-2
N-3
N-4
N-5
4.00
50.00
3.00
3.00
3.00
31.00
40.00
30.00
30.00
30.00
21.30
23.50
18.50
18.50
18.50
0.00
0.00
0.00
0.00
0.00
0.50
0.50
0.50
0.50
0.50
588.50
3369.20
43.40
37.00
37.00
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
4.00
4.00
300.00
4.00
3.00
3.00
3.00
3.00
31.00
31.00
45.00
31.00
30.00
30.00
30.00
30.00
21.30
23.50
21.30
19.00
18.50
18.50
18.50
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50
1433.10
1024.60
1476.90
62.40
43.00
3923.10
47.60
37.00
TBM diameter
Cutterhead opening ratio
Relevant face diameter
Length of TBM cutter head
Length of screw conveyor
Surcharge
Design Parameters
x
Input
Page 18
Page 1
Geotechnical Design Parameters for Expo Bound DTL MRT Project Expo Bound - C918
1
GW
cond
1
2
3
4
5
6
7
8
9
9a
9b
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Chainage
46+735.651
46+700.000
46+675.000
46+650.000
46+625.000
46+600.000
46+575.000
46+550.000
46+525.000
46+523.500
46+510.970
46+500.000
46+475.000
46+450.000
46+425.000
46+400.000
46+375.000
46+350.000
46+325.000
46+300.000
46+275.000
46+250.000
46+225.000
46+200.000
46+175.000
46+150.000
46+125.000
46+100.000
46+075.000
46+050.000
46+025.000
46+000.000
45+975.000
45+950.000
45+925.000
45+900.000
45+875.000
45+850.000
45+825.000
45+809.881
(mDMD)
(mDMD)
Geotechnical Ground Level Top of Rail
Unit at Tunnel
Axis
10
11
12
13
14
15
Layer 2
Layer 3
Layer 4
Layer 5
Layer 6
16
17
(m)
Z1
(m)
Z2
18
19
Soil Layers Depth
(m)
(m)
Z3
Z4
20
21
22
23
(m)
Z5
(m)
Z6
kN/m3
1
kN/m3
2
24
25
Bulk Weight
kN/m3
kN/m3
3
4
26
27
kN/m3
5
kN/m3
6
28
29
kN/m2
Additional Effective Lateral
surcharge Earth Pressure
Coefficient
GIII
S-6
GIII
S-5
GVI
S-5
S-4
S-4
GVI
GVI
GVI
GV70
GV70
GV90
GV90
GV90
GV90
GV90
GV50
GV50
GV90
GV120
GV150
S-3
GV120
S-2
GV120
GV120
GV120
GV120
GV120
GV120
S-1
S-1
GV90
GV90
GV90
GV50
GII
GII
103.800
103.000
104.000
104.000
103.700
104.000
104.000
104.000
104.000
104.000
101.400
104.000
104.200
104.500
99.100
99.000
99.000
99.200
99.000
99.700
100.400
100.300
99.800
99.500
99.200
99.000
99.300
99.100
99.000
98.000
97.900
98.300
98.300
98.300
104.000
104.200
104.500
105.500
105.000
105.200
85.000
84.200
83.500
83.000
82.000
81.000
80.500
80.000
79.000
79.000
78.629
78.000
77.700
77.000
76.100
75.000
74.600
74.000
73.500
73.000
72.200
71.500
71.100
71.000
69.900
69.000
68.700
68.200
67.900
67.800
68.100
68.600
69.200
70.000
69.300
71.500
72.200
73.000
74.000
73.900
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
E
E
E
E
E
E
E
E
F2
F2
F2
E
E
E
E
E
E
E
E
E
E
E
GVI
GVI
GVI
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
F2
E
F1
F1
F1
F2
F1
F1
E
E
E
F1
F2
F1
F2
F2
F2
F2
F2
F2
GVI
F2
GVI
GVI
GVI
GVI
