Professional Documents
Culture Documents
CI001001R100 Ver 1 Indoor Dist Substation Design STD
CI001001R100 Ver 1 Indoor Dist Substation Design STD
VERSION 1
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
SCOPE ............................................................................................................... 2
SUBSTATION LOCATION.................................................................................. 3
2.1. Reticulation Costs ........................................................................................ 3
2.2. Personnel Access ........................................................................................ 3
2.3. Equipment Access ....................................................................................... 3
2.4. Ergon Mains Access .................................................................................... 4
2.5. Foundation and Earthing Requirements ...................................................... 4
2.6. Avoidance of other Services and Encroachment ......................................... 4
2.7. Area Drainage.............................................................................................. 4
2.8. Hazardous Locations ................................................................................... 5
2.9. Electric and Magnetic Fields (EMF) ............................................................. 5
2.10.
Noise ........................................................................................................ 5
2.11.
Ventilation................................................................................................. 5
2.12.
Protection from Vehicles........................................................................... 6
2.13.
Future Site Development.......................................................................... 6
3. CONSTRUCTION ............................................................................................... 7
3.1. Walls and Ceilings ....................................................................................... 7
3.2. Floors ........................................................................................................... 7
3.3. Waterproofing .............................................................................................. 7
3.4. Ventilation .................................................................................................... 8
3.4.1. Natural Ventilation ................................................................................ 8
3.4.2. Forced Ventilation ................................................................................. 8
3.4.3. Special Requirements for Ventilation Ducts.......................................... 9
3.5. Fire............................................................................................................... 9
3.6. Oil Containment ........................................................................................... 9
3.7. Hauling Eyes................................................................................................ 9
3.7.1.
For Cables .......................................................................................... 10
3.7.2.
For Transformers ................................................................................ 10
3.8. Earths ........................................................................................................ 10
3.9. Trenches .................................................................................................... 10
3.10.
Doors...................................................................................................... 11
3.11.
Light and Power ..................................................................................... 12
3.12.
Conduits ................................................................................................. 12
4. ELECTRICAL DESIGN STANDARD................................................................. 13
4.1. Transformers.............................................................................................. 13
4.2. High Voltage Switchgear............................................................................ 13
4.3. Low Voltage Switchboard .......................................................................... 14
4.4. Customers Connection.............................................................................. 14
4.5. Cables........................................................................................................ 14
4.6. Earthing ..................................................................................................... 14
4.6.1. CMEN ................................................................................................. 14
4.6.2. Separately Earthed System ................................................................ 15
4.6.3. General Requirements........................................................................ 15
4.7. Labels ........................................................................................................ 15
4.8. Fault Levels................................................................................................ 16
4.9. Safety and Clearances............................................................................... 16
5. LAYOUTS TYPICAL ...................................................................................... 17
Page 1 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 2 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
2.1.
Reticulation Costs
Extra costs may apply if the substation is located away from the property boundary due
to the extra lengths of cable required to be installed by Ergon.
The cost of consumers mains and sub-mains should also be considered. The
customers main switchboard should be located adjacent to the substation to keep costs
down.
2.2.
Personnel Access
Ergon personnel require unhindered access to the substation and associated mains at all
times. Substations must be provided with direct street access or be accessible using
permanent all weather routes. Access points must be located where they will not be
obstructed by vehicles, equipment, site usage or any other impediments.
2.3.
Equipment Access
The transformer is the largest and heaviest item in the substation. It requires double door
access directly at ground level from the street so that it can be placed outside the
substation by crane, slid and winched into final position inside the substation. Pulling
eyes are required for the winch. A transformer handling area must be allowed for
adjacent to the substation. The grade of the handling area should not exceed 1:20. A
6.2m turning circle is required for the mobile crane to navigate around corners.
A carriageway easement of 5500mm (h) X 3500mm (w) is required for the installation or
removal of the transformer from the street to the substation location. The width should be
increased on bends. The easement must have a maximum slope of 1:12.
Note the foregoing requirements must be assessed for each installation and changes
may be required based on substation location and other issues.
The combined weight of the transformer and crane is 31 tonnes.
