Portal Frame
Portal Frame
Job No:
Sheet 1 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Problem
Analyse and Design a single span portal frame with gabled roof. The frame
has a span of 15 m, the column height 6m and the rafter rise 3m. Purlins are
provided @ 2.5 m c/c.
D
5mc/c
3m
C
F
0.6 m
0.6 m
30 m
6m
3.25 m
G
15 m
15 m
Load
Dead Load
=
=
=
=
0.17 kN/m2
0.025 kN/m2
0.100 kN/m2
0.100 kN/m2
--------------0.395 kN/m2
---------------
36 - 19
Version II
PORTAL FRAMES
Job No:
Sheet 2 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Dead load/m run
1.2
= 0.395 * 5
= 1.975 kN / m
2.0 kN/m
Live Load
0.75
0.02 (21.8
10) * 5
= 2.57 kN/m
1.3 Crane Loading
Overhead electric crane capacity
= 300 kN
= 60 kN
The extreme position of crane hook is assumed as 1 m from the centre line of
rail. The span of crane is approximately taken as 13.8 m. And the wheel
base has been taken as 3.8 m
1.3.1 Vertical load
The weight of the crane is shared equally by four wheels on both sides. The
reaction on wheel due to the lifted weight and the crab can be obtained by
taking moments about the centreline of wheels.
( 300 + 60 )
B
300
6.9 m
1m
13.8 m
MB = 0
36 - 20
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 3 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
242 kN
3.8 m
5m
36 - 21
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
1.4
Job No:
Sheet 4 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Wind Load
Vz = k1 k2 k3 Vb
Vz = 1 * 0.8 *1 * 50
Vz = 40 m/sec
0.2
36 - 22
Version II
PORTAL FRAMES
Job No:
Sheet 5 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
(b) External pressure coefficient
External pressure coefficient for walls and roofs are tabulated in Table 1 (a)
and Table 1(b)
1.4.2 Calculation of total wind load
(a) For walls
h/w = 6/15 = 0.4
L/w = 30/15 = 2.0
h
w
w
elevation
plan
For walls, A pd = 30 * 0.96 = 28.8 kN
Table 1 (a): Total wind load for wall
Cpe
Wind
Angle
Cpi
Windward
Leeward
00
0.7
-0.25
900
-0.5
-0.5
0.2
-0.2
0.2
-0.2
Cpe Cpi
Wind
ward
Lee
ward
Total wind(kN)
(Cpe-Cpi )Apd
Wind
Lee
ward
ward
0.5
0.9
-0.7
-0.3
-0.45
-0.05
-0.7
-0.3
14.4
25.9
-20.2
-8.6
-12.9
-1.4
-20.2
-8.6
5*
3.0
7.5
40.4 m 2
36 - 23
Version II
PORTAL FRAMES
Job No:
Sheet 6 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
For roof, Apd = 38.7 kN
Wind
angle
900
2.0
Cpe Cpi
Cpe
Cpe
Cpi
Wind
ward
Wind
-0.328
-0.328
-0.7
-0.7
Lee
-0.4
-0.4
-0.7
-0.7
0.2
-0.2
0.2
-0.2
-0.528
-0.128
-0.9
-0.5
Lee
ward
-0.6
-0.2
-0.9
-0.5
2.0* 15
6
5kN
2.57 * 15
6
36 - 24
Version II
PORTAL FRAMES
Job No:
Sheet 7 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
2.3 Crane Load
3.1
Load Factors
4.0
= 1.05
In this example, the following load combinations are considered, as they are
found to be critical.
Similar steps can be followed for plastic analysis under other load
combinations.
(i)
36 - 25
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
(ii)
Job No:
Sheet 8 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
5.27
2
2.635 kN
3.88
2
1.94 kN
36 - 26
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
H/2 @ eaves points
Job No:
Sheet 9 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
= 0.89/2 = 0.445 kN
Intermediate
Points
Eaves
Ridge
Note: To find the total moment @ B and F we have to consider the moment
due to the dead load from the weight of the rail and the gantry girder. Let us
assume the weight of rail as 0.3 kN/m and weight of gantry girder as 2.0
kN/m
2 0.3
*5
2
5.75 kN
36 - 27
Version II
PORTAL FRAMES
Job No:
Sheet 10 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
0.28 kN
3.88 kN
1.45 kN
3.88 kN
1.45 kN
1.94 kN
0.725 kN
3m
89.7
239.9
14.6 kN
6m
14.6 kN
3.25 m
38.85 kN
2.1 kN
15 m
Factored Load (1.5D.L+1.05 C.L +1.5 W.L)
4.2
8.55 kN.
