Technical Memoir
Arhitecture

1.Location characteristics
The building is located at the extremity of the city Timisoara.The terrain
surface has 4800 m2. having rectangular form with the following
dimensions 120m x80 m.On current terrain there is no construction
present and surface is relatively plane.
Purpose
Terrain dimensions
Height
Construction height
Constion surface
Entire surface
Suprafaa utila
Cateoria de importan
Clasa de importan
P.O.T.
C.U.T.

SPA Center
80 x 60 m
D+P+1E
14m
861 m2
2583 m2
1085 mp

18%
0,73%

The level 0.00 is considered at the finishing surface of the groundlevel.


2.Arhitectural design

Student:Lucaciu Sorin Andrei

Page 1

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

The building will have on transversal direction 4 spans , each of 6 m.On


longitudinal direction the building will have 8 span of 5 m each.The
closing walls are made of masonry having the thickness 30 cm.
The access in the building is done by foot while the access to the floor
and to the underground level is done by a reinforced concrete stair.
The interior compartment walls are made out of masonry with the
thickness 12.5cm.
The building is designed with a parking lot having 50 parking space.
The underground level is occupied mostly by the swimming pool.The
swimming pool has a surface of 135 m2 and a maximum depth of 2m.
At the ground level a fitness gym and a coffe shop will occupy most of
the space.
At the first floor, a number of 7 treatment rooms including massage
room ,aroma therapy room are designed.Also a restaurant will be
designed in west part of the building .
Utilities
The building will be connected to the local distribution network for
current.The water will pe provided from the city water supply nework.
The use of the electri network will be done accordingly to the norms
specified in 19/88.
Also the building must be provided with a lightning rod.
Finishings
Student:Lucaciu Sorin Andrei

Page 2

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

For the exterior side of the building the color of the painting used is
mostly dark yellow.The woodwork used for the doors and windows has
the color brown.
At the interior the walls are painted in different colors.The warm floor
is made of oak wood.The cold floor is made out of sandstone tiles.
The cold floor is present mainly at the underground level ,where the
swimming pool is located.
The roof structural system is realized by wood framing.The height of
roof is 4 m.

Student:Lucaciu Sorin Andrei

Page 3

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Technical Structural Memoir


1.General data
Objective description

SPA Center

Location

Timisoara

The construction has a rectangular shape with the following dimensions


L=40m
l=24m
In transversal direction it has 4 spans,each of 6m,while in the
longitudinal direction it has 8 spans of 5m each.
The height of the building is 14 m having D+P+1E.
2.Description of the construction
The structure is located in Timisoara.From seismic point of view
Timisoara has,according to P.100-1/2006,the following characteristics
ag=0.20g
Tc=0.7 s
The foundation depth of the building Df=-3m.The solution for the
foundations is isolated foundations under the columns,linked together
with coupling beams.
Student:Lucaciu Sorin Andrei

Page 4

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

3.Structural system
The structural system of the building is made out of reinforced concrete
frames.Columns,transversal and longitudinal girder.
The columns have a square section of 60x60 cm.The transversal girders
have a rectangular section of 30x60cm while the longitudinal girders
have a rectangular section of 25x50cm.
The exterior walls are non-structural and are mode out of masonry with
the thickness of 30cm
Then interior walls are also made of masonry with the thickness of
12.5cm
The horizontal structural system is made out of girders on both
directions and reinforced concrete slabs.
The first reinforced concrete slab is at the height +3.50m.The thickness
of the slab is 20 cm with reinforcement on both directions.
The second reinforced concrete slab is located at the height +7.00m
with the thickness of 20 cm and reinforced on both directions.
The third reinforced concrete slab is at the height +10.5m .
The concrete used for the upper part of the structure is C25/30 while
the concrete used at the foundations is C20/25.

Student:Lucaciu Sorin Andrei

Page 5

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

The roof system is made of wood framing.Distance between the wood


frames is 2.5 m.The wood used is softwood havin the resistance class
C40.The roof angle is 18 degrees.
The wood framing consists of the following elements:
Posts disposed at 3m on transversal direction and on 2.5 m on
longitudinal direction.The section of the posts is 15X15cm.
Purlins placed over the posts with the section 15X15cm.The purlins
have the length of 2.5m.
Rafters with the section of 13X15cm dispsed at 80 cm.=>the distance
between the rafters is 80 cm.
The roof covering is made out of bituminous chip wood.This solution of
bituminous chip wood was chosen because of the small weight of the
covering.
The covering is supported by the wood deck which is 2.5X20cm.
During the work execution the safety rules will be applied and
respected according to the norms in use.

Intocmit
Lucaciu Sorin Andrei

Student:Lucaciu Sorin Andrei

Page 6

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Predimensioning of the elements

 Pre-dimensioning of the slab


B 600
=
= 1.2 < 2
lp 500

Slab reinforced on two direction


P/180+20mm=(500+600)*2/180+20mm=14.22=>hp,min=15cm
 Pre-dimensioning of the transversal girder
hopt=L/10=600/10=60 cm
b=h/2=60/2=30 cm
=>>Transversal girder
h=60 Cm
b=30 cm
 Pre-dimensiong the longitudinal girder
hopt=L/10=500/10=50 cm
b=h/2=50/2=25 cm
=>>Longitudinal girder
h=50 cm
b=25 cm
 Pre-dimensioning of the columnsThe initial section of the column was
chosen as 40x40 cm

Student:Lucaciu Sorin Andrei

Page 7

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.1Load Evaluation
1.Permanent loads
Dead weight of the slab
Superior finishing : a) Parquet floor (warm floor)
Parquet Floor

No.

Material Name

1.

Parquet

2.

Sound Insulation

3.

Specific
weight[kg/m3]

Thickness
[m]

Own
weight[daN/m2]

420

0.022

9.24

80

0.003

0.24

Support Casing

1200

0.025

30

4.

Reinforced Concrete
Slab

2500

0.20

500

5.

Plaster

1600

0.02

32

TOTAL

Student:Lucaciu Sorin Andrei

571daN/m2

Page 8

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

b) Sandstone Tiles floor(cold floor)


Sandstone Tiles Floor
Specific
weight[kg/m3]

Thickness
[m]

Own
weight[daN/m2]

No.

Material Name

1.

Sandstone Tiles

2400

0.008

19.2

2.

Mortar

2100

0.005

10.5

3.

Compensatory
Coping

1200

0.037

44.4

4.

Reinforced Concrete
Slab

2500

0.15

500

5.

Plaster

1600

0.02

32

TOTAL

606daN/cm2

Compartment walls
bwall=12.5cm
material:ceramic block
=12kN/m3
gk,cw=0.125*12=3kN/m2
Inferior finishing
false ceiling gypsum board: t=20 mm
gb=11.5 kN/m3
Student:Lucaciu Sorin Andrei

Page 9

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

gkif=0.02*11.5=0.23 kN/m2
Closing walls:
ceramic blocks b=300mm
b=12 kN/m3
glass are:70%
h=3.5m-0.6=2.9m
=> gkcw=0.3*12*2.9*0.3=3.13 kN/m
2.Variable loads
Live load:
=> C4 category => National Annex :
qk=5kN/m2
Snow load
s=is*i*Ce*Ct*sk
-Location: Timisoara=> sk=1.5 kN/m2
-Importance class II=> is=1.10
-complete exposure => Ce=0.8
-Ct=1.00
=0.8
=> sk=1.10*0.8*0.8*1*1.5=1.05kN/m2
Wind load

Student:Lucaciu Sorin Andrei

Page 10

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

We= iw*Cpe*qp(Ze)
iw=1.15 importance class II
Cpe= ?
h=10.5 m
b=24m
=>h<b
qp(Z)=qp(Ze)
e=min(b;2h)
b=40m
2h=2*10.5m=29m
=>d=24m
e=29m
e<d =>
h/d=14/24=0.58
Zone A
Area in zone A=e/5*h=81 m2
Area in zone B: B=(d-e/5)*h=255m2
D=E=40*14= 560 m2
=> CpeA=Cpe10=-1.2
CpeB=Cpe10=-0.8
CpeD=Cpe10=+0.7
Student:Lucaciu Sorin Andrei

Page 11

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

by linear interpolation it is found CpeE=0.31


qp(Ze)=?
Ze=h=14m
qp(Z)=Cpq(Z)*qm(Z)
Cpq(Z)=1+2g*Iv(Z)=1+7*Iv(Z)
Category of land:III=> Z0=0.3m; Zmin=5m

Iv( z ) =
2.5ln

Z min
Z0

2.35
= 0.27
14
2.5ln
0.3

=>Cpq(Z)=1+7*0.27=2.89
qm(Z)= C02*Cr2(Z)*qb
Cr2(Z)=Kr2(Z0)* [ln(

Z min 2
)]
zo

Kr2(Z0)=0.046
=> Cr2(Z)=0.53
=>qm(Z)=0.54*0.6=0.318
=>qp(Z)=2.89*0.318=0.91
We= iw*Cpe*qp(Ze)
=>
WeA=1.14*(-1.2)*0.91=--1.25 kN/m2
WeB=1.15*(-0.8)*0.91=-0.83kN/m2
WeD=1,15*(+0.7)*0.91=+0.0.73 kN/m2
WeE=1.15*(-0.31)*0.91=-0.32 kN/m2
Student:Lucaciu Sorin Andrei

Page 12

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Wind on roof

h=14m
b=40m
=>>e=2h
Area in zone F
e/4*e/10=10.15 m2
Cpe,F=Cpe,10=-1.3
Area in zone G
(b-2e/4)*e/10=28 m2
Cpe,G=Cpe,10=-1.3
Area in zone H
(e/2-e/10)*b=209 m2
CpeH=Cpe10=-0.6
Area in zone I
b*e/2=348 m2
Student:Lucaciu Sorin Andrei