Page 3 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
2.4.
An easement clear of all constructions may be required for the installation and the future
maintenance of Ergons mains cables associated with the substation. The width is
required to be 2 m for cables and the required width for construction of cable pits.
2.5.
2.6.
Services such as drains, sewers, piping or wiring are not permitted to pass through the
substation, the ground below it, access passageways, ventilation ducts or the substation
walls, floors or ceilings.
The substation enclosure must be free of encroachments into the floor and trench areas.
Columns, beams and walls may occupy certain areas provided they do not conflict with
locations for any equipment and their associated clearance requirements. Extra space
may be required for the substation in order to cater for the encroachment.
2.7.
Area Drainage
The area in which the substation is to be located shall be free of the risk of flooding and
storm water damage and any drains provided must be kept in working order by the
owner.
Level actuated sump pumps may be required to be fitted by the owner if drainage is not
adequate.
Page 4 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Hazardous Locations
Ergons substation equipment and access route must not be within an area which is
classified as a Hazardous Area as specified in the S.A.A. Wiring Rules.
2.9.
The Electricity Supply Association of Australia Limited (ESAA) recommends that its
members act prudently in relation to EMFs when they design and operate their systems.
In practical terms, prudent avoidance means designing the substation using standard
equipment to minimise their capacity to produce EMFs and avoid siting them adjacent to
areas which contain people or electronic equipment.
Ergons standard substation design focuses the sources of Electromagnetic Fields
towards the middle of the substation. Size and shape are critical factors in limiting
EMFs. The owner can assist to observe the principles of prudent avoidance by providing
a substation enclosure of sufficient size and appropriate shape to allow construction to
Ergons standard indoor substation.
The owner can also assist by allocating a space within the building that is clear from
electronic equipment for a distance of ten metres in any direction from the substation.
The owner should also ensure that consumers mains cabling and other associated plant
are not sited adjacent to people or electronic equipment.
If EMF shielding is required the owner shall obtain a report from an approved EMF
consultant to determine the extent of the shielding or if any is required. Installation of the
shielding shall be subject to Ergons acceptance.
2.10.
Noise
The Environmental Protection Authority (EPA), local councils and other authorities have
the power to ensure that noise originating from any premises is not the cause for
complaint. Transformers emit a constant low-pitched hum. Special precautions in siting
the substation may be necessary, particularly in locating ventilation panels and fans, to
limit noise emission if existing or prospective residential development is within the
vicinity.
2.11.
Ventilation
Substations require ventilation in order to dissipate heat losses from the electrical
equipment. Natural airflow directly to the outside of the building is preferred. This
generally incorporates louvered, weather and vermin proof ventilators in the walls and
doors. Position of ventilators shall be such as to provide cross ventilation across the
transformer. Allow for 1 sq m of Inlet Area and 1 sq m of Outlet Area per 1000 kVA.
Some substations may require forced air cooling controlled by a thermostat. The cooling
system is such that cool air is drawn through the circulation fan and blown over the
transformer. Exhaust air must be ducted independently and directly to outside air. The
fans shall be started when the temperature in the room reaches 35 degrees Celsius and
may be stopped when the temperature falls below 30 degrees Celsius. This cooling
system is the responsibility of the owner. Mechanical ventilation drawings must be
submitted to Ergon for approval.
Page 5 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
The doors for the substation must be protected from damage by vehicles. The protection
may be in the form of bollards, which can be removable. Alternatively, equivalent
protection such as a 230mm high kerb with 1500mm clearance to the substation will also
be considered.
2.13.
Substation locations which restrict future development of the site should be avoided.
Relocation of the substation would be extremely costly to the owner.
Future development of the site must not encroach onto the agreed access way to the
substation.
Page 6 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
The substation walls are to be concrete or solid masonry construction. The walls must
have sufficient structural strength to support the weight of any equipment mounted on it
without collapsing. Maximum load is 400 kN. The areas surrounding any pulling eyes
which must be attached to the wall are to be suitably reinforced so that the use of the
pulling eye does not damage the wall.