GVI
GVI
GVI
F1
F2
F2
F1
F1
F1
F2
F2
F2
F2
F1
F1
F1
F1
GVI
F2
F1
F1
GVI
F1
F1
F1
GVI
F1
GVI
GVI
GVI
GVI
GVI
F1
F1
GVI
GVI
GV
GVI
GV70
GV120
GV70
GVI
GV50
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
S-6
GIII
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GV70
GV50
GV50
GV90
GV90
GVI
GVI
GV90
GV120
GV50
GV120
GV120
GV120
GV120
GV120
GV90
GV120
GV90
GV90
GV90
GV90
GV90
GV90
GV90
GV50
GII
GII
GIII
S-6
GIII
S-5
GVI
S-5
S-4
S-4
GVI
GVI
GVI
GV70
GV70
GV90
GV90
GV90
GV90
GV90
GV50
GV50
GV90
GV120
GV150
S-3
GV120
S-2
GV120
GV120
GV120
GV120
GV120
GV120
S-1
S-1
GV90
GV90
GV90
GV50
GII
GII
2.30
2.70
3.60
4.00
2.80
3.00
2.90
3.00
2.90
2.90
0.67
3.00
2.80
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.81
3.70
4.20
5.00
4.11
3.50
4.70
2.20
4.00
4.00
1.31
3.00
3.00
4.00
1.91
1.91
1.91
6.00
7.50
6.80
2.10
1.71
3.31
4.30
1.00
0.00
1.21
0.00
4.40
0.00
3.70
0.00
0.00
0.30
1.80
1.31
0.91
2.01
2.50
3.10
5.40
4.30
3.60
4.01
4.30
5.10
4.00
2.20
2.40
6.00
3.70
2.00
4.40
6.00
2.90
2.90
2.90
4.00
1.40
4.80
7.50
6.00
2.90
2.01
2.00
1.71
10.00
4.90
5.90
6.00
5.70
7.00
9.00
5.00
9.60
2.80
6.50
5.50
3.00
2.20
3.00
3.21
3.90
3.40
3.00
2.50
1.40
3.30
2.40
1.00
6.00
7.00
4.40
3.00
3.50
3.50
3.50
4.00
2.40
5.60
4.00
4.00
5.30
10.60
1.50
2.00
10.00
14.60
5.90
7.00
7.60
15.00
8.45
5.00
7.50
8.30
5.00
5.80
8.20
9.00
8.00
6.90
6.10
6.80
8.90
9.50
1.70
3.70
3.40
1.30
3.20
3.30
4.10
3.30
9.10
9.10
9.10
4.30
7.70
2.60
4.70
7.60
8.20
3.60
16.30
18.30
2.30
4.60
7.80
10.80
7.60
3.30
8.45
15.90
7.50
13.10
12.70
11.70
10.70
9.30
9.80
9.90
9.80
8.60
6.00
6.00
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
15
15
15
15
15
15
15
15
18.5
18.5
18.5
15
15
15
15
15
15
15
15
15
15
15
18.5
18.5
18.5
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
18.5
15
19
19
19
18.5
19
19
15
15
15
19
18.5
19
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19
18.5
18.5
19
19
19
18.5
18.5
18.5
18.5
19
19
19
19
18.5
18.5
19
19
18.5
19
19
19
18.5
19
18.5
18.5
18.5
18.5
18.5
19
19
18.5
18.5
19.5
18.5
19.5
19.5
19.5
18.5
19.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
23
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
24
24
23
18.5
23
18.5
18.5
18.5
19
19
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
21.3
19.5
23.5
19.5
19.5
19.5
19.5
19.5
19.5
21.3
21.3
19.5
19.5
19.5
19.5
24
24
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.30
0.50
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.30
Cutterhead Intervention
CHI1
46+635.000 GVI
CHI2
46+380.000 GV90
CHI3
46+276.000 GV120
CHI4
46+132.000 GV120
CHI5
46+035.000 GV120
CHI6
46+005.000 GV120
CHI7
45+980.000 S-1
CHI8
45+870.000 GV90
104.000
104.000
105.400