Page 13

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

CpeI=Cpe10=-.5

qp(Z)=Cpq(Z)*qm(Z)
Cpq(Z)=1+2g*Iv(Z)=1+7*Iv(Z)
Category of land:III=> Z0=0.3m; Zmin=5m

Iv( z ) =
2.5ln

Z min
Z0

2.35
= 0.27
14
2.5ln
0.3

=>Cpq(Z)=1+7*0.27=2.76
qm(Z)= C02*Cr2(Z)*qb
Cr2(Z)=Kr2(Z0)* [ln(

Z min 2
)]
zo

Kr2(Z0)=0.046
=> Cr2(Z)=0.63
=>qm(Z)=0.63*0.6=0.38
We= iw*Cpe*qp(Ze)
=> WeF=1.15*(-1.3)*0.38=-0.56kN/m2
WeG=1.15*(-1.3)*0.38=-0.56kN/m2
WeH=1.15*(-0.6)*0.38=-0.26kN/m2
WeI=1.15*(-0.21)*0.38=-0.21kN/m2

Student:Lucaciu Sorin Andrei

Page 14

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Seismic load
Location:Timisoara
ag=0.20g

Tc=0.7s
Checks :
Lateral displacement verification ( P100-2013 Annex E)
drSLS<draSLS
draSLS=0.005h=0.005*3500=17.5mm
drULS<draU:S
draU:S=0.025h=0.025*3500=87.5mm
Student:Lucaciu Sorin Andrei

Page 15

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

The normalized axial force in DCH <0.4


=> d =

N
1690*1000
=
= 0.28 < 0.4 ok
b * h * fcd 60*60 *16.67

< 0.1 on every floor so the second order effects can be neglected

Thermal-Hygro-Energetical Memoir

The calculus for the thermal resistance fot the designed house was made with
respect to the code Normativ C 107-1 (Normativ privind calculul coeficienilor
globali de izolare termic la cldirile de locuit ).
This calculus was made for an exterior wall, the slab above ground and the
terrace; using the Therwoline program.
The thermal resistance was determined taking into account that these
elements are composed of layers of homogenous materials, placed on the direction
of the heat flux. In order to determine this thermal resistance the formula was
applied:

n
R = R + R + Re
i
j
j =1

m2K

where:

n
j
Rj =

j=1
j

resistance to thermal diusion of the homogenous layers,

having the thickness J , and thermal conductivity J.


Student:Lucaciu Sorin Andrei

Page 16

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

1
R =
resistance to heat transfer at the inner surface
i
i
1
Re =
resistance to heat transfer at the exterior surface

e
J = thermal conductivity
i ; e = heat transfer coefficients form the surface

This resistance is compared to the necessary resistance, and the condition


must be fulfilled : R > Rnec.

Regarding the condensation calculation, the appearance on the inner face of


the element was checked and it was found that the element does not suffer such
an effect. By this check the condition that states that water that accumulates in
the building elements during the cold season is evaporated in the warm period of
the year.
The condensation check was made for an inside temperature of 20oC and a
humidity of 60%, respectively -15 oC and 80% humidity outside.

Student:Lucaciu Sorin Andrei

Page 17

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.2Thermal-Hygro-Energetical Calculus
Exterior Wall

Student:Lucaciu Sorin Andrei

Page 18

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 19

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 20

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

k=0.255 1/k=3.92

=>

1/k>Rmin=1.20

Ground Slab

Student:Lucaciu Sorin Andrei

Page 21

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 22

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

k=0.23 1/k=4.34

=>

1/k>Rmin=4.20(slabs at the inferior side of the basemen

Slab below attic

Student:Lucaciu Sorin Andrei

Page 23

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 24

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 25

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 26

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.3Design of the roof framing


Desing of the roof elements

The roof framing is made of softwood having the resistance class C40.
The characteristics of the resistance class C40 are the following:
resistance in bending:

f m, k = 40 N / mm 2

resistance in shear:

f v, k = 3,8n / mm2

modulus of elasticity: E0,mean = 14kn / mm2

Computation of the wood deck


The wood deck is made of softwood having the following dimensions:
h=2,5cm
b=20cm
l=80cm

Student:Lucaciu Sorin Andrei

Page 27

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

1.Computation of the loads


-own weight of the covering material of the roof(chip wood)
gk,I=8.3 dan/m2
-own weight of the chip wood
0.025* lemn = 0.025* 600 = 150 daN / m

-Concentrated load of 100 daN


Load on 1 chip wood:
load from the covering material
8.3 daN/m2*0.2m=1.66 daN/m
Load from the own weight:
15daN/m2 *0.2m=3daN/m
Total=1.66daN/m+3daN/m=4.66daN/m
Load from snow
The building is located in Timisoara.The snow load is 105daN/m2
Sk=105dan/m2
Snow load acting on 1 chip wood:
Sk=Sk*0.2m=105daN/m2*0.2m=21daN/m
Partial safety factors:
For permanent loads:1.35

For live loads:1.5


Student:Lucaciu Sorin Andrei

Page 28

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

For concentrated loads :1.2


=>Calculation loads from permanent loads:
gd=1.35*4.66=6.29 daN/m
Calculation loads for live loads
Sd=1.5*21=31.5 dan/m
Calculation loads for concentrated forces
1.2*100 daN=1200daN
Load combination
Combination 1
Permanent +Snow

Combination 2 Permanent +concentrated

Student:Lucaciu Sorin Andrei

Page 29

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Combination 1
(gd+sd)*cos=(4.66daN/m+31.5daN/m)*cos18=34.71daN/m
(gd+sd)*sin==(4.66daN/m+31.5daN/m)*sin18=9.76daN/m
My =

ql
9.76 *0.82
=
= 0.78daN / m
8
8

Combination 2
pd*cos=120*cos18=114.1daN
gd*cos=4.66*cos18=4.43daN/m
pd*sin=120*sin18=47.1daN
gd*sin=4.66*cos18=1.44daN
Mz =

ql 2 p * l 1.44 *0.82 37.1*0.8


+
=
+
= 7.67 daNm
8
4
8
4

ql 2 p * l 4.43*0.82 114.1*0.8
Mz =
+
=
+
= 23.17 daNm
8
4
8
4

Resistance checking
Mz My
+
Rd
Wy Wz

R = k mod*
d

Rk

Student:Lucaciu Sorin Andrei

Page 30

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Combination 1
kmod=0.6 for permanent loads
kmod=0.9 for shor duration loads
R d = 0.6*

400daN / cm2
= 184daN / cm 2
1.3

Combination 2
kmod =

g d *0.8 + pd *0.9
= 0.9
g d * o.8 + pd

R d = 0.9* 400dan / cm2


R d = 276daN / cm2
Mz My
+
Rd
Wy Wz
20* 2.5
= 20.83cm3
6
2.5* 202
= 166.66cm3
Wz =
6
Mz My
767
2317
+
=
+
= 116daN / cm 2
Wz Wy 166.66 20.83
Wy =

116daN / cm 2 < R d = 184daN / cm 2

Student:Lucaciu Sorin Andrei

Page 31

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Tangential efforts
q * l 34.71*0.8
=
= 13.88daN
2
2
q * l 4.43*0.8 + 114.1
= Ty =
=
= 58.82daN
2
2

Tmax = Ty =
Tmax

3 Tmax
fv ,d
2 A
kmod * ksys * f v , k 0.9 *1.0 *3.8
f v ,d =
=
= 26.3daN / cm 2
m
1.3
f v ,k = 3.8 N / mm 2
kmod = 0.9
ksys = 1.0

m = 1.3

Combination 2
3 Tmax
f v .d
2 A
3 58.82
*
= 1.76dan / cm 2
2 50

for Combination 2
f v.d =

kmod * ksys * f v.k

0.6*1.0 *3.8
= 17.5dan / cm 2
1.3

kmod = 0.6
k sys = 1.0
f v ,k = 3.8 N / mm 2

m = 1.3

Student:Lucaciu Sorin Andrei

Page 32

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

3 Tmax
f v.d
2 A
3 13.88
*
= 0.41dan / cm 2
2 50
0.41daN / cm 2 17.5daN / cm 2

Deflection check
It is done with the characteristic values
f max, final = f1 + f 2 + f3 + fi fc f a

f1 -permanent loading

kdef=0.5 for permanent loading


kdef=0.25 for short term loading
f1= f1,inst (1 + kdef )

f2=due to temporary loadings

f 2 = f 2,inst (1 + kdef )
f i = 1.5mm
fc = 0
f = f ,inst (1 + kdef )

gk=4.66daN/m

Student:Lucaciu Sorin Andrei

Page 33

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Pk=100daN/2=50daN
g kz = 4.66*sin18 = 1.44daN / m
g ky = 4.66*cos18 = 4.43daN / m
pz = 50daN *sin18 = 13.94daN
p y = 50daN cos18 = 48daN
2.53 * 20
= 26.04cm 4
12
2.5* 203
Iz =
= 166.66cm 4
12
Iy =

f1 =

f y2 + f z2 (1 + k def )

4
5 qky * l
5 qkz * l 4
f1 = 1.5* (
*
)+(
*
) = 0.01cm
384 EI z
384 EI z

f1 = 1.25* (

4
5 py * l
5 pz * l 4
*
)+(
*
) = 0.15cm
384 EI z
384 EI z

f1=0.01cm
f2=0.15cm
fi=0,15cm
fc=0
f adm =

l
80
=
= 0.53cm
150 50

f max, final = 0.01 + 0.15 + 0.15 = 0.31cm


f max, final f adm

Student:Lucaciu Sorin Andrei

Page 34

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Computation of Rafters
distance between rafters is 80cm
bc=13cm
hc=15cm
Load Evaluation
Own weight of the rafters,covering,chip wood
g kc = bc * hc * wood = 0.15*0.15*600 = 12daN / m
g * lc = 8.3daN / m 2 *0.80 = 6.7daN / m
g d = 1.35*(12 + 6.7) = 24.75daN / m