The ceiling shall be of concrete construction. It must have sufficient structural strength to
withstand 200 kN load at any point.
All materials are to be new and to meet the appropriate Australian standards.
The finish of internal walls and ceiling must be clean and smooth and must be painted
with two coats of white acrylic paint.
The walls and ceilings must be waterproof and have a 2 hour fire rating. Walls and
Floors must be impervious to any oil spillage from main transformers.
3.2.
Floors
The substation floor, including trenches, conduits, etc. is to be formed in accordance with
the positions and details shown on Ergons drawings and specifications.
The floor is to be designed by a practicing structural engineer and be capable of carrying
the loads of the substation equipment. The floor must carry a transformer load of 7300
kg on 4 points anywhere in its area.
The floor must have a level steel trowelled finish.
If the substation floor is laid on natural or filled ground an appropriate waterproofing
membrane is to be placed between the underside of the substation floor and the ground.
Provision is to be incorporated in the floor slab for any floor hauling eyes/anchors.
A transformer landing area is to be provided in all cases. The transformer loading area is
to be constructed of reinforced concrete and must have the same load bearing
characteristics as the substation floor. The minimum size of the landing area must be
2400 mm wide by 2450 mm length and will be located immediately in front of the
transformer access door/s. The landing area must have a slight slope such that water
flows away from the doors and it must be at the same relative level as the substation
floor to allow equipment to be rolled into the substation directly from the landing area.
3.3.
Waterproofing
Page 7 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
3.4.
Ventilation
Substations require special attention to ventilation in order to dissipate heat losses from
electrical equipment. Wherever possible, natural air flow to the outside of the building will
be used. Forced ventilation should be used where natural ventilation is not practicable.
Forced ventilation by means of fan(s) must be designed, supplied and installed by the
owner to Ergons requirements.
The ventilation must be sufficient to maintain a maximum room temperature of 35
degrees Celsius when all transformers are operating at nameplate rating. Air inlets and
outlets must be arranged to achieve an even distribution of air flow over the
transformers.
Substantial vertical separation is required between inlet and outlet openings. Inlet and
outlet openings should preferably be clear of pedestrian areas and must be located to
prevent entry of noxious gases such as vehicle exhausts, pollutants such as smoke,
soot, dust, ash etc. Air being removed from an internal substation must be directly and
independently ducted to outside air.
Page 8 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
3.5.
Fire
Ergon substations are designed to contain any products of a fire within the enclosure.
Self containment has the added advantage of also being self smothering and this
ensures that there is no spread of fire to other parts of the building.
All construction materials used in the substation room including walls, ceilings and floors,
doors and vents must be constructed from noncombustible materials. Any wall, ceiling or
floor shared with or adjoining another part of the building must be treated as a fire wall as
defined in the Building Code of Australia and must have a minimum fire rating of two
hours, effectively segregating the substation from the rest of the building.
It is essential that these ratings be maintained for any penetration of the wall for cables
or other services. The sealing of the penetration must be done strictly in accordance with
the manufacturer's instructions.
Ergon does not have a requirement to fit fire detection or alarm systems within the
substation. The owner is advised that where the installation of fire detection or alarm
systems is required, consideration must be given to the need for continued access for
inspection and maintenance of the system. Depending on the location of the fire
detection / alarm system it may be necessary to have a shutdown of the substation for
maintenance or inspection. Such needs shall incur an ongoing charge for providing
access to the substation and any shutdown required.
3.6.
Oil Containment
Provision must be made within the substation to contain any oil spillage (in the unlikely
event of a transformer tank failure) and slope to a common point. Spillage from
transformers needs to be contained within the substation and be 110% of oil volume as
per the AS1940 and EPA Bunding Guidelines.
This is usually achieved by draining any oil spillage into the trench. In order to prevent
any flow out through the conduits and into the surrounding stormwater system the lower
edge of the conduits shall be a minimum of 100 mm above the trench floor.
This is the minimum requirement. In some regions, due to local regulations, precautions
such as an oil trap may be required.
3.7.