104.300
102.900
103.300
103.300
104.500
82.300
74.600
72.200
68.700
68.100
68.600
69.200
72.200
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
E
E
E
E
E
E
E
E
F1
F2
GVI
GVI
F2
F2
F1
F2
F2
GVI
GVI
GV70
GVI
GVI
GVI
GVI
GVI
GV90
GV120
GV120
GV90
GV90
GV90
GV90
GVI
GV90
GV120
GV120
GV120
GV120
S-1
GV90
3.20
3.21
3.00
3.00
2.00
2.51
2.50
4.20
1.90
5.10
3.21
1.70
3.91
4.50
5.00
3.60
3.11
2.90
10.00
9.30
6.50
5.50
3.00
3.90
5.60
5.30
10.00
8.45
5.00
5.80
8.20
6.10
3.20
8.20
2.30
8.45
12.70
11.70
10.70
9.80
3.17
3.17
3.17
3.17
3.17
3.17
3.17
3.17
18.7
18.7
18.7
18.7
18.7
18.7
18.7
18.7
15
15
15
15
15
15
15
15
19
18.5
18.5
18.5
18.5
18.5
19
18.5
18.5
18.5
18.5
19.5
18.5
18.5
18.5
18.5
18.5
19.5
19.5
19.5
19.5
19.5
19.5
19.5
18.5
19.5
19.5
19.5
19.5
19.5
21.3
19.5
0
0
0
0
0
0
0
0
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
MasterGTInfo-C918_Expo
MasterGTInfo-C918_Expo
Page 19
Page 1
[m]
[%]
6.60
60%
[m]
4.17
P
Lscrew
[m]
0.89
[m]
na
[kPa]
20.00
q
FS tot
[-]
1.20
FS air
[-]
1.00
(normally use 1.0 - especially in shallow ground order to avoid air blow-out)
cu
[-]
1.00
[-]
1.00
ptv
[kPa]
350
Flagfpmin
[-]
fpmin
[%]
30%
pair-0
[kPa]
80
10
Fill
F1
F2
E
GVI
GV L
GV
GIV
GIII
GII
GV50
GV70
GV90
GV120
GV150
GVI50
c'
[kPa]
0.00
0.00
0.00
0.00
3.00
4.00
4.00
50.00
300.00
500.00
4.00
4.00
4.00
4.00
4.00
3.00
f
[deg]
30.00
29.00
24.00
22.00
30.00
31.00
31.00
40.00
45.00
50.00
31.00
31.00
31.00
31.00
31.00
30.00
g
[kN/m3]
18.70
19.00
18.50
15.00
18.50
19.50
19.50
23.00
23.00
24.00
19.50
19.50
19.50
19.50
19.50
18.50
cu
[kPa]
20.00
0.00
21.00
10.00
90.00
200.00
200.00
250.00
0.00
0.00
200.00
200.00
200.00
200.00
200.00
90.00
K0
[-]
0.50
0.50
0.75
0.75
0.50
0.50
0.50
0.30
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
E
[MPa]
7.00
13.00
5.50
1.70
37.00
60.00
90.00
300.00
3000.00
6000.00
50.00
70.00
90.00
120.00
150.00
50.00
N-1
N-2
N-3
N-4
N-5
4.00
50.00
3.00
3.00
3.00
31.00
40.00
30.00
30.00
30.00
21.30
23.50
18.50
18.50
18.50
0.00
0.00
0.00
0.00
0.00
0.50
0.50
0.50
0.50
0.50
588.50
3369.20
43.40
37.00
37.00
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
4.00
4.00
300.00
4.00
3.00
3.00
3.00
3.00
31.00
31.00
45.00
31.00
30.00
30.00
30.00
30.00
21.30
23.50
21.30
19.00
18.50
18.50
18.50
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.50
0.30
0.50
0.50
0.50
0.50
0.50
1433.10
1024.60
1476.90
62.40
43.00
3923.10
47.60
37.00
TBM diameter
Cutterhead opening ratio
Relevant face diameter
Length of TBM cutter head
Length of screw conveyor
Surcharge
Design Parameters
x
Input
Page 20
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Appendix
01/08/2012
Page 21
Page 1
1.4
5
1.2
8
Geotechnical Unit
No.