Snow load
Sk=105daN/m2
Sd=1.5*105daN/m2
Tributary area=0.8m
Load on 1 rafter
g d *cos = 24.75*cos18 = 23.53daN / m

Linear load from snow


Sd = 127.5*0.80 = 130.7daN / m
Sd *cos = 130.7 * cos18 = 124.3daN / m
Total = 124 + 23.53 = 147.53dan / m

Mz My
+
Rd
Wy Wz

Student:Lucaciu Sorin Andrei

Page 35

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Shear check
q * l 34.71*0.8
=
= 13.88daN
2
2
q * l 4.43*0.8 + 114.1
= Ty =
=
= 58.82daN
2
2

Tmax = Ty =
Tmax

3 Tmax
f v ,d
2 A
kmod * k sys * f v ,k 0.6 *1.0*3.8
f v ,d =
=
= 17.5daN / cm 2
m
1.3
f v ,k = 3.8 N / mm 2
kmod = 0.6
k sys = 1.0

m = 1.3
Tmax =

147.83*3
= 221.7 daN
2

3 Tmax
= 17053daN / m
2 A
17053 < 17500dan / cm 2

Deflection check
fi=1.5mm
fc=0
b * h3 12*153
Iz =
=
= 3375cm 4
12
12

Student:Lucaciu Sorin Andrei

Page 36

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

5 qk * l 4
f1 = 1.5* (
*
) = 0.7 mm
384 EI z
kdef = 0.5
1 + kdef = 1.5

f1=1.5* (

5
0.23*34
*
) = 0.7 mm
384 9.4*106* *3375*108

f 2 = 1.25* (

5 sk * l 4
*
)
384 EI z

kdef = 0.25
1 + kdef = 1.25

f 2 = 1.25* (

5
0.99*34
*
) = 4mm
384 9.4*106 *3375*108

l
= 15mm
200
= f1 + f 2 = 5.05mm

f adm =
f final

5.05mm > 15mm( f adm )

Student:Lucaciu Sorin Andrei

Page 37

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Computation of the purlins


Section 12x15cm
Permanent loads
-own weight
g k = 0.12*.15*600 = 10.8daN / m
d

g = 10.8daN / m *1.35 = 14.6daN / m

-weight of the covering and of the chip wood


8.3dan / m 2 + 0.15*600 *3m = 294daN / m

Total permanent load=308daN/m


g d = 1.35*308 = 415.8daN / m

Load from snow


Sk * dp = 105*3m = 315daN / m
S d = 1.5*315 = 472.5daN / m
Pz = (q d + s d ) *cos = 826.8daN / m
Py = ( g d + s d ) *sin = 268.65daN / m

Combination 1
Permanent +Snow

Student:Lucaciu Sorin Andrei

Page 38

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

( g d + s d ) * cos l 2
= 299daN / m
8
( g d + s d ) *sin l 2
Mz =
= 97 daN / m
8
My =

Check of shear resistance


q * l 826.8*3m
=
= 5.15daN / cm 2
2
2
A = 0.12*0.15 = 180cm 2
3 Tmax
f v ,d
2 A
k *k * f
0.6*1.0*3.8
= 17.5daN / cm2
f v ,d = mod sys v ,k =
m
1.3

Tmax = Ty =

f v ,k = 3.8 N / mm 2
kmod = 0.6
k sys = 1.0

m = 1.3
5.16daN / cm2 < 17.5daN / cm 2

Check of deflections
fi=15mm
fc=0
b * h3 12*153
Iz =
=
= 3375cm 4
12
12

f1 = 1.5* (

5 qk * l 4
*
) = 7.2mm
384 EI z

Student:Lucaciu Sorin Andrei

Page 39

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

5 sk * l 4
f 2 = 1.25* (
*
) = 6.25mm
384 EI z
l
= 12.5
200
= f1 + f 2 = 13.45mm

f adm =
f final

13.45mm > 12.5mm( f adm )

Choose section 15x15 cm


I=4218cm4
f1 = 5.7 mm
f 2 = 5mm
f total = 5.7 mm + 5mm = 10.7 mm
f total < f adm = 12.5mm

Computation of the posts

Post section 15X15 cm


Load evaluation
Permanent loads
-own weight
Gpost=b*h**h
Gpop=0.15*0.15*600*3.9=52.65daN
-weight of the roof covering
gk,i*dp1*dp2=8.3*2.5*3=62.25daN
Student:Lucaciu Sorin Andrei

Page 40

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

-weight of the strips


gk,s*dp1*dp2=0.15*2.5*3=1.125daN
-weight of the rafters
bc*hc**dp2=0.13*0.15*600*3=35daN
-weight of the purlin
bp*hp**dp1=0.15*0.15*600*2.5=27daN

Total load on the postn from permanent loads


Ggk=178.12daN

Snow load
Sk*dp1*dp2=1.05*3*2.5=787daN
Gsk=787daN

Total load on the post(Q)


Q=1.35Ggk+1.5Gsk
Q=2405daN=36kN

Student:Lucaciu Sorin Andrei

Page 41

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

ef

m in

* Ac

Rd

N = Q

= 184daN / cm

Ac = b * h = 225cm

Rd

b = 15cm
h = 15cm

m ax =

i m in

I m in
A
h * b3
I m in =
= 4219cm 4
12
4219
i m in =
= 4 .3 3 c m
225
l f = H post = 3 .9 m
i m in =

m ax =

i m in

post

0 .2 9 b

ad

ad = 1 5 0
m ax =

390
= 8 9 .6 5
4 .3 5

m ax > 7 5 = >

m in

3100

2
m ax

= 0 .3 6

ef

ef

ef

m in

* Ac

Rd

3600
= 4 4 .2 5 d a N / c m
0 .3 6 * 2 2 5
< Rd = 1 8 4 d a N / cm 2
=

Student:Lucaciu Sorin Andrei

Page 42

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Computation of the wood base


Consider the section 20x15x50cm
N<Q
N=36kN
Q = R d * Ac * mtc * m
R d = mui * mdi * R /
mui = 0.9
mdi = 0.8

= 1.3
R d = 34.8daN / cm 2
Q = 34.8* 225*1.6*1.0
Q = 12528daN = 125.28kN
N = 36kN
Q>N

Student:Lucaciu Sorin Andrei

Page 43

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 44

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.4Design of the reinforced concrete stair


1.Pre-dimensioning
hpl=15cm
hgr,p=30cm
bgr,p=30cm
2.Load evaluation
Permanent loads
a)Ramp
gr,k=hr*c=0.15*25=3.75kN/m2
gr,d=1.35*gr,k=1.35*3.75=5.06kN/m2
b)Stairs
gst,k=htr/2*concrete=0.18/2*25=2.25kn/m2
gst,d=1.35*gst,k=1.35*2.25=3.03kN/m2
Finishings
gf,k=1 kN/m2
gf,d=1.35*1=1.35kN/m2
Total permanent loads=9.44kN/m2
Variable loads
Student:Lucaciu Sorin Andrei

Page 45

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

qk=5 kN/m2
qd=1.5*qk=1.5*5=7.5kN/m2
Cnom=Cmin+Cdev
Cmin=max(Cmin,b ;Cmin,dur ;10mm)
Exposure Class XC1
Structural Class S3(class reduction by 1-member slab geometry)
Cmin,dur=10mm

Cmin,b=max
max=14mm
Cmin,b=14mm=>>Cmin=14mm
Cdev=10mm
Cnom=25mm
d=h-ds
ds=Cnom+/2=32mm
d=150=32=118
fyd=300N/mm2 (S345)
M ED = 7.52kNm
M Ed
7.62*106
= 0.02
= 2 =
bd f cd 1500*1182 *16.67

= 1 1 2 = 0.021
As = bd

Solution 8/15 As=3.35cm2

f cd
= 2.13cm2
f yd

Student:Lucaciu Sorin Andrei

Page 46

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

M ED = 13.65kNm
M Ed
13.65*106
= 0.03
= 2 =
bd f cd 1500*1182 *16.67

= 1 1 2 = 0.031
As = bd

f cd
= 3.15cm 2
f yd

Solution 8/15 As=3.35cm2


Ramp 2
M ED = 13.73kNm

M Ed
13.73*106
=
= 0.03
bd 2 f cd 1500*1182 *16.67

= 1 1 2 = 0.031
As = bd

f cd
= 3.15cm 2
f yd

Solution 8/15 As=3.35cm2


M ED = 6.6kNm

M Ed
6.6*106
=
= 0.017
bd 2 f cd 1500*1182 *16.67

= 1 1 2 = 0.018
As = bd

f cd
= 1.83cm 2
f yd

Solution 6/15 As=1.89cm2

Student:Lucaciu Sorin Andrei

Page 47

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

M ED = 7.39kNm
M Ed
6.6*106
= 0.019
= 2 =
bd f cd 1500*1182 *16.67

= 1 1 2 = 0.020
As = bd

f cd
= 2.03cm 2
f yd

Solution 8/15 As=3.35cm2

Student:Lucaciu Sorin Andrei

Page 48

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.5Slab design
Computation of the concrete covering layer:
Cnom=Cmin+Cdev
Cmin=max(Cmin,b;Cmin,dur;10mm)
max=14mm
Cdev=10mm
Cmin,dur=10mm (S3 class)
=> Cnom=14+10=25mm
ds=Cnom+/2=25+8=31 mm
d=h-ds=200-31=169mm