Hauling Eyes
Where required, anchors and/or pulling eyes (provided by the owner) are to be installed
in the floor, walls or ceiling in the position shown on the layout drawings and in a manner
to achieve the working load specified. Normally for a single cable- trench, single
transformer substation two pulling eyes will be required - one for the cables and one for
the transformer. However further pulling eyes may be required for more complex
substations with multiple cable trenches or multiple transformers, or where access to
install cables or transformers is restricted. All anchors and pulling eyes shall be clearly
and permanently stamped to indicate its safe working load. Pulling eyes located in floors
Page 9 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
3.8.
Earths
A buried earthing electrode system is necessary for the substation. The earthing system
shall consist of earth electrodes. The system to be used, location and number of
conduits will be detailed on the approved Ergon drawings.
Additional electrodes may need to be installed outside the substation area and additional
easements may be required if appropriate earth resistance readings cannot be achieved.
Ergon will install the earthing grid prior to the floor slab being poured. Appropriate notice
shall be given to indicate when this work can be carried out. The developer shall ensure
that the earthing leads are brought through the floor into substation.
All unbonded exposed metal work within the substation will be electrically bonded to the
earthing system. This includes metal doors and reinforcing in the floor. If a part cannot
be adequately bonded, it will be constructed from a suitable insulating material instead of
metal. The developer shall provide a connection point to the floor reinforcing at a
convenient location as advised by Ergons representative.
3.9.
Trenches
Trench walls must be able to support transformer loads applied to the substation floor
within 300 mm of the cable trench. Trenches must be watertight and must not be
connected to the outside drainage system.
Provision is to be incorporated in the trench walls for any hauling eyes/anchors.
Grid type covers manufactured of galvanized steel or other approved material must be
provided and installed on all trenches. These covers must be suitably constructed to
support pedestrian traffic. Trench covers must be divided into sections of maximum 1
metre lengths, each weighing not more than 20 kg.
The trench cover when laid across the trench shall be flush with the surrounding floor
level. The minimum rebate width required to support the trench cover shall be in
accordance with the manufacturers recommendation. The cover shall fit snugly into the
rebate so that there is negligible sideways movement.
Page 10 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
3.10.
Doors
All doors and frames shall be 2 hour fire rated (except where vents are installed) and
waterproof. The owner will attach the appropriate locks and handles to suit the direction
of opening as indicated on Ergons drawing. The cylinders will be changed to fit Ergons
key when the substation is handed over.
The locks shall be such that a key only entry is provided from the outside and a hand
only from the inside.
With double doors, the door to be opened first will be nominated on the layout drawings.
The second leaf shall have pad bolts installed.
Page 11 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
2400
2400
3.11.
The owner will supply and install the light and power distribution board and the
necessary light fittings and power outlets in the substation including all wiring. Ergon will
connect the distribution board to the supply point on the low voltage board.
Where required, equipment such as exhaust fans and pumps will be provided and
installed by the owner in accordance with the specification and drawings supplied. The
wiring to these units will be undertaken by the owner.
3.12.
Conduits
The owner shall install conduits from the substation enclosure to the property boundary.
All conduits shall be orange heavy duty rigid PVC conduit conforming to Australian
Standard 2053. Quantities and sizes shall be specified on the installation drawing.
Any bends on route to the substation shall have a minimum 1830 mm bending radius.
Conduits to extend 150 mm beyond the property boundary and be direct buried in
accordance with Ergons Underground Construction Standards.
The owner may be required to supply and install a 1300 X 1000 mm minimum cable
drainage pit along the conduit route directly outside the substations trench wall.
Page 12 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Transformers
The transformers will come from Ergon Energys stores and will typically follow the
present contract and technical specifications. The substation is designed to cater for
bushings on opposite sides of the transformer.
The bushings on the transformers should be covered, preferably by using cable entry
transformers. If not, then suitable earthed metal cable covers shall be installed on the
transformer to remove all bare live connections.
The transformer ratings are 500 kVA, 750 kVA, 1000 kVA and 1500 kVA.
Up to three transformers can be installed in the one substation. The transformers must
not be permanently paralleled on the low voltage side.
4.2.
Three types of high voltage switchgear are available which will cover all applications.