Applicable Chainage
Segment Rings
11
12
13
TARGET
Face Pressure
at AXIS
[kPa]
Total
Octaeder stress
at AXIS
[kPa]
CALCULATED
just above
CROWN
just below
CROWN
at
AXIS
Face
Pressure
at AXIS
[kPa]
14
80%
15
110
16
Compressed
RECOMMENDED
MINIMUM
Hydrostatic
MAXIMUM
air
Intervention
Scenario
[kPa]
INITIAL Compr.
Air Pressure
for Intervention
[kPa]
INITIAL Compr.
Air Pressure
for Intervention
[kPa]
Groundwater
Pressure
at AXIS
[kPa]
Face Pressure
at AXIS
[kPa]
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
380
330
330
330
330
330
330
330
330
330
330
330
300
300
300
300
250
250
250
17
from
to
from
to
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16b
16a
16
15
14
13
12
11
10
9
8b
8a
8
7
6
5
4
3
2
1
45+810
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46+325
46+329
46+341
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+525
46+535
46+541
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+727
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46+325
46+329
46+341
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+525
46+535
46+541
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+727
x
0
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
371
380
386
404
422
439
457
475
493
511
518
522
529
547
564
582
600
618
636
655
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
404
422
439
457
475
493
511
529
547
564
547
564
582
600
618
636
655
x
GII
GV
GV70
GV70
GV70
GV70
GV150
GV120
GV120
GV70
GIII
GIII
GV120
GV70
GV150
GV150
GIII
GVI
GVI
GV120
GV120
GV120
GV120
GV120
GV90
GV50
GV50
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GIII
GII
GV70
GV70
GV70
GV150
GV150
N-1
GV120
GV120
GV70
GIII
GIII
GIV
GV120
GV150
GV150
GIII
GIII
GIII
GV120
GV120
GV120
GV120
GV120
GV90
GV70
GV50
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GVI
N-3
N-3
N-3
N-3
GVI
GIII
GIII
GII
GV70
GV70
GV70
GV150
GV150
N-1
GV150
GV150
GV150
GIII
GIII
GIV
GV120
GV150
GV150
GIII
GIII
GIII
GV120
GV120
GV120
GV120
GV120
GV90
GV70
GV70
GV50
GV50
GVI
GVI
GVI
GVI
GVI
GV70
GV70
N-3
N-3
GV70
GVI
GIII
GIII
94
93
250
259
268
97
93
259
263
98
97
97
104
283
284
105
105
99
97
265
256
249
246
249
237
234
229
222
218
218
213
200
197
200
197
195
189
184
176
172
56
54
330
330
330
330
330
330
320
320
350
350
350
350
350
350
350
350
350
350
350
320
320
300
300
300
300
300
280
280
280
260
260
240
240
240
240
240
220
220
220
200
200
200
495
509
504
525
538
532
514
520
504
534
504
522
522
570
572
576
555
513
504
528
511
497
460
497
477
469
458
443
433
418
410
383
351
383
382
376
361
349
337
324
294
292
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
366 - 500
367 - 500
367 - 500
370 - 500
370 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
350 - 500
Pressure -->
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Pressure -->
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Free air possible
Pressure -->
Pressure -->
Pressure -->
110
110
248
259
260
110
110
254
260
110
110
110
110
277
277
110
110
110
110
253
246
241
241
241
234
229
223
216
210
205
198
186
186
186
186
181
174
169
162
157
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
67
65
312
311
310
323
325
323
309
317
325
326
324
325
345
346
346
349
349
329
323
316
308
301
301
301
293
286
279
270
263
256
248
232
232
232
232
226
218
211
203
196
188
180
11
12
13
14
15
16
17
NOTE 4)
NOTE 5)
NOTE 6)
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\[C918-TBM-Face Press_B.Panjang Bound_RevB.xls]Table
NOTES:
NOTE 1)
NOTE 2)
NOTE 3)
1) These pressure values are orientated on the calculated pressures and represent the recommended range.
