Progress Report
Progress Report
6-Jan-2010
LUP/HIP
Precinct
- 04-Nov-2011
Bulk Contract
C64
A
Project Ref
Project Manager
Private Architect (if any)
D/076/09
Project Manager
Antoney Hector
Funds Available
$23, 580,000
10.36 %
-1-
Projected Claim: 7.90%, Actual Claim: 10.36% (Refer to Annex K for Complete Detail)
-2-
E- Opting completed for both precincts @ Chai Chee & Chin Swee
Pre Condition Survey completed for both precincts @ Chai Chee Street & Chin Swee Road
Sample Units for blocks 1, 2 & 50 at Chai Chee Street completed
Sample Unit for Block 53 Chin Swee road completed
HIP Works for block 53 Chin Swee Road completed for all residential units (96 Units)
HIP works for block 2 Chai Chee Road completed.
HIP works for block 1 Chai Chee Street in progress
Works at consumer switch rooms in progress
ULT completed
Piling works for ESS completed, PDA completed
Piling Works for New Lift Shafts at Block 2 Chai Chee Street in Progress (60% Completed)
-3-
As At
31-Dec09
Total
Stor
ey
Roo
m
Type
With
SAI
?
(Y/N)
Sho
ps
at 1st
Stor
ey
(Y/N)
Total
Unit
s
Total Lifts
New
Existi
ng /
Disus
e
Last
Mon
th
Rep
ort
Mon
th
Space-Adding-Item Works
Piling + Sub/Super
Structural Works
Last
Month
Repor
t
Month
Date
Complet
ed
Block Works
Last
Month
Repor
t
Month
Date
Complet
ed
Rep
ort
Mon
th
S-Curve
15/1
1
5/4
102
1/1
0.9
12/6
5/4/
3
86
0/2
1.63
100
50
12
5/4/
3
263
2/2
51
14
5/4
130
1/1
52
14
5/4
104
1/1
53
14
5/4
104
1/1
54
16
4/3
254
1/2
Blk 53
Chin
Swee
Road
26
96
1/0
84.2
1
84.2
1
Other Works
Type Of Building /
Works
CSRs (All Blocks)
ESS
Others
OVERALL
CUMMULATIVE
WORK COMPLETED
(%)
Last
Month
Report
Month
Date
Complet
ed
50%
15%
80%
20%
Attachments
Annex A
Annex B
Annex C
Annex D -
Annex E
Annex F
Annex G -
Annex H -
Detailed 2-Month Projection Works Programme (to show ALL critical activities with proper links)
Annex I
Annex J
- Site Organization Chart (to include revised Chart of Consultants and/or Contractor, if any)
- E Opting Result
Annex K -
Annex A
Description
Commen
ce
Date
Original
Completi
on
Date
(OCD)
No Yes
31-Dec09
Extension of Time
Granted
To-date
(Workday)
As At
Claim For
The
Month
(Workday)
Approved
Extended
Completi
on Date
(ECD)
Probable
Actual or
(Actual)
Completi
on Date
Estimat
ed
EIW
To-date
(Workda
y)
Probabl
e
Delay
(Months
)
Estimat
ed LD
($)
HDB
HandOver
Inspectio
n Date
TC 1st
HandOver
Inspectio
n Date
TC 2nd
HandOver
Inspectio
n Date
Date
Costing
Form
Issued
Date
FORM
C38
Issued
1
2
Electrical
Substation
All Switch Room
including all
electrical works
All works in common
areas within Block
outside Units (Blk 1)
A for
All works inside
Units
Units for all Units in
in Blk
Block 1
1
All works in common
4
areas within Block
outside Units (Blk 2)
A for
All works inside
units
Units for all Units in
in Blk
Block 2
2
5
All works in common
areas within Block
outside Units (Blk
50)
29-062009
26-052009
28-042010
25-032010
NIL
NIL
05-102009
18-072011
NIL
22-062009
04-042011
NIL
07-122009
20-012011
NIL
22-062009
04-082010
NIL
09-112009
08-082011
NIL
A&B
for All works inside
Units Units for all Units in
in Blk Block 50
50
All works in
common areas