36 - 28
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 11 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
17.1 kN
3m
8.55 kN
6m
14.6 kN
3.25 m
15 m
Factored Load (1.5 D.L + 1.05 C.L + 1.5 L.L)
4.3
Mechanisms
Beam mechanism
Sway mechanism
Gable mechanism and
Combined mechanism
36 - 29
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 12 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
5.27 kN
0.89 kN
5.27 kN
/2
0.89 kN
2.635 kN
0.445 kN
+ /2 +
+ /2)
Wi = Mp 3
36 - 30
Version II
PORTAL FRAMES
Job No:
Sheet 13 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
17.1 kN
17.1 kN
17.1 kN
/2
8.55 kN
+ 17.1 *2.5 /2
Equating Wi = We,
Mp (3 ) = 64.125
Mp
= 21.375 kNm
239.9 kNm
14.6 kN
Wi
Mp
Mp
11
13
Mp
11
13
3.69 M p
11 /13
38.85 kN
36 - 31
Version II
PORTAL FRAMES
Job No:
Sheet 14 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
External Work done,
14.6 * 3.25 *
We
11
13
239.9 *
11
13
11
1
* 38.85 * 3.25
13
2
296.6
= 296.6
Mp = 80.38 kNm.
(3) Member EG
Internal Work done,
Wi
Mp
Mp
11
13
Mp
11
13
3.69 M p
14.6 * 3.25 *
11
13
239.9 kNm
239.9 *
11
1
( 30.3 ) * 3.25
13
2
321.7
14.6 kN
Equating Wi = We, we get
3.69 Mp
= 321.7
11 /13
30.3 kN
36 - 32
Version II
PORTAL FRAMES
Job No:
Sheet 15 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Mp = 87.2 kNm
For members AC & EG, the 1st load combination will govern the failure
mechanism.
4.3.2 Panel Mechanism
Case 1: 1.5 D.L + 1.05 C.L + 1.5 W.L
4.575 0.28
5.27
0.89
5.27
0.89
2.635
0.445
239.9 kNm
14.6 kN
38.85 kN
3.88
1.45
3.88
1.45
1.94
0.725
89.7 kNm
14.6 kN
2.1 kN
36 - 33
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 16 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
5.27
5.27 0.89
0.89
2.63
0.445 5
239.9 kNm
14.6 kN
38.85 kN
4.575
0.28
3.88
1.45
3.88
1.45
1.94
0.725
89.7 kNm
14.6 kN
2.1 kN
36 - 34
Version II
PORTAL FRAMES
Job No:
Sheet 17 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Equating Wi = We, we get
6Mp = 82.56
Mp = 13.76 kNm.
Case 2: 1.5 D.L + 1.5L.L + 1.05 C.L
17.1
17.1
17.1
17.1
17.1
8.55
8.55
14.6 kN
+ 17.1 * 2.5 -
= 57.1 kNm
36 - 35
Version II
PORTAL FRAMES
Job No:
Sheet 18 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
4.3.4 Combined Mechanism
Case1: 1.5 D.L + 1.5 W.L + 1.05 C.L
(i)
/2
/2
12 m
4.575
5.27
0.89
2.635
0.445
5.27
0.89
0.28
3.88
1.45
3.88
1.45
1.94
0.725
89.7 kNm
239.9 kNm
14.6 kN
14.6 kN
38.85 kN
/2
2.1 kN
36 - 36
Version II
PORTAL FRAMES
Job No:
Sheet 19 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Equating Wi = We
4Mp = 336.75
Mp = 84.2 kNm
/2
/2
12 m
5.27
0.89
2.635
0.445
5.27
0.89
239.9 kNm
4.575
0.28
3.88
1.45
3.88
1.45
1.94
0.725
89.7 kNm
14.6 kN
14.6 kN
/2
38.85 kN
2.1 kN
36 - 37
Version II
PORTAL FRAMES
Job No:
Sheet 20 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
External Work done,
We
14.6 * 3.25 *
0.89 * 8 *
1.45 * 11 *
239.9 *
0.28 * 9 *
0.725 * 12 *
1
* 38.85 * 6
2
5.27 * 2.5 *
3.88 * 5.0 *
5.27 * 5.0 *
0.445 * 6 *
4.575 *7.5 *
3.88 * 2.5 *
0.89 * 7 *
14.6 * 3.25
1.45 * 10 *
89.7 *
1
* 2. 1 *
2
= 230.3
Equating Wi = We, we get
4Mp = 230.3
Mp = 57.575 kNm
(iii)
/6
/6
36 m
5.27
0.89
2.635
0.445
5.27
0.89
239.9 kNm
3.88
1.45
3.88
1.45
1.98
0.725
89.7 kNm
14.6 kN
38.85 kN
4.575
0.28
14.6 kN
5 /6
2.1 kN
36 - 38
Version II
PORTAL FRAMES
Job No:
Sheet 21 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Internal work done, Wi
Mp
Mp
Mp
Mp
4M p
239.9 *
0.28 *33*
5.27 * 12.5 *
