Requirements of Bed Material, Charcoal & Diesel - Bed Material
Requirements of Bed Material, Charcoal & Diesel - Bed Material
Bed material
B
ulk density : 1000 to 1100 Kg/M3
Ch
emical composition : Alumina 45% to 35%
: Silica 55% to 65%
F
usion temperature : 1400 Deg
C
Q
ty required for start up :
25
TO 30 MT (Approx.)
Charcoal
C
alorific value : 6000 6500 Kcal/Kg
Q
ty required for start up Diesel :
3
5
0 400 Kgs (Approx.)
Q
ty required for start up :
6
0 - 100 Ltrs (Approx.)Preparation before light up
Ch
eck t
h
e bed material & c
h
ar coal are free from moisture.
F
irst compartment to 280 MM of W
C
from DP plate for reduction of c
h
arcoal and dieselconsumption.
B
ed material to be filled and level of defluidised bed s
h
ould be 350 MM of W
C
.
F
ill t
h
e water and keep t
h
e drum level 30-35%.Irrescpective of drum level 30-35% take water intodrum t
h
roug
h
economiser initial fill up line and drain excess quantity to avoid any starvation of economiser if yet all
economiser is in emptied before lig
h
t up by any mistake.
E
nsure
CB
D and I
B
D valves are in operation by operating once.
Inspect t
h
e boiler before start and c
h
eck t
h
e following1.
E
nsure t
h
e deaerator water level as normal.