Constructive rules :
for the reistance reinforcement: smax=min{3*hpl;200mm}=min{600mm,200mm}
=> 200mm
for the repartition reinforcement : smax=min{3.5*hpl; 300mm}=min{700mm;
300mm}=300mm
the minimum for the slab is 6 mm

Student:Lucaciu Sorin Andrei

Page 49

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

the maximum is:

hp
+ 2mm = 22mm
10

fctm
*b * h
fyk
As, min 0.0013* b * d
As, min = 0.26

dx = hp Cnom

= 200 25 6 = 169mm

dy = hp Cnom

= 200 25 10 6 = 159mm

f ctm = 2.6 N / mm 2
fyk = 345 N / mm 2
b = 1000mm
2.6
*1000*169 = 3.31cm 2
345
2.6
*1000*59 = 3.11cm 2
As, min y = 0.26*
345
As, min 0.0013* b * d = 0.0013*1000*159 = 2.06cm 2
As, min x = 0.26*

As, max 0.04* b * hp = 0.04*1000* 2000 = 80cm 2

Reinforcing of the slab :


The calculus for the necessary reinforcement area was computed with AxisVM,
finite element method calculus program :The following steps were executed :

the thickness of the slab and concrete class were introduced


the support conditions were set
the loads were distributed on the slab surface
the surface was meshed
the load combinations were defined
a static analysis was made
the parameters for the reinforced concrete design were introduced
a solution for the necessary reinforcement area was chosen

The slab is reinforced on 2 directions: the global X&Y directions from AxisVM

Student:Lucaciu Sorin Andrei

Page 50

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 51

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.6Reinforcing the transversal girder

Cnom=Cmin+Cdev
Cmin=max(Cmin,b ;Cmin,dur ;10mm)
Exposure Class XC1
Structural Class S3(class reduction by 1-member slab geometry)
Cmin,dur=10mm
Cmin,b=max PC52 max=25mm
Cmin=max(25;20;10)
Cmin=25mm
Cdev=10mm
Cnom=25+10=35mm
Cnom=35mm
ds=Cnom+max/2
ds=50 mm
dss=dsi=50mm
d=h-ds
d=600-50=550mm

Student:Lucaciu Sorin Andrei

Page 52

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 1
Asi , nec =
Asi , nec =

M ED ,inf

Asi ,min =

fyd (d d ss )
144.6*106
300*(550 50)

Asi ,min =

0.5M ED ,sup
fyd (d d ss )
0.5* 200.82*106
300(550 50)

Asi ,min = 6.69cm 2

Asi , nec 9.64cm 2

Solution 322 As=11.40cm2

Reinforcement at the superior side


Support j
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

=> =

200.82*106 1016*300*500
= 0.03
300*550 2 *16.67

= 1.25(1 1 2 ) => = 0.038


< 25
xu = * d => xu = 21.31mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

200.82 *106
= 13.38cm 2
300 *500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 => Ass > Ass ,min
Student:Lucaciu Sorin Andrei

Page 53

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

=>Solutie 320+218 As=14.5cm2

Support K
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

244 *106 1016*300 *500


=
= 0.06
300 *5502 *16.67

= 1.25(1 1 2 ) => = 0.075


< 25
xu = * d => xu = 41.25mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
244 *106
=> Ass =
=
= 16.26cm 2
fyd * hs 300*500
M ED ,sup

xu < xmin

Ass ,min = 0.5* b * d

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 => Ass > Ass ,min

Solution 322+218 As=16.48cm2

Span 2
Asi , nec =
Asi , nec =

M ED ,inf
fyd (d d ss )
124*106
300*(550 50)

Asi , nec = 8.26cm 2


Student:Lucaciu Sorin Andrei

Asi ,min =
Asi ,min =

0.5M ED ,sup
fyd (d d ss )
0.5* 236*106
300(550 50)

Asi ,min = 7.86cm 2


Page 54

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Solutie 320 As=9.42cm2Reinforcement at the superior side

Reinforcement at the superior side


Suppor j
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

236*106 942 *300*500


= 0.06
300*550 2 *16.67

= 1.25(1 1 2 ) => = 0.076


< 25
xu = * d => xu = 41.8mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

233*106
= 15.53cm 2
300*500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 =>> Ass > Ass ,min

=>Solutie 322+218 As=16.48cm2

Student:Lucaciu Sorin Andrei

Page 55

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Support K
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

233*106 942*300*500
300*5502 *16.67
= 0.06

= 1.25(1 1 2 => = 0.076


< 25
xu = * d => xu = 41.8mm
xmin = 2 * dss => xmin = 1.882*50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

233*106
= 15.53cm 2
300*500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm2 => Ass > Ass ,min

Solution 322+218 As=16.48cm2

Span 3

Student:Lucaciu Sorin Andrei

Page 56

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Asi ,nec =
Asi ,nec =

M ED ,inf

Asi ,min =

fyd (d d ss )
122*106
300*(550 50)

Asi ,min

Asi ,nec = 8.13cm 2

0.5M ED ,sup
fyd (d d ss )

0.5* 231*106
=
300(550 50)

Asi ,min = 7.86cm 2

Solutie 320 As=9.42cm2


Reinforcement at the superior side
Support j
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

231*10 6 942 *300*500


= 0.06
300*550 2 *16.67

= 1.25(1 1 2 => = 0.076


< 25
xu = * d => xu = 41.8mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

231*106
= 15.53cm2
300*500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 => Ass > Ass ,min

Solution 322+218 As=16.48cm2

Student:Lucaciu Sorin Andrei

Page 57

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Support K
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

240*10 6 942 *300 *500


= 0.06
300*550 2 *16.67

= 1.25(1 1 2 => = 0.075


< 25
xu = * d => xu = 41.25mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin

240*106
=> Ass =
=
= 16.00cm 2
fyd * hs 300 *500

Ass ,min = 0.5* b * d

M ED ,sup
f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 => Ass > Ass ,min

Solution 322+218 As=16.48cm2

Span 4

Student:Lucaciu Sorin Andrei

Page 58

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Asi ,nec =
Asi ,nec =

M ED ,inf

Asi ,min =

fyd (d d ss )
155*106
300*(550 50)

Asi ,nec = 10.33cm 2

Asi ,min

0.5M ED ,sup
fyd (d d ss )

0.5* 263*106
=
300(550 50)

Asi ,min = 8.76cm 2

Solutie 322 As=11.40cm2


Reinforcement at the superior side
Support j
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

263*106 1140*300 *500


= 0.06
300*5502 *16.67

= 1.25(1 1 2 => = 0.075


< 25
xu = * d => xu = 41.8mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

231*106
= 17.53cm 2
300*500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm 2 => Ass > Ass ,min

Solution 322+220 As=17.7cm2

Student:Lucaciu Sorin Andrei

Page 59

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Support K
=

M ED ,sup Asi * fyd * hs


bd 2 fcd

209*106 942 *300*500


= 0.025
300*550 2 *16.67

= 1.25(1 1 2 => = 0.032


< 25
xu = * d => xu = 41.25mm
xmin = 2 * dss => xmin = 1.882 *50 = 94.1mm
xu < xmin => Ass =
Ass ,min = 0.5* b * d

M ED ,sup
fyd * hs

Solution 320+218

240 *106
= 13.93cm 2
300 *500

f ctm
f yk

f ctm = 0.3 f ck 2/3 => f ctm = 2.55


Ass ,min = 5.84cm2 => Ass > Ass ,min

As=16.48cm2

Computation of the capable bending moments


Span 1
xu =
xmin

Ass Asi
1390 1016
* fyd =
*300 = 28.04mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin

M Rd ,sup = Ass f yd (d d ss ) = 1390*300(550 50)


M Rd ,sup = 208.5kNm
M Rd ,inf = Asi f yd (d d ss ) = 1016*300(550 50)
M Rd ,inf = 152.4kNm

Student:Lucaciu Sorin Andrei

Page 60

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 2
xu =
xmin

Ass Asi
1648 1016
* fyd =
*300 = 47.39mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin

M Rd ,sup = Ass f yd (d d ss ) = 1648*300(550 50)


M Rd ,sup = 248kNm
M Rd ,inf = Asi f yd (d d ss ) = 942*300(550 50)
M Rd ,inf = 142kNm

Span 3
xu =
xmin

Ass Asi
1648 942
* fyd =
*300 = 52.93mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin

M Rd ,sup = Ass f yd (d d ss ) = 1648*300(550 50)


M Rd ,sup = 248kNm
M Rd ,inf = Asi f yd (d d ss ) = 942*300(550 50)
M Rd ,inf = 142kNm

Span 4

Student:Lucaciu Sorin Andrei

Page 61

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

xu =
xmin

Ass Asi
1770 1140
* fyd =
*300 = 47.24mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin

M Rd ,sup = Ass f yd (d d ss ) = 1770*300(550 50)


M Rd ,sup = 267 kNm
M Rd ,inf = Asi f yd (d d ss ) = 942*300(550 50)
M Rd ,inf = 171kNm

xu =
xmin

Ass Asi
1418 1140
* fyd =
*300 = 20.84mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin

M Rd ,sup = Ass f yd (d d ss ) = 1418*300(550 50)


M Rd ,sup = 213kNm

Shear force in the transversal girder

Seism =>>(from the left side)


Mdb,2=Mcapsup *RD=246 kNm *1.2=295kNm
Mdb,1=Mcapinf*RD=153kNm *1.2=184kNm
RD=1.2 (DCH)
Student:Lucaciu Sorin Andrei