14.6 * 3.25 *
1.45* 34 *
5.27 * 10 *
1
* 38.85 * 6 *
6
2
0.445* 6 *
1.45 * 35 *
4.575 * 7.5 *
0.725 * 36 *
3.88* 5.0 *
0.89 * 35 *
3.88* 2.5 *
1
( 2.1 ) (6 * )
2
89.7
We = 341.07
Equating Wi = We, we get
4Mp = 341.07
Mp
= 85.27 kNm
Mp
2
3
Mp
2
3
Mp
Mp
4M p
36 - 39
Version II
PORTAL FRAMES
Job No:
Sheet 22 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
/3
/3
18 m
5.27
0.89
2.635
0.445
5.27
0.89
4.575
0.28
3.88
1.45
3.88
1.45
1.94
0.725
239.9 kNm
89.7 kNm
14.6 kN
14.6 kN
2 /3
38.85 kN
2.1 kN
2
3
239.9 *
0.89* 7 *
2
3
0.89* 16 *
4.575* 7.5*
3.88* 2.5
We
3
293.22
0.28* 15*
14.6* 3.25
2
3
3
2
1
* 38.85 * 6 *
3
2
0.28*15 *
1.45* 16 *
89.7 *
5.27 * 2.5*
0.445* 6 *
2
3
2
3
5.27* 5 *
2
3
0.725* 18 *
1.45* 17 *
3.88*5.0 *
3
3
3
3
1
( 2.1 )*
2
36 - 40
Version II
PORTAL FRAMES
Job No:
Sheet 23 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Case 2: 1.5 D.L + 1.5 L.L + 1.05 C.L
(i)
/6
/6
36 m
17.1
17.1
17.1
17.1
17.1
8.55
8.55
89.7
239.9 kNm
14.6 kN
14.6 kN
5 /6
/6
5 /6
Mp
Mp
Mp
Mp
4M p
36 - 41
Version II
PORTAL FRAMES
Job No:
Sheet 24 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
External Work done =We
14.6 * 3.25 *
17.1*7.5 *
239.9 *
17.1* 5.0 *
17.1* 1 2.5 *
17.1 * 2.5 *
17.1* 10 *
14.6 * 3.25 *
89.7
304.1
/3
/3
18 m
17.1
17.1
17.1
17.1
17.1
8.55
8.55
239.9
kNm
14.6 kN
89.7
14.6 kN
2 /3
36 - 42
Version II
PORTAL FRAMES
Job No:
Sheet 25 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
Internal work done,
Wi
2
3
Mp
2
3
Mp
Mp
Mp
4M p
External Work done, We=
2
3
14.6 * 3.25 *
17.1* 5.0 *
239.9 *
17.1* 2.5 *
2
3
17.1* 2.5 *
14.6 * 3.25
2
3
17.1* 5.0 *
2
3
17.1*7.5 *
89.7
320.3
= 80.1 kNm
Plastic hinged is formed at 4 and 7
Mp
Mp
Mp
Mp
4Mp
36 - 43
Version II
PORTAL FRAMES
Job No:
Sheet 26 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
/2
/2
12 m
17.1
17.1
17.1
17.1
17.1
8.55
8.55
239.9
89.7
14.6 kN
14.6 kN
/2
/2
2
2
239.9 *
17.1* 2.5 *
17.1* 2.5 *
14.6 * 3.25
17.1* 5.0 *
17.1* 7.5 *
89.7
293.8
Equating Wi = We
4Mp = 293.8
Mp = 73.45 kNm
36 - 44
Version II
PORTAL FRAMES
Job No:
Sheet 27 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Structural Steel
Design Project
Calculation Sheet
(iii)
Wi
Mp
Mp
Mp
5Mp
17.1
6m
17.1
17.1
17.1
17.1
8.55
89.7
239.9
14.6 kN
14.6 kN
/2
/2
2
2
239.9 *
17.1* 5.0 *
17.1* 2.5*
17.1*2.5
17.1* 5.0 *
14.1* 3.25 *
89.7
356.3
36 - 45
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 28 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
Equating Wi = We
5Mp = 356.3 *
Mp = 71.26 kNm
Design Plastic Moment = 94.51 kNm.
5.0 DESIGN
For the design it is assumed that the frame is adequately laterally braced so
that it fails by forming mechanism. Both the column and rafter are
analysed assuming equal plastic moment capacity. Other ratios may
be adopted to arrive at an optimum design solution.
5.1 Selection of section
Plastic Moment capacity required= 94.51 kNm
Required section modulus, Z = Mp/ fyd
94.51*10 6
250
1.1
415.84 *10 3 mm 3
36 - 46
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 29 of 30
Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
bf = 140/2 = 70 mm
T1 = 12.4 mm
t = 7.5 mm
bf
T1
70
12.4
5.65 9.4
300
7.5
40
Web
d1
t
83.9 O.K.
36 - 47
Version II
PORTAL FRAMES
Structural Steel
Design Project
Calculation Sheet
Job No:
Sheet 30 of 30 Rev
Job Title: Portal Frame Analysis and Design
Worked Example: 1
Made By
Date
PU
Checked By
Date
VK
P
Py
51.3
1278
0.04 0.15
36 - 48
Version II