DPR 23 11 12
DPR 23 11 12
S.No: 02
1.
Date 23.11.2012
Details of
communications
received on (E-mail,
Fax, Courier, Post, by
hand etc.,)
Additive mixing de
2.
3.
Nil.
4.
Nil.
5.
Staff (VEESONS)
:
MR.M.E.MANIKANDAN(2141)
Mr. DINESH KUMAR.S (1832)
5.2
6.
Utkal Engineers:
Boiler: Supervisor:01 IB
03; Riger-03;grinder-01Helper-03(Total=16)
7.
8.
Site status:
Vwta020 BOILER:
Work started time:08-00AMwork end time: 7-00PM
1) Initial heating and steam inlet piping erection work U/P.
2) PA branch header to spool piece welding work U/P.
3) FD header to Compartment header inlet duct welding work
U/P.
ESP;
1. Collecting electrode to carrier beam pin locking work U/P.
2. Current protection pipe erection work U/P.
VWHA052 Boiler
1. Hp dosing piping HP welding work U/P.
VWHA053 Boiler
1. Evaporator casing welding works U/P.
Prepared by (Name):
M.E.MANIKANDAN
M.E.MANIKANDAN
Signature:
Staff No : 2141
Signature:
Staff No. :2141