Page 62

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

lc=L-bcolumn=6m-0.6m=5.4m
Vm =

M db1 + M db 2 295 + 184


=
= 89kN
lc
5.4

Vdb ,min = 164kN 89kN = 75kN


Vdb ,max = 185kN + 89kN = 274kN

Span 2
Mdb,1=Mcapinf*RD=142kNm *1.2=184kNm
Mdb,2=Mcapsup *RD=248 kNm *1.2=298kNm
Vm =

M db1 + M db 2 298 + 184


=
= 90kN
lc
5.4

Vdb ,min = 177 kN 90kN = 87 kN


Vdb ,max = 176kN + 90kN = 266kN

Span 3
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Mdb,2=Mcapsup *RD=272 kNm *1.2=327kNm
Vm =

M db1 + M db 2 327 + 171


=
= 93kN
lc
5.4

Vdb ,min = 176kN 93kN = 83kN


Vdb ,max = 176kN + 93kN = 269kN

Span 4
Mdb,1=Mcapinf*RD=171kNm *1.2=206kNm
Student:Lucaciu Sorin Andrei

Page 63

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Mdb,2=Mcapsup *RD=213 kNm *1.2=256kNm

Vm =

M db1 + M db 2 256 + 206


=
= 86kN
lc
5.4

Vdb ,min = 185kN 86kN = 99kN


Vdb ,max = 163kN + 86kN = 249kN

<<= Seism from the right side


Span 1
Mdb,1=Mcapinf*RD=153kNm *1.2=183kNm
Mdb,2=Mcapsup *RD=213 kNm *1.2=253kNm
Vm =

M db1 + M db 2 251 + 183


=
= 97 kN
lc
5.4

Vdb ,min = 185kN 97 kN = 88kN


Vdb ,max = 164kN + 97 kN = 261kN

Span 2
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Mdb,2=Mcapsup *RD=246 kNm *1.2=295kNm
Vm =

M db1 + M db 2 295 + 171


=
= 86kN
lc
5.4

Vdb ,min = 177 kN + 86kN = 263kN


Vdb ,max = 176kN 86kN = 90kN

Span 3
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Student:Lucaciu Sorin Andrei

Page 64

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Mdb,2=Mcapsup *RD=246 kNm *1.2=298kNm


Vm =

M db1 + M db 2 298 + 171


=
= 87 kN
5.4
lc

Vdb ,min = 176kN 87 kN = 89kN


Vdb ,max = 176kN + 87 kN = 263kN

Span 4
Mdb,1=Mcapinf*RD=142kNm *1.2=206kNm
Mdb,2=Mcapsup *RD=272 kNm *1.2=327kNm
Vm =

M db1 + M db 2 327 + 206


=
= 99kN
lc
5.4

Vdb ,min = 185kN 99kN = 86kN


Vdb ,max = 163kN + 99kN = 262kN

Student:Lucaciu Sorin Andrei

Page 65

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

a.Lungimea zonei critice


Lcr=1.5hw
Lcr==1.5*60=90cm

Student:Lucaciu Sorin Andrei

Page 66

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

VRd ,c = CRd ,c * k (100* f ck )1/3 * b * d


CRd ,c =

0.18

= 0.12

200
200
= 1+
= 0.008 < 0.02
d
550
= 86kN

k = 1+
VRd ,c

VRd ,min = 0.035* k 3/ 2 * f ck 1/2 * b * d = 0.0035*1.63/ 2 * 251/ 2 *300 *500 = 59kN


VRd ,max = bw * z * f cd / (ctg + tg )
z = 0.9 * d = 0.9 *550 = 495mm
f
= 0.6(1 ck ) = 0.55
250
VRd ,max = 681kN
Asw
VED
274 *1000
mm 2
(
)nec =
=
= 1.79
s
f ywd * z * ctg 300 * 495
mm
212 Asw = 2.26cm 2
Asw
226
=
= 126mm
Asw
1.79
(
) nec
s
A
226
mm 2
( sw )eff =
= 2.26
100
s
mm
n *A
2* 2.26 *100
= 0.015
w = e sw =
sw*b
100*300
sw =

min = 0.08 f ck / f yk = 0.001


0.015 > 0.001
sw < min(hw / 4;150mm; 7 dbL )
hw / 4 = 150mm
7 dbL = 126mm =>> sw 12cm

Choose sw-10 cm in the critical zone of the transversal beam

Student:Lucaciu Sorin Andrei

Page 67

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

x
4.5
=
=> x = 145
173 5.4
y = x + 88 = 145 + 88 = 233 => Vdb ,max 2 = 233kN

Asw
VED
233*1000
mm 2
)nec =
=
= 1.52
s
f ywd * z * ctg 300* 495
mm

212 Asw = 2.26cm 2


Asw
226
=
= 148mm
Asw
1.52
(
) nec
s
A
226
mm 2
mm 2
( sw )eff =
= 1.61
> 1.52
140
s
mm
mm
n *A
2 * 2.26 *100
w = e sw =
= 0.01
sw*b
140*300
sw =

min = 0.08 f ck / f yk = 0.001


0.01 > 0.001
sw 0.75* d =>
sw= 40cm

Choose sw-14 cm in the non-critical zone of the transversal beam


Span 2-non critical area

Student:Lucaciu Sorin Andrei

Page 68

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

x
4.5
=
=> x = 145
173 5.4
y = x + 88 = 145 + 90 = 235 => Vdb ,max 2 = 235kN

Asw
VED
235*1000
mm 2
)nec =
=
= 1.58
s
f ywd * z * ctg 300 * 495
mm

212 Asw = 2.26cm 2


Asw
226
=
= 143mm =>> s = 14cm
Asw
(
) nec 1.58
s
Asw
226
mm 2
mm 2
(
)eff =
= 1.61
> 1.52
s
140
mm
mm
n *A
2 * 2.26 *100
w = e sw =
= 0.01
140*300
sw*b
sw =

min = 0.08 f ck / f yk = 0.001


0.01 > 0.001
sw 0.75* d =>
sw= 40cm

Student:Lucaciu Sorin Andrei

Page 69

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 3

x
4.5
=
=> x = 150
180 5.4
y = x + 88 = 135 + 89 = 239 => Vdb ,max 2 = 239kN

Asw
VED
239 *1000
mm2
=
= 1.60
)nec =
s
f ywd * z * ctg 300 * 495
mm

212 Asw = 2.26cm 2


Asw
226
=
= 141mm =>> s = 14cm
Asw
1.60
(
) nec
s
A
226
mm 2
mm 2
( sw )eff =
= 1.61
> 1.60
s
140
mm
mm
ne * Asw 2 * 2.26 *100
w =
=
= 0.01
sw*b
140*300
sw =

min = 0.08 f ck / f yk = 0.001


0.01 > 0.001
sw 0.75* d =>
sw= 40cm

Student:Lucaciu Sorin Andrei

Page 70

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 4

x
4.5
=
=> x = 147
176 5.4
y = x + 86 = 147 + 86 = 232 => Vdb ,max 2 = 232kN

Shear force Longitudinal beam

=>>Seism from the left side


Span 1

Mdb,1=Mcapinf*RD=151kNm *1.2=181.2kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Student:Lucaciu Sorin Andrei

Page 71

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Vm =

M db1 + M db 2 181.2 + 123.6


=
= 69.27 kN
lc
4.4

Vdb ,min = 107 kN 69kN = 44kN


Vdb ,max = 67 kN + 69.27 kN = 136kN

Span 2
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 113kN 65.45kN = 47.65 N


Vdb ,max = 65kN + 65.45kN = 130.35kN

Span 3

Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 113kN 65.45kN = 47.65 N


Vdb ,max = 62.4kN + 65.45kN = 127.8kN

Span 4

Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 113kN 65.45kN = 47.65 N


Vdb ,max = 60.4kN + 65.45kN = 125.8kN
Student:Lucaciu Sorin Andrei

Page 72

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 5
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 113kN 65.45kN = 47.65 N


Vdb ,max = 62.6kN + 65.45kN = 128kN

Span 6
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 113kN 65.45kN = 47.65 N


Vdb ,max = 64.6kN + 65.45kN = 130kN

Span 7
Mdb,1=Mcapinf*RD=151kNm *1.2=181kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 659kN
lc
4.4

Vdb ,min = 113kN 69kN = 44 N


Vdb ,max = 66.7 kN + 69kN = 136kN

Span 8

Student:Lucaciu Sorin Andrei

Page 73

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 115kN 65.45kN = 50 N


Vdb ,max = 69kN + 65.45kN = 135kN

Seism=>> from the right side


Span 1
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.45kN
lc
4.4

Vdb ,min = 67 kN 65.45kN = 1.5 N


Vdb ,max = 107 kN + 65.45kN = 172kN

Span 2
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=151kNm *1.2=181.2kNm
Vm =

M db1 + M db 2 181 + 123.6


=
= 69.27 kN
lc
4.4

Vdb ,min = 64.9kN 69.27 kN = 3.37 kN


Vdb ,max = 113kN + 69.27 kN = 182.27 kN
Student:Lucaciu Sorin Andrei

Page 74

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Span 3
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.5kN
lc
4.4

Vdb ,min = 62.4kN 69.27 kN = 3.1kN


Vdb ,max = 113kN + 65.5kN = 178.5kN

Span 4
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.5kN
lc
4.4

Vdb ,min = 60.4kN 69.27 kN = 5.1kN


Vdb ,max = 113kN + 65.5kN = 178.5kN

Span 5
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.5kN
lc
4.4

Vdb ,min = 62.66kN 69.27 kN = 2.84kN


Vdb ,max = 113kN + 65.5kN = 178.5kN

Span 6
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm

Student:Lucaciu Sorin Andrei

Page 75

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm


Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.5kN
4.4
lc

Vdb ,min = 64.6kN 69.27 kN = 0.9kN


Vdb ,max = 113kN + 65.5kN = 178.5kN

Span 7
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=151kNm *1.2=181kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 69.27 kN
lc
4.4