2) Beyond this pressure level, there is a risk of heaving the ground surface; (1+2+3)/3
3) Recommended tail void pressure range. Actual minimum pressure is defined by method statement. Actual maximum pressure is defined by segmental lining design.
4) Recommended compressed air pressure required at the beginning of cutterhead intervention. If the ground is found stable after visual inspection at each step, the pressure can be dropped in steps to atmospheric.
5) Calculated minimum compressed air pressure for intial entry. During the air pressure reduction procesdure, face stability should be verified insitu at this pressure level.
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Table
07/08/2012
Page 22
Page 2
DTSS
350
Cluny
Court
CCL
300
Vl= 1.0% at
Shop Houses
PRESSURE [kPa]
250
200
150
100
50
Verification Monitoring for CCL
46+010 and 45+935
0
46+800
46+700
46+600
46+500
46+400
46+300
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Table
46+200
46+100
46+000
45+900
45+800
45+700
CHAINAGE
Hydrostatic Groundwater Pressure at AXIS
RECOMMENDED INITIAL Compr. Air Pressure for Intervention
MAXIMUM Face Pressure at AXIS
07/08/2012
Page 23
Page 1
1.4
5
Geotechnical Unit
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9b
9a
9
8
7
6
5
4
3
2
1
from
45+810
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46 300
46+300
46+325
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+511
46+524
46+525
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+736
to
45+825
45+850
45+875
45+900
45+925
45+950
45+975
46+000
46+025
46+050
46+075
46+100
46+125
46+150
46+175
46+200
46+225
46+250
46+275
46+300
46 325
46+325
46+350
46+375
46+400
46+425
46+450
46+475
46+500
46+511
46+524
46+525
46+550
46+575
46+600
46+625
46+650
46+675
46+700
46+736
x
from
0
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
439
457
475
493
501
510
511
529
547
564
582
600
618
636
661
to
11
29
47
64
82
100
118
136
154
172
189
207
225
243
261
279
297
314
332
350
368
386
404
422
439
457
475
493
501
510
511
529
547
564
582
600
618
636
661
x
GII
GII
GV50
GV90
GV90
GV90
GV90
GV90
GV90
GV90
GV120
GV90
GV120
GV120
GV120
GV120
GV120
GV50
GV120
GV90
GVI
GVI
GV90
GV90
GV50
GV50
GV70
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GVI
GIII
S-6
GVI
GII
GII
GV50
GV90
GV90
GV90
S-1
S-1
GV120
GV120
GV120
GV120
GV120
GV120
S-2
GV120
S-3
GV150
GV120
GV90
GV50
GV50
GV90
GV90
GV90
GV90
GV90
GV70
GV70
GVI
GVI
GVI
S-4
S-4
S-5
GVI
S-5
GIII
S-6
GIII
GII
GII
GV50
GV90
GV120
GV120
S-1
S-1
GV120
GV120
GV120
GV120
GV120
GV150
S-2
GV150
S-3
GV150
GV120
GV90
GV50
GV50
GV90
GV90
GV90
GV90
GV90
GV70
GV70
GV50
GV50
GV50
GV70
GV70
S-5
GV50
GV50
GIII
GII
GIII
Applicable Chainage
Segment Rings
12
13
TARGET
Face Pressure
at AXIS
[kPa]
330
330
330
330
330
340
340
340
340
340
350
350
350
350
340
340
340
340
340
320
320
300
300
280
280
280
270
270
270
270
270
270
240
240
240
240
210
210
210
210
Total
Octaeder stress
at AXIS
[kPa]
478
475
514
513
517
547
472
487
493
498
504
518
519
515
516
494
450
483
479
465
443
422
412
405
402
383
427
406
402
366
392
392
376
371
361
344
328
312
271
274
11
12
13
CALCULATED
Face
Pressure
at AXIS
[kPa]
90
89
256
256
258
271
96
98
275
279
282
287
289
103
101
99
97
273
269
261
251
241
234
233
233
223
214
203
202
202
202
202
191
190
190
181
172
58
52
52
No.