I. Ring Main Unit comprising two feeder cable switches and one fused switch/circuit
breaker for one transformer,
Switch
Fuse
Switch
II. Ring Main Unit comprising two feeder cable switches and two fused
switches/circuit breakers for two transformers,
Switch
Fuse
Fuse
Switch
III. Interfeeder Tie Unit comprising three feeder cable switches and one fused switch
for one transformer.
Switch
Switch
Fuse
Switch
A three transformer substation will contain a combination of type II and I or type II and III.
Fuses will protect the 500, 750 and 1000 kVA transformers; circuit breakers will protect
1500 kVA transformers.
Page 13 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
The low voltage switchboard will have a load break switch for each transformer. The
customers supply is to be protected with either fuses up to 1200 Amp (two striple
fuses in parallel) or circuit breakers above 1200 amps. The street circuits should be
fused up to 400 amps using Ergons standard striple fuse.
In multi-transformer substations there shall be a facility for paralleling the low voltage
sides of the transformers inside the substation. Provision of low voltage parallels in the
consumers installation could be installed if the customer requests it, but must contain
suitable locking facilities only operable by Ergon Energy. Under no circumstances should
the transformers be permanently paralleled. They should only be temporarily paralleled
during switching procedures.
The low voltage board also provides the facility for supplying the substations light and
power and ventilation and sump pump equipment if installed and also contains maximum
demand indicators.
4.4.
Customers Connection
The customers supply should not come direct from the transformer bushings.
The location of the point-of-supply needs to be formalised in a written agreement. The
location is typically described as a point on the low voltage board.
4.5.
Cables
The cables installed between the transformer and the high voltage switchgear, the
transformer and the low voltage board and the low voltage board to the street should be
chosen from the standard range of cables currently used by Ergon Energy.
1. High voltage switchgear to transformer: 35 sq mm
2. Transformer to low voltage board:
a) 500 kVA: two 185 sq mm copper per phase and neutral,
b) 750 kVA: three 185 sq mm copper per phase and neutral,
c) 1000 kVA: four 185 sq mm copper per phase and neutral,
d) 1500 kVA: six 185 sq mm copper per phase and neutral.
3. Low voltage board to street: 240 sq mm
4.6.
Earthing
4.6.1. CMEN
The preferred earthing arrangement for Indoor substations is the CMEN system
which utilises common HV and LV earthing systems. This system requires a value of
the combined earth resistance to be one ohm or less.
This is generally achieved by connection to an extensive interconnected LV neutral
system. Guidelines for the application of a CMEN system are contained in the
document Guidelines for adoption of CMEN earthing systems available on the
Line Standards intranet site.
Page 14 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
4.7.
Labels
Labels are vital in the substation on the low voltage board, high voltage switchgear
and transformers. The description on each label should be determined by the
designer or the local operator. They should be ordered/manufactured and applied
prior to substation commissioning.
Page 15 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Fault Levels
50 kA
13 kA
13 kA
4.9.
Substation equipment shall be located with due regard to safety of personnel working in
the substation. A clear passageway at least 1000 mm wide shall be allowed from each
item of switchgear to the personnel access doors to the substation. A clearance of at
least 1500 mm out from the front of the high voltage and low voltage switchgear shall be
allowed for safe operations.
Equipment shall be located such that any item of equipment may be removed from the
substation with the remaining equipment in service and under load. A passageway of at
least 2500 mm wide shall be allowed for transformers and 1500 mm wide for the high
voltage and low voltage boards.
The transformers shall be sited with a clearance of 500 mm away from walls, other
transformers and switchgear in order to allow free air flow.
Page 16 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
LV and HV switchgear
o
A clear passageway at least 1000 mm wide shall be allowed from each item of
switchgear to the access door.
Page 17 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 18 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 19 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 20 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 21 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 22 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 23 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
Page 24 of 24
CI001001R100 Ver 1
Reference Owner: Ian McLeod Group General Manager Operations Distribution
Ergon Energy Corporation Limited ABN 50 087 646 062
Ergon Energy Queensland Pty Ltd ABN 11 121 177 802