INSTALL
LATION CHECKL
C
LIST - Ro
ound fram
mes
For disclaimer a
and instructionss of use, see Insstallation checkp
points round fra
ames ASS20110
004401.

PROJECT/O
OBJECT

Date:

Sign
nature:

Transit nam
me
Frame type
Opening

CHECKPOINT

A
ACTIVITY

1)

Ve
erify original Ro
oxtec sleeve by marking.

2)

Check for mecha


anical damages..

3)

Check that only one


o cable/pipe passes
p
through each module.

4)

Check that there are no center cores


c
missing.

5)

Check that all bolts are tightened


d similarly.

6)

Ve
erify that the fra
ame is pushed in
n all the way to the sleeve.

7)

M
Make
sure the ca
ables go straight through the fra
ame.

8)

Ve
erify the correctt utilization of th
he entire packing
g space.

9)

M
Make
sure the fro
ont fittings are positioned.
p

10)

Check the comprression.

11)

Check that there is no visible gap between cable/pipe and mod


dules.

OK

Not OK

NOTES:
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
____________