Vdb ,min = 66.7 kN 69.27 kN = 2.57 kN


Vdb ,max = 115kN + 69.27 kN = 182kN

Span 8
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =

M db1 + M db 2 164.4 + 123.6


=
= 65.5kN
lc
4.4

Vdb ,min = 69kN 65.5kN = 3.5kN


Vdb ,max = 115kN + 65.5kN = 181kN

Student:Lucaciu Sorin Andrei

Page 76

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

VRd ,c = CRd ,c * k (100* f ck )1/3 * b * d


CRd ,c =

0.18

= 0.12

200
200
= 1+
= 1.6 < 2
d
450
= 64kN

k = 1+
VRd ,c

VRd ,min = 0.035* k 3/ 2 * f ck 1/2 * b * d = 0.0035*1.63/2 * 251/2 * 250* 450 = 40kN


VRd ,max = bw * z * f cd / (ctg + tg )
z = 0.9 * d = 0.9 * 450 = 405mm
f
= 0.6(1 ck ) = 0.55
250
VRd ,max = 455kN

VED=183kN (critic zone)


Asw
VED
183*1000
mm 2
(
) nec =
=
= 1.47
s
f ywd * z * ctg 250* 405
mm
212 Asw = 2.26cm 2
Asw
226
=
= 153mm
A
( sw ) nec 1.47
s
A
mm 2
226
( sw )eff =
= 2.26
s
100
mm
n *A
2* 2.26*100
= 0.018
w = e sw =
sw*b
100 * 250
sw =

min = 0.08 f ck / f yk = 0.001


0.018 > 0.001
sw < min(hw / 4;150mm;7 dbL )
hw / 4 = 125mm
7 dbL = 126mm =>> sw 12cm

Choose sw=10cm(critic zone)

Student:Lucaciu Sorin Andrei

Page 77

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

x
4.4 0.85
=
=> x = 143.2
177.5
4.4
y = x + 88 = 143.2 + 3.5 = 146.7 => Vdb ,max 2 = 148kN

Asw
VED
147 *1000
mm 2
=
= 1.44
(
) nec =
s
f ywd * z * ctg 300* 495
mm
212 Asw = 2.26cm 2
Asw
226
=
= 156mm
Asw
1.44
(
)nec
s
A
226
mm 2
mm 2
( sw )eff =
= 1.5
> 1.44
s
150
mm
mm
n *A
2* 2.26*100
w = e sw =
= 0.012
sw*b
150 * 250
sw =

min = 0.08 f ck / f yk = 0.001


0.012 > 0.001
sw 0.75* d =>
sw= 40cm

Student:Lucaciu Sorin Andrei

Page 78

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.6Reinforcement of columns

N ED
1690*103
=
= 0.26 < 0.5
b * h * f cd 600*600*16.67

Bending moment diagrams of the transversal girder considering the two direction
of the seismic activity

=>Seism from the left side

Student:Lucaciu Sorin Andrei

Page 79

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

M d* = Rd * M EDC (

M
M
M
M

M
M

Rd

= 1468kNm

Ed

= 1587kNm

Rd

Rd

Ed

Rd=1.3(DCH)

= 1.08

Ed

M d* = 1.3*1.08* M EDC
M d* = 1.4* M EDC

<=Seism from the right side


M d* = Rd * M EDC (

M
M
M
M

M
M

Rd

= 1583kNm

Ed

= 1477kNm

Rd

Rd

Ed

Rd=1.3(DCH

= 1.07

Ed

M d* = 1.3*1.07 * M EDC
M d* = 1.39* M EDC

Md* diagram
Student:Lucaciu Sorin Andrei

Page 80

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point I
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2


b*h
N ED
1083*103
x=
=
= 135.54
0.8* b * f cd 0.8*600*600

xmin = 2 * dss = 1.882*50 = 94.1mm


x > xmin => As ,total =

M d* N ED (0.5* h 0.4* x)
= 9.74cm 2
f yd (0.5* h ds )

M d* = 193.2kNm
N ED = 1083kN

=>>Minimum reinforcement 522 As=19cm2

Point II

Student:Lucaciu Sorin Andrei

Page 81

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
1052*103
x=
=
= 131.47 mm
0.8* b * f cd 0.8*600*600
xmin = 2 * dss = 1.882*50 = 94.1mm
x > xmin => As ,total =

M d* N ED (0.5* h 0.4* x)
= 16.70cm 2
f yd (0.5* h ds )

M d* = 135kNm
N ED = 1052kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Point III
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
650*103
x=
=
= 81.23mm
0.8* b * f cd 0.8*600*600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total

M d* N ED (0.5* h ds )
=
= 4.6cm 2
f yd (0.5* h ds )

M d* = 128kNm
N ED = 650kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Student:Lucaciu Sorin Andrei

Page 82

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point IV
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
650 *103
N ED
=
= 81.23mm
x=
0.8* b * f cd 0.8* 600 *600
xmin = 2 * dss = 1.882 *50 = 94.1mm

x < xmin => As ,total

M d* N ED (0.5* h ds )
=
= 1.16cm 2
f yd (0.5* h ds )

M d* = 146kNm
N ED = 619kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Point V
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
650 *103
x=
=
= 27.49mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm

x < xmin => As ,total

M d* N ED (0.5* h ds )
=
= 6.25cm 2
f yd (0.5* h ds )

M d* = 47 kNm
N ED = 220kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Student:Lucaciu Sorin Andrei

Page 83

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point VI
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
189 *103
N ED
=
= 23.62mm
x=
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm

x < xmin => As ,total

M d* N ED (0.5* h ds )
=
= 9.72cm 2
f yd (0.5* h ds )

M d* = 73kNm
N ED = 189kN
f yd = 300 N / mm 2

Computation of the the capable bending moments in the


column
Point I
N Ed = 1083kN
x = 135.54mm
x > xmin =>> M Rd = N ED (0.5h 0.4 x ) + As.total * f yd (0.5h ds )
M Rd = 546.2kNm

Point II
N Ed = 1052kN
x = 131.47 mm
x > xmin =>> M Rd = N ED (0.5h 0.4 x ) + As.total * f yd (0.5h ds )
M Rd = 530.2kNm
Student:Lucaciu Sorin Andrei

Page 84

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point III
N Ed = 650kN
x = 81.23mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 432.5kNm

Point IV
N Ed = 620kN
x = 77.35mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 425kNm

Point IV
N Ed = 220kN
x = 27.49mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 325kNm

Point IV
N Ed = 189kN
x = 23.69mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 318kNm

Student:Lucaciu Sorin Andrei

Page 85

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Column reinforcement on Y direction(longitudinal girder)

=>Seism from the left side


M d* = Rd * M EDC (

M
M
M
M

M
M

Rd

= 1948kNm

Ed

= 1636kNm

Rd

Rd

Ed

Rd=1.3(DCH)

= 1.2

Ed

Student:Lucaciu Sorin Andrei

Page 86

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

M d* = 1.3*1.2* M EDC
M d* = 1.56* M EDC

<=Seism from the right side


M d* = Rd * M EDC (

M
M
M
M

M
M

Rd

= 1948kNm

Ed

= 1646kNm

Rd

Rd

Ed

Rd=1.3(DCH)

= 1.2

Ed

M d* = 1.3*1.2* M EDC
M d* = 1.56* M EDC

Md* diagram

Student:Lucaciu Sorin Andrei

Page 87

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point I
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
1083*103
N ED
=
= 135.54
x=
0.8* b * f cd 0.8*600*600

xmin = 2 * dss = 1.882*50 = 94.1mm


x > xmin => As ,total =

M d* N ED (0.5* h 0.4* x )
= 6.56cm 2
f yd (0.5* h ds )

M d* = 217 kNm
N ED = 1083kN

=>>Minimum reinforcement 522 As=19cm2

Point II
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
1083*103
x=
=
= 131.54
0.8* b * f cd 0.8* 600* 600

xmin = 2 * dss = 1.882 *50 = 94.1mm


x > xmin => As ,total

M d* N ED (0.5* h 0.4* x )
=
= 14.43cm 2
f yd (0.5* h ds )

M d* = 152kNm
N ED = 1052kN

=>>Minimum reinforcement 522 As=19cm2

Student:Lucaciu Sorin Andrei

Page 88

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point III
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
650 *103
x=
=
= 81.23mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882*50 = 94.1mm
x < xmin => As ,total =

M d* N ED (0.5* h ds )
= 24.66cm 2
f yd (0.5* h ds )

M d* = 144kNm
N ED = 650kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Point IV
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
650 *103
x=
=
= 77.35mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total =

M d* N ED (0.5* h ds )
= 1.10cm 2
f yd (0.5* h ds )

M d* = 53kNm
N ED = 220kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2


Student:Lucaciu Sorin Andrei

Page 89

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point V
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
650 *103
N ED
=
= 27.49mm
x=
0.8* b * f cd 0.8* 600 *600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total

M d* N ED (0.5* h ds )
=
= 0.26cm 2
f yd (0.5* h ds )

M d* = 53kNm
N ED = 220kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2

Point VI
min = 0.01
min =

Asc ,total

=> Asc ,total = min * b * h = 36cm 2

b*h
N ED
650 *103
x=
=
= 23.7 mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total =

M d* N ED (0.5* h ds )
= 4.63cm 2
f yd (0.5* h ds )