11
just above
CROWN
just below
CROWN
at
AXIS
14
Compressed
RECOMMENDED
MINIMUM
Hydrostatic
MAXIMUM
air
Intervention
Scenario
[kPa]
As recommended
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
Free air possible
As recommended
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
As recommended
Free air possible
Free air possible
As recommended
As recommended
As recommended
INITIAL Compr.
Air Pressure
for Intervention
[kPa]
110
110
250
248
251
267
110
110
267
268
271
278
277
110
110
110
110
259
260
255
243
234
231
225
222
214
210
202
198
192
190
190
182
178
174
163
158
110
110
110
INITIAL Compr.
Air Pressure
for Intervention
[kPa]
108
107
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
110
70
62
62
Groundwater
Pressure
at AXIS
[kPa]
300
297
312
310
314
334
320
328
334
335
339
348
346
343
337
330
322
324
325
319
304
292
289
281
277
267
262
252
247
241
237
237
227
222
217
204
197
192
175
175
Face Pressure
at AXIS
[kPa]
370
370
370
370
380
380
380
380
380
380
380
380
380
380
380
380
380
380
370
370
370
370
370
370
330
330
330
330
330
330
330
330
330
300
300
300
240
240
240
240
14
15
16
17
NOTE 5)
NOTE 6)
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTES:
NOTE 2)
NOTE 3)
NOTE 4)
1) These pressure values are orientated on the calculated pressures and represent the recommended range.
2) Beyond this pressure level, there is a risk of heaving the ground surface; (1+2+3)/3
3) Recommended tail void pressure range. Actual minimum pressure is defined by method statement. Actual maximum pressure is defined by segmental lining design.
4) Recommended compressed air pressure required at the beginning of cutterhead intervention. If the ground is found stable after visual inspection at each step, the pressure can be dropped in steps to atmospheric.
5) Calculated minimum compressed air pressure for intial entry. During the air pressure reduction procesdure, face stability should be verified insitu at this pressure level.
6) This column is provided for information. Recommended face pressure values for TBM operation are provided in Column with Note 1).
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Table
1.2
110
16
80%
15
17
07/08/2012
Page 24
Page 2
DTSS
350
Cluny
CCL
300
PRESSURE [kPa]
250
Shop Houses
200
150
100
50
Verification Monitoring for CCL
46+010 and 49+935
0
46+800
46+700
46+600
46+500
46+400
46+300
46+200
46+100
46+000
45+900
45+800
45+700
CHAINAGE
CALCULATED Face Pressure at AXIS
RECOMMENDED TARGET Face Pressure at AXIS
MINIMUM INITIAL Compr. Air Pressure for Intervention
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Table
07/08/2012
Page 25
Revision B
Bored Tunnel between TKK and BTN - TBM Face Pressure Calculation
Appendix
01/08/2012
Page 26
Page 1
1.4
3
Geotechnical Unit
Segment
No.
Applicable Chainage
Ring
80%
9
1.2
110
10
just above
CROWN
just below
CROWN
at
AXIS
at
INVERT
CHI-1
CHI-2
CHI-3
CHI-4
CHI-5
CHI-6
CHI-7
from
46+636
46+430
46+341
46+280
46+131
46+020
45+870
approx.
