Work performed

No. of
Volunteers

Man-hours
(assuming
3hrs/session

30/1/13

Drainage/resurfacing Margaretting Rd / Racecourse FP at


Margaretting Rd end

1/5/13

Drainage channel along flooded length of FP79

3.5

15/5/13

Resurfacing Margaretting Rd / Racecourse (both sides of


road)

12

29/5/13

Finishing of resurfacing with hoggin from 15/5/13

12/6/13

2-bridges along FP at Brick Kiln Pond and sundry clearance

21

26/6/13

3.8m bridge and sundry clearance along FP at Brick Kiln


Pond

15

10/7/13

Steps built up steep slope near Brick Kiln Pond

36

24/7/13

Clearance work and the preparation for 2 seats around the


Brick Kiln Pond

21

31/7/13

Further clearance work and the completion of the 2 seats at


Brick Kiln Pond

18

2/8/13

Clearance of ferns at edge of Brick Kiln Pond in preparation


for woven willow edging to pond

21

Installing woven willow edging at Brick Kiln Pond

15

15

21

16/10/13
23/10/13

13/11/13

Total manhours

Finishing and back-filling of woven willow edging at Brick Kiln


Pond. Clearance of overhanging tree branches
Repair of rutted surface of the Common caused by 4x4 car
near the Margaretting Road car park; Clearance around the
information board of the Napoleonic Fort Workings near the
same car park; Located angle-iron protruding from surface of
car-park. Dug around angle iron and hammered it below the
surface.

213.5