6
within Block outside
Units (Blk 51)
A for
All works inside
Units
Units for all Units in
in Blk
Block 51
51
All works in common
areas within Block
7
outside Units (Blk
52)
A for
All works inside
Units
Units for all Units in
in Blk
Block 52
52
All works in common
areas within Block
8
outside Units (Blk
53)
A for
All works inside
Units
Units for all Units in
in Blk
Block 53
53
All works in common
areas within Block
9
outside Units (Blk
54)
A&B
for All works inside
Units Units for all Units in
in Blk Block 54
54
22-062009
21-032011
NIL
05-102009
04-102011
NIL
29-062009
28-062011
NIL
05-102009
04-102011
NIL
29-062009
28-062011
NIL
05-102009
04-102011
NIL
29-062009
28-062011
NIL
02-112009
15-102011
NIL
22-062009
04-062011
NIL
10
CHIN SWEE
Electrical Substation
1
beside Block 52
Switch Room
2
including all
electrical works
All works in common
areas within Block
3
outside Units (Blk
53)
A&B
for All Works inside
Units units for all Units in
in Blk Block 53
53
05-102009
04-112011
NIL
26-052009
25-122009
NIL
26-052009
25-122009
NIL
26-052009
25-042010
NIL
26-052009
25-042010
NIL
ECD is to be computed only for approved extension of time that has been granted.
Estimated EIW is to be computed based on the latest wet days published by the Meteorological Service.
Pending review by Surbana
Annex B
As At
Block
(RRental)
Total
Units
No Yes
Last
Month
Report
Month
Last
Month
Report
Month
(Delete where applicable. If Yes, please state clearly the amount of LD retention below.)
Total No
Of Units NOT
Upgraded
Blk 1
102
39
NIL
Blk 2
Blk 50
Blk 51
Blk 52
Blk 53
Blk 54
Blk 53 Chin
Swee
86
264
130
104
104
255
1
NIL
NIL
NIL
NIL
NIL
85
3
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
18
NIL
NIL
NIL
NIL
NIL
96
94
94
15
12
RVO
N/A
AO
N/A
Date
Internal
Works
Completed In
Last Unit
Date
FORM C38U
Issued
Estimated LD
($)
31-Dec09
AO #
VO
N/A
As At
Document Submission
Date
To HDB / TM(Arch)
S/N
Description Of Work
1st
Submission
2nd
Submission
Date Of
HDB /
TM(Arch)s
Clearance
On
Submission
Date
Full-Scale
Work
Commence
d
2
Inspection
nd
31-Dec09
Current
Status
Of Work
(%)
01
02
03
04
Annex D
S/N
Description Of Work
01
02
03
04
Waterproofing works
05
06
07
Document
Submission
Date
To Surbana
PM
Document
Submission Date
To HDB / TM(Arch)
Date Of Joint
Inspection
On
1st Sample
Work
Date
Full-Scale
Work
Commence
d
22-10-2009
15-09-2009
2-11-2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
22-10-2009
15-09-2009
2-11-2009
08
30/07/2009
22-10-2009
15-09-2009
2-11-2009
09
30/07/2009
22-10-2009
15-09-2009
2-11-2009
10
Electrical Works
30/07/2009
22-10-2009
15-09-2009
2-11-2009
11
30/07/2009
22-10-2009
15-09-2009
2-11-2009
12
30/07/2009
22-10-2009
15-09-2009
2-11-2009
13
Painting Works
30/07/2009
22-10-2009
15-09-2009
2-11-2009
14
30/07/2009
22-10-2009
15-09-2009
2-11-2009
15
30/07/2009
22-10-2009
15-09-2009
2-11-2009
30/07/2009
30/07/2009
ATTACHMENTS
Annex
Description Of Attachment
As At
Insert
Document Object File
Remarks
Current
Status
Of Work
(%)
31-Dec-09
Lift_Progress_Schedule Rev-30-12-2009.xls
Progress Photos.pptx
E-Opting Results
E-Opting result.pdf
Other Attachments