590
443
380
336
229
150
43
GVI
GV70
GV120
GV70
GV70
GV120
GV90
GV50
GV70
GV120
GV90
GV120
GV120
GV90
GV50
GV70
GV90
GV150
GIII
GV150
GV90
GV70
GV70
GV120
GV150
GIII
GV150
GV90
Intervention
Scenario
[kPa]
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
Free air possible
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTE 1)
NOTES:
1) Indicates whether as per design free air intervention is principally considered possible
2) If free air intervention is principlally possible, this is the minimum air pressure to be applied intially at the beginning of a cutterhead intervention
3) If flowing conditions occur, the air pressure shall be increased to the recommended face slurry pressure
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Interv-Table
11
Hydrostatic
RECOMMENDED
MINIMUM
Groundwater
INITIAL Compr.
Air Pressure
[kPa]
166
215
241
254
110
262
253
INITIAL Compr.
Air Pressure
[kPa]
110
110
110
110
0
110
110
Pressure
at AXIS
[kPa]
208
269
301
318
343
327
316
10
11
NOTE 2)
NOTE 3)
07/08/2012
Page 27
Page 2
PRESSURE [kPa]
250
200
150
100
50
0
46+721
46+615
46+508
46+401
46+295
46+188
46+081
45+975
45+868
45+761
CHAINAGE
RECOMMENDED INITIAL RECOMMENDED
Compr. Air Pressure
INITIAL Compr. Air Pressure
MINIMUM INITIAL Compr. Air Pressure
Hydrostatic Hydrostatic Pressure at AXIS
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Bukit Panjang\C918-TBM-Face Press_B.Panjang Bound_RevB // Interv-Table
07/08/2012
Page 28
Page 1
1.4
3
Geotechnical Unit
Applicable
Segment
No.
Chainage
Ring
CHI-1
CHI-2
CHI-3
CHI-4
CHI-5
CHI-6
CHI-7
CHI-8
approximately
46+635
46+380
46+276
46+132
46+035
46+005
45+980
45+870
80%
9
1.2
110
10
just above
CROWN
just below
CROWN
at
AXIS
at
INVERT
approx.
589
407
333
230
161
139
122
43
GVI
GV90
GV120
GV120
GV90
GV90
GV90
GV90
GVI
GV90
GV120
GV120
GV120
GV120
S-1
GV90
GVI
GV70
GV120
GV120
GV120
GV120
GV120
GV120
GV50
GV90
GV120
GV120
GIII
GIII
GIII
GIII
Intervention
Scenario
[kPa]
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Free air possible
Pressure -->
Free air possible
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\[C918-TBM-Face Press_Expo Bound RevB.xls]Table
NOTE 1)
NOTES:
1) Indicates whether as per design free air intervention is principally considered possible
2) If free air intervention is principlally possible, this is the minimum air pressure to be applied intially at the beginning of a cutterhead intervention
3) If flowing conditions occur, the air pressure shall be increased to the recommended face slurry pressure
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Interv-Table
11
Hydrostatic
RECOMMENDED
MINIMUM
Groundwater
INITIAL Compr.
Air Pressure
[kPa]
163
225
255
274
110
110
110
110
INITIAL Compr.
Air Pressure
[kPa]
110
110
110
110
0
0
0
0
Pressure
at AXIS
[kPa]
204
281
319
343
335
334
328
310
10
11
NOTE 2)
NOTE 3)
07/08/2012
Page 29
Page 2
PRESSURE [kPa]
250
200
150
100
50
0
46+721
46+615
46+508
46+401
46+295
46+188
46+081
45+975
45+868
45+761
CHAINAGE
RECOMMENDED
INITIAL Compr.
Air Compr.
Pressure
RECOMMENDED
INITIAL
Air Pressure
MINIMUM INITIAL Compr. Air Pressure
Hydrostatic Hydrostatic Pressure at AXIS
C:\Documents and Settings\user\Desktop\918 Tunnel\Face Pressure Calculations\BTN-TKK\Rev B\Expo\C918-TBM-Face Press_Expo Bound RevB // Interv-Table
07/08/2012