M d* = 82kNm
N ED = 189kN
f yd = 300 N / mm 2

=>>Minimum reinforcement 522 As=19cm2


Student:Lucaciu Sorin Andrei

Page 90

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Shear force in columns


Column base
M dc1 = Rd * M Rd 1
M dc1 = 1.3*537 = 698kNm
M dc 2 = Rd * M Rd 2 * min[1;

M
M

Rd 2
Rc 2

rd=1.3 (column base DCH condition)


Seism direction=>>

M
M
M
M

Rb 2

= 390kNm

Rc 2

= 963kNm

Rb 2

= 0.40

Rc 2

M dc 2 = 1.3*531*0.40 = 277kNm

Vdc =

M dc1 + M dc 2 698.1 + 277


=
= 304kN
lc
3.2

lc = H column hgirder / 2 = 3.2m

Groundfloor column
Mdc2=277kNm

Student:Lucaciu Sorin Andrei

Page 91

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

M
M
M
M

Rb

= 390kNm

Rc

= 425 + 325 = 750kNm

Rb 2

= 0.52

Rc 2

M dc 3 = 1.3* 425*0.40 = 264kNm


M dc 2 = 277 kN

Vdc =

M dc 2 + M dc 3 264 + 277
=
= 187 kN
lc
2.9

lc = H column hgirder = 2.9m

Groundfloor column
Mdc2=277kNm
M dc3 = 264kNm
M dc 2 = 1.2*318 = 382kNm
Vdc =

M dc 2 + M dc 3 264 + 318
=
= 200kN
lc
2.9

lc = H column hgirder = 2.9m

Shear force diagram

Student:Lucaciu Sorin Andrei

Page 92

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Point A
(

Asw
V
304 *1000
mm 2
) nec = ED =
= 2.00
s
f ywd *z 309* 495
mm

f ywd = 309 N / mm 2
z = 0.9 * d = 495mm
d = h ds = 600 50 = 550mm

lcr=max{1.5hc;lcl/6;600mm}
lcr=max{90;54;60}
lcr=90cm
lcl/hc=2.9/0.6=4.83>3
sw,max<min{b0/3;125mm;7dbl}
(

Asw
VED
304*1000
mm 2
) nec =
=
= 2.00
s
f ywd * z * ctg 309 * 495
mm

10 ( Asw )ef = 4 *0.785 = 3.14cm 2


Asw
314
=
= 157 mm
Asw
2.00
(
)nec
s
A
314
mm2
mm2
( sw )eff =
= 2.09
> 2.00
s
mm
mm
150
n *A
4*3.14*100
w = e sw =
= 0.03
sw*b
150* 250
sw =

min = 0.005
Student:Lucaciu Sorin Andrei

0.03 > 0.005

b0=hcol-2*cnom
b0/3=197mm
7dbl=7*22=154
mm
sw,max<{197;12
5;154}
Page 93

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

sw,max<125mm

Choose sw=10cm in the critical zone


Point B
(

Asw
VED
187 *1000
mm 2
=
= 1.22
) nec =
s
f ywd * z * ctg 309* 495
mm

10 ( Asw )ef = 4 *0.785 = 3.14cm 2


Asw
314
=
= 250mm
Asw
1.22
(
)nec
s
=>> sw 12
sw =

Asw
mm2
mm2
314
= 2.61
> 1.22
)eff =
s
mm
mm
120
ne * Asw 4*3.14*100
w =
=
= 0.04
sw*b
120* 250

min = 0.005
0.04 > 0.005

Asw
VED
200 *1000
mm 2
)nec =
=
= 1.30
s
f ywd * z * ctg 309* 495
mm

10 ( Asw )ef = 4*0.785 = 3.14cm

Point C

Asw
314
=
= 230mm
Asw
(
)nec 1.30
s
=>> sw 12cm
sw =

Asw
314
mm 2
mm 2
)eff =
= 2.61
> 1.30
s
120
mm
mm
n *A
4*3.14 *100
w = e sw =
= 0.04
sw*b
120* 250

min = 0.005 Sorin Andrei


Student:Lucaciu
0.04 > 0.005

Page 94

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.7Computation of the node

The node is a interior node


1.First case is when the seismic load has a left to right direction
Vjhd = Rd ( Ass + Asi ) * fyd Vc
Ass = 3 22 + 218 = 16.48cm 2
Asi = 3 20 = 6.42cm 2
Vc = 56kN
Vjhd = 1.2*(1648 + 942) *300 56*103
Vjhd = 877 kN

Vertical shear force


Vjvd =

hb
600
Vjhd =
*877 = 877 kN
hc
600

Student:Lucaciu Sorin Andrei

Page 95

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Limiting the compression force


Vjhd 1

Vd

* bj * hc * fcd

25
) = 0.54
250
643*103
Ned
=
= 0.16
=
b * d * fcd 600*600*16.67
bj = min(bc;(bw + 0.5hc))
bj = min(600; 600)

= 0.6(1

bj = 600mm
Vjhd 0.54 1

0.16
*600*600*16.67
0.54

Vjhd 2718kN
877 < 2718kN ok

Check of the Horizontal stirrups


Ashef Ash nec =

0.8( Ass + Asi )* fyd (1 0.8 d )


fywd

644*103
= 0.11
600*600*16.67
0.8*(1648 + 942) *300(1 0.8*0.11)
Ash nec =
= 18.34cm 2
309

d =

Student:Lucaciu Sorin Andrei

Page 96

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Ashef = netr * 4* 0.785cm 2


18.84 = netr * 4*0.785
netr = 6

Check of longitudinal reinforcement


2
Ash (h jc / h jw )
3
h jc = hc d s1 d s 2 = 600 46 46 = 509mm
Asv

h jw = hw d s1 d s 2 = 600 57 55 = 488mm
2
508
Asv *1844*
3
488
2
Asv 12.79cm
Asv = 19.00cm 2

2.Second case when the seismic load has the direction from right to left

Student:Lucaciu Sorin Andrei

Page 97

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Vjhd = Rd ( Ass + Asi ) * fyd Vc


Ass = 3 22 + 218 = 16.48cm 2
Asi = 3 20 = 6.42cm 2
Vc = 56kN
Vjhd = 1.2* (1648 + 942)*300 56*103
Vjhd = 877 kN

Vertical shear force


Vjvd =

hb
600
Vjhd =
*877 = 877 kN
hc
600

Limiting the compression force


Vjhd 1

Vd

* bj * hc * fcd

25
) = 0.54
250
Ned
649*103
=
=
= 0.10
b * d * fcd 600*600*16.67
bj = min(bc;(bw + 0.5hc))

= 0.6(1

bj = min(600; 600)
bj = 600mm
Vjhd 0.54 1

0.10
*600*600*16.67
0.54

Vjhd 2925kN
877 < 2925kN ok

Student:Lucaciu Sorin Andrei

Page 98

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Check the horizontal stirrups


Ashef Ash nec =

0.8( Ass + Asi ) * fyd (1 0.8 d )


fywd

644*103
= 0.11
600*600*16.67
0.8*(1648 + 942) *300(1 0.8*0.11)
= 18.34cm 2
Ash nec =
309

d =

Ashef = netr * 4 *0.785cm 2


18.84 = netr * 4*0.785
netr = 6

Student:Lucaciu Sorin Andrei

Page 99

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

7.8BLOCK AND PILLOW FOUNDATIONS DESIGN


N

Tx

Y
hc
H
Hb

On the location where the geotechnical study was done is designed a building with 4
spans and 8 bays. The columns section is 60x60 cm: .Soil characteristics are identified in bore
F1.
The building has underground level,ground level and a floor level.
Forces acting on the column are:
N= 1700 kN
My =138 kNm
Vz=67 kN
Mz=131 kNm
Vy=60 KN
The foundation soil has the following characteristics:
N y = 0.4

c = 48kN / m 2

= 12o

, where

= 18.5kN / m 3

Student:Lucaciu Sorin Andrei

Nq = 3
N c = 9.38

Page 100

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

The conditions for determining the minimum foundation depth are: Foundation depth;
Df =3.0 m

Pre-Dimensioning of the block and pillow foundations :


We choose :

B=2.4 m
L=2.4 m
bc=1.4 m
lc=1.4 m

Student:Lucaciu Sorin Andrei

Page 101

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

We have fine soils, with high plasticity index (Ip >20% ; e<1.1) so it results that:

Ic =

W l - W 46.6% - 26.5%
=
= 0.72
Ip
27.6%

By linear interpolation between e and Ic values it is found pconv = 311 kPa.


