You are on page 1of 36

Line List

User Advisory - Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The
user may only enter date in the "yellow" cells of the blank form.

Instruction # 1
Before starting, study the Form with the sample data. Consider the header data, the line data columns and the
number of lines for the largest Unit.
Instruction # 2
If you need to add columns or additional data boxes in the header area then you must unlock the form. The
password is jop
Instruction # 3
Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs.
Deg F or Bar vs. psig.
Instruction # 4
Add additional line number rows by copy and paste at the bottom of the current form.
Instruction # 5

If you made modifications to the blank form it is recommended that the same changes be made to
the "Sample" sheet also.
Instruction #6
After you have completed the modifications required to fit your project, select a new password and protect the
new "Project" or "Company" version.form.

sword protected. The

e data columns and the

unlock the form. The

ay require is Deg. C vs.

changes be made to

ssword and protect the

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 3 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 4 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 5 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 6 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 7 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 8 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 9 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 10 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 11 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 12 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 13 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 14 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 15 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 16 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 17 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 18 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 19 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 20 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 21 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 22 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 23 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 24 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 25 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 26 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 27 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 28 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 29 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 30 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 31 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 32 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 33 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name:

PIPING LINE LIST

Proj. Number:

Line Class

Insulation
Type

Line
Number

Line Size

P&ID

REV.

Unit Number:
Tracing
Type

Service or Commodity

Phase
Gas/Liq

Page 34 of 36

Line origin

Line Destination

PME:

Date:

CKR:

Date:

Revision:

By:

Design
Press
(PSIG)

Design Stress
Temp
Anal. PWHT Req'd.
(oF)
Req'd.

Project Name: Jamnagar Cumine Upgrade

PIPING LINE LIST

Proj. Number: 2007-123455

Line Number

Line Class

Line Size

Insulation
Type

P&ID

REV.

Unit Number: 20 (And prefix for all line Numbers)

20-21

2001

AGL1

3"

Ih

Unit Feed

20-21

2002

AGL1

3"

Ih

Reactor #1 F

20-21

2003

AGL1

3"

Ih

Reactor #2 F

20-21

2004

AGL1

3"

Ih

Reactor #3 F

20-21

2005

AGL1

2"& 1"

20-21

2006

AGL1

6"

20-21

2007

AGL1

16"

Ih

Tracing Type

Service or
Commodity

Phase
Gas/Liq

Nitrogen

Gas

Product

Liq

Process Vent

Gas

SAMPLE

PIPING LINE LIST

MPLE

Line origin

Line
Destination

PME:

JOP

Date:

17/10/07

CKR:

ARL

Date:

17/10/07

Revision:

Design
Press
(PSIG)

Design
Temp
(oF)

Battery
Limits

Reactor
Feed

100

300

Line 202001AGL1

Reactor #1

100

300

Line 202001AGL1

Reactor #2

100

300

Line 202001AGL1

Reactor #3

100

300

Line 202110AGL1

Reactor #1,2
&3

100

300

Reactor #1

Line 202007AGL1

100

300

Line 202006AGL1

Unit Relief
Header Line 202120AGL2

90

350

By:
Stress
Anal.
Req'd.

Yes

JOP
PWHT
Req'd.

You might also like