Operative Step
360
360
360
315
315
7.0456852792
68
1635
4000
167
99
41%
75
9.375
1700
70.8333333333
106.25
996.09375
Calculation
Units per
hour
45
45
45
39.4
39.4
Cycle Time
1.3333333333
1.3333333333
1.3333333333
1.5228426396
1.5228426396
Description
Plastic
Steel
Employees
Production/D
ay
2
70
3
19
Production as per
60-40 ratio@
1200/24
35
30
9.5
20
Mitreing
Operations
Number of Operations
in 8 hour Shift
630
630
1260
1260
1260
840
Cycle Time
1.3125
1.3125
2.625
2.625
2.625
1.75
12.25
480
39.1836734694
1018.7755102041
Welding Station 2
Operations
Number of Operations
in 8 hour Shift
Chainstay/Backstay/Endplate Welding
Left Side
Right Side
Total Cycle Time
Total Time per shift in minutes
Capacity per shift
Capacity per month (units)
420
420
Cycle Time
1.1428571429
1.1428571429
2.2857142857
480
210
2730
Welding Station 3
Operations
Number of Operations
in 8 hour Shift
Front triangle/Chainstay/Backstay
assembly and welding
Frame Complete
96
5
480
96
2496
Welding Station 4
Cycle Time
Operations
Number of Operations
in 8 hour Shift
230
185
Cycle Time
2.0869565217
2.5945945946
4.6815511163
480
102.5301204819
2665.7831325301
Welding Station 5
Operations
Front Fork Blades L/R and Steering Welding
Front Fork Blades/Endplate Welding
Number of Operations
in 8 hour Shift
210
230
4.3726708075
480
109.7727272727
2854.0909090909
Cycle Time
2.2857142857
2.0869565217