As tg >0.65 in order to avoid shear check => hc=0.5m.
Also tg >1.3 => H=0.8 m.
Df= 3.40 m
B<5 m => pconv= pconv +CB+CD
K=0.05 Cohesive soil
CB= pconv *K1(B-1)
CB=279*0.005(2.4-1)
CB=19.53

CD = ( D 2)
CD = 18.5*0.4
CD = 18.5
=> Pconv=279+19.53+18.5=311 kPa
pef max<1.6* pconv
pef max < 497.11 kN/m2

Student:Lucaciu Sorin Andrei

Page 102

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Calculation of pressure on the concrete block:


p1, 2,3, 4 =

Ntot 6 Mx
6M
2

L * B L * B L * B2

Gf = L*B*H* b + bc*hc*lc* b = 2.4*2.4*0.8*24 +1.4*1.4*0.5*25 = 135kn


ex =

My
138
=
= 0.07 m
N+ Gf 1690 +107.32135

ey =

Mz
131
=
= 0.07 m
N+ Gf 1690 + 135

Annex A- limitation of excentricity

e12 e 22 1
+ 2 <
L2
B
9

0.07 2 0.082
1
+
= 0.17 < (0.11)
2
2
2.4
2.4
9

e1=ex e2=ey
Pef1=

N+ Gf
6 ey 6 ex 1825
6*0.07
(1+
+
)=
(1+ 2*
) = 428 k N / m 2
2
B* L
L
B
2.4
2.4 2

Pef2=

N+ Gf
6 ey 6 ex 1825
6*0.07 6*0.07
(1+

)=
(1+

) = 317 k N / m 2
2
B* L
L
B
2.4
2.4
2.4

Pef3=

N+ Gf
6 ey 6 ex 1825
6 *0.07 6*0.07
(1
+
)=
(1
+
) = 317 k N / m 2
2
B* L
L
B
2.4
2.4
2.4

Pef4=

N+ Gf
6 ey 6 ex
(1

) = 206 k N / m 2
B* L
L
B

Student:Lucaciu Sorin Andrei

Page 103

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Calculation of pcritical :

p ef med < mc*p critical


mc-coefficent imposed by the designer in function of the importance class of the
biulding ; mc=1
pcr= b *B*Ny*y+Nq*q*q+c*Nc*c [kPa]

b =18.5 kn/m3
B;L-reduced dimmensions of the foundation
B=B-2*e2=2.4-2*0.07=2.26 m
L=L-2*e1=2.4-2*0.07=2..26 m
Ny,Nq,Nc- non-dimmensional coefficents of bearing capacity
=12 => by linear interpolation
Ny=0.4
Nq=3
Nc=9.38
q- overweight that acts on the foundation level
q=1.7*18.5=31.45 kn/m2
c-the calculus value for cohesion
c=48 kn/m2
B/L=2.2/2.2=1 => square shape
c,q=1.3
y=0.6
Pcr= 18.5*2.26*0.4*0.6+3*1.3*31.45+48*9.38*1.3=718 kn/m2
Student:Lucaciu Sorin Andrei

Page 104

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

p ef med =

428 + 317 + 317 + 206


= 317 kN / m 2
4

p ef med< mc*Pcr

Computation of the pillow reinforcement:

lc

ly

bs

bc

ls

pmed
lx
p2
p1
p0

N01=N+Gpillow=1690+1.4*1.4*0.5*25=1715 kN
M01y=My+Vz*hc=138+67*0.5=171.5 kn/m2
M01z=Mz+Vy*hc=131+60*0.5=161 kn/m2
ex=

M 01 y 171.5
=
= 0.1m
N 01 1715.5

ey=

M 01x
161
=
= 0.09m
N 01 1714.5

1<fcd ; fcd=20/1.5=13.33 kN/mm2

1=

N 01
6ex 1714.5
6 *0.1
(1 +
)=
(1 +
) = 1250kn / m 2
2
lc * bc
lc
1.4
1.4

Student:Lucaciu Sorin Andrei

Page 105

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

1<fcd(13333 kN/m2)
2<fctk0.005 C20/25 => fctk0.005=1.5 N/m2
2=

N 01
6ex 1714.5
6* 0.1
(1
)=
(1
) = 656kn / m 2
2
lc * bc
lc
1.4
1.4

2<fctk0.005 (1600 kN/m2)


3<fcd
3=

N 01
6ey 1714.5
6* 0.09
(1 +
)=
(1 +
) = 1212kn / m 2
2
lc * bc
lc
1.4
1.4

3<fcd(13333 kN/m2)
4<fctk0.005
4=

N 01
6ey 1714.5
6 *0.09
(1
)=
(1
) = 55kn / m 2
2
lc * bc
lc
1.4
1.4

4<fctk0.005 (1600 kN/m2)


x0=

1 2
lc

(lc lx ) + 2 =

1250 656
(1.4 0.4) + 656 = 658kn / m 2
1.4

lx=(lc-bst)/2=0.4m
ly=(bc-bst)/2=0.4m
y0=

3 4

x med =
y med =

lc

(bc ly ) + 4 =

1+ 2
2

3+ 4

Mx= [ x0*

1212 543
(1.4 0.4) + 543 = 1021kn / m 2
1.4

= (1250 + 656) / 2 = 953kn / m 2


= (1212 + 543) / 2 = 878kn / m 2

lx2
lx2
0.42
0.42
+ ( 1 x0)* ] = 1.4*[658*
+ (1250 658)*
] = 117.8Knm
2
3
2
3

Student:Lucaciu Sorin Andrei

Page 106

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

My=lc* med*ly2/2=1.4*878*0.42/2=98.24 kN/m2


d=hc-(Cnom+/2)=50-(3.5+2/2)=45.5 cm
exposure class XC2 => c min dur=25 mm
c min b= max=20 mm
=>c min=25 mm
c dev=10 mm
=>Cnom=35 mm
h0x=d=45.5 cm
h0y=h0x- max=43.5 cm
reinforcement PC52 => fyd=300 N/mm2

Mx
117.8*106
=
= 9.86cm 2
Aax =
0.875* h0 x * fyd 0.875* 455*300
 solution 714, As=10.78 cm2

Aay =

My
98.24*106
=
= 8.60cm 2
0.875* h0 y * fyd 0.875*435*300

 solution 614, As=9.24 cm2

Reinforcement percentage :
px =

Aax
1078
=
= 0.16%
bc * h0 x 1400* 455

py =

924
Aay
=
= 0.13%
lc * h0 y 1400 * 435

Spacing of bars
bc-2*(Cnom+/2)=(140-8.4)/6=21cm
Student:Lucaciu Sorin Andrei

Page 107

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

=> 714/21
lc-2*(Cnom+/2)=(140-8.4)/6=21 cm
=>614/21

Reinforced concrete connecting beam:


concrete C20/20
reinforcement PC52
h=0.6m
b=0.3m
l=6m

g wall=2.9m * 0.3m *12 kN/m3*=7.97 kNm


M=(q*l2)/8=(7.97*62)/8=35.8 kNm
R=q*l=7.97*6=47.82 kN

Med
35.86*106
=
= 0.02
b * h2 * fcd 300*5552 i13.33

= 1 1 2* = 1 1 2*0.02 = 0.03
Ao = * b * h

fcd
13.33
= 0.03*300*555
= 2.21cm2
fyd
300

Student:Lucaciu Sorin Andrei

Page 108

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

d=h-ds=50-(Cnom+/2)=55.5 cm
fcd=20/1.5=13.33

0.5

fctm
2.2
=> 0.5*
fyk
345

>0.0027
 solution 316 As=6.03 cm2 for both bottom and top reinforcement

w =

Ass
603
=
= 0.006 > 0.003
b * d 300*555

stirrups: min=6 mm
=>=8 mm

sw 0.75d => sw 40cm

w =

n * Asw
2*50.3
=
= 0.0016
sw * b
400*300

0.08 20
= 0.001 => ok
345

Student:Lucaciu Sorin Andrei

=>8/40 stirrups

Page 109

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 110

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Economic calculus and site management

Student:Lucaciu Sorin Andrei

Page 111

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

8.1MEMORIU TEHNICO ECONOMIC


Prin tema de proiectare s-a cerut realizarea unei construcii n regim
D+P+E cu destinatia centru SPA.
Pentru a se stabili valoarea total a investiiei ct i durata de execuie a
lucrrii s-a ntocmit o documentaie economic, care cuprinde:
A. Documentaia economic
- pe baza planelor de arhitectur i rezisten s-a realizat o
antemsurtoare n care sunt specificate cantitile , unitile de masur i
simbolurile pentru fiecare articol in parte.
-cantitatile rezultate in urma antemasuratorii au fost introduse in
programul de calcul DOCTEC.
-in urma rularii programului sau obtinut extrasele de resurse
principale(materiale, manopera, utilaje), precum si valoarea devizului pe categorii
de lucrari DCL.
- s-a intocmit devizul general i devizul pe obiect. n cadrul devizului
general s-au introdus urmtoarele cheltuieli : cheltuieli pentru obinerea i
amenajarea terenului, cheltuieli pentru proiectare i asisten tehnic, cheltuieli
pentru investiii de baz, alte cheltuieli (organizare de antier, comisioane, taxe,
cheltuieli diverse i neprevzute).
Devizul pe obiect este mprit n trei categorii :
I lucrri de c-ii i instalaii
II montaj
III procurare.
B. Programarea lucrrilor
Programarea n timp a execuiei lucrrilor sa executat in programul
MICROSOFT PROJECT,
program prin intermediul caruia sau preluat datele
introduse in programul DOCTEC.Aceasta programare a lucrarilor contine
urmatoarele etape :
- ntocmirea listei de activiti i calculul volumelor de munc pe
activiti
- transpunerea rezultatelor n ealonare calendaristic cu bare de tip
GANTT

Student:Lucaciu Sorin Andrei

Page 112

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

- profilul diagramelor de resurse i indicatorii de calitate (pentru fora de


munc , utilaje)
n urma acestei programri a rezultat o durat total de execuie a
construciei de 360 zile. n urma ntocmirii ealonarii calendaristice prin metoda
GANTT a rezultat un coeficient de aplatizare : Ca = 0.73. Aceast valoare a
coeficientului de aplatizare indic faptul c ealonarea calendaristic a fost
ntocmit corect. Resursa maxim este de 27 muncitori ntr-o zi.
C. Organizarea de antier
Pentru o mai bun desfaurare a activitii pe antier, inginerului
constructor i revine sarcina de a ntocmi o organizare de antier.
Aceasta organizare de antier const n urmtoarele:
- calculul suprafeelor de depozitare a materialelor principale innd seama
de mrimea stocului maxim la un moment dat i strategia de aprovizionare
adoptat. n cadrul prezentului proiect s-a considerat c aprovizionarea cu matriale