Professional Documents
Culture Documents
STRUCTURAL NOTES:
1. FOR GENERAL NOTES REFER TO DRAWING S001.
2. FOR STEEL ELEMENT SCHEDULE REFER TO DRAWINGS
S310 & S311
3. FOR TYPICAL FLOOR CONNECTION AND DECK DETAILS REFER
TO S450 & S460 DRAWING SERIES.
4. FOR FLOOR DECK AND BEAM TYPE KEY PLANS REFER TO
S160, S170 & S180 DRAWING SERIES.
5. FOR OPENINGS REQUIRED THROUGH BEAM WEBS, REFER TO
S451 FOR DETAILING AND P1200 AND P1300 SERIES FOR
INDICATIVE ARRANGEMENT.
05
04
03
02
01
22/03/2013
21/12/2012
31/10/2012
31/08/2012
01/08/2012
FOR CONSTRUCTION
CONTRACT ISSUE : BP3
CONTRACT ISSUE : BP3
FINAL DESIGN FOR TENDER
FINAL DESIGN FOR TENDER
GK
GK
GK
GK
GK
00
GK
Rev.
Date
Chk
Key Plan
Foster + Partners
Riverside, 22 Hester Road
London SW11 4AN
T +44 (0)20 7738 0455
F +44 (0)20 7738 1107
Buro Happold
Consulting Engineers
17 Newman Street
London W1T 1PD
T +44 (0)20 7927 9700
F +44 (0)87 0787 4145
SSH International
Sabhan Industrial Area
Block 1, Plot 75 A
T +965 2226 5600
F +965 2226 5700
Projacs
25944 Safat
13120 Kuwait
T +965 2243 9255
F +965 2240 9897
Client
Owner Representative
Project
NBK
New Headquarters
Title
Project No.
Date
Scale @ ISO A0
028905
17/01/12
1:100
Number
Revision
S141M
05