You are on page 1of 2

H.T.

Incoming / Out going Tie feeder operating checking list


HT TIE FEEDER CHECKLIST

Date:
1

Name of equipment

Code

Location

Incoming/ outgoing feeder No.

CHECKING LIST:S.no
1
2
3
4
6
7

8
9
10
11

12
13
14

15
16
17
18

Activity Description

Result

Proper approach and house keeping


Ensure no PTW is pending on the equipment
Ensure no person is working on the
equipment
Ensure Equipment is not charged
Availability of Main power supply and control
supply
Measure the individual phase-earth insulation
resistance (with 5000V/ insulation tester). All the
three reading shall be > 8.0 M. If the IR value
is low switch on the space heater
Check the space heater is in ON/OFF condition
Ensure all logics and protections are in service
Remove permit and DO NOT OPERATE
board from the feeder.
Put LOCAL/OFF/REMOTE selector switch in
LOCAL or REMOTE position. As per operation
requirement
Rack in the breaker/ Feeder
Switch ON control power MCB
Ensure After switching ON DC control supply
ensure Relay is in healthy condition and Breaker
Spring is charged
Ensure OFF indication on feeder is glowing
Give Clearance for Switch ON the feeder from
DCS/LCS and verify the voltage.
Check the current in various phases and record
Check the noise or any other abnormality

Remarks

Feeder Charging Time :


Parameter after Charging:S.No

Time

Voltage
R-Y

Y-B

Current (Amps)
R-B

Remarks
B

REMARKS : Entry of unauthorized person should be prohibited and caution board should be
placed.