Professional Documents
Culture Documents
Au Price
Selling
Selling
1500.00 $/oz
48.23 $/g
6.00 $/oz
0.19 $/g
Cu Price
Cu Price
Selling
3.31 $/lb
7297.23 $/t
80.00 $/t
Mining cost
Mining dilution
Mining recovery
2.01 $/t
90.00%
100.00%
0 $/t/bench
Rock type 1
Mining CAF
Rehabilitation cost
Processing cost
Addit. Processing Cost
Metal1Rec.
Metal2Rec.
0.001
0.00 $/t
1.60 $/t
0 $/t
90.00%
80.00%
Rock type 2
Mining CAF
Rehabilitation cost
Processing cost
Addit. Processing Cost
Metal1Rec.
Metal2Rec.
0.001
0.00 $/t
1.60 $/t
0 $/t
90.00%
80.00%
0.001
MCAF
PCAF
Proceso 1
Recuperacion mina
Leyes
100%
Metal1
Metal2
2.00 g/t
3.0%
Recuperacion
Metal1
90%
Metal2
80%
Revenue = (Price - Selling Cost)*Recuperacion*ley
Metal1
86.4597232
Metal2
173.213424
TOTAL
259.673147
+Min. Recov
259.673147
Procesamiento
Costo
1.6 $/t
Ajustado
1.6
Time
Annual discounting
Average ore output rate
Days
Daily production
10%
250,000.00 t
365.00 d
684.93 t/d
Ultimate Pit
Maximize Cash Flow (LG)
Maximize resources
Use top-down bench discounting for ultimate pit and phases.
Sequencing
Use profit factors
Use price factors
Use mining cost factors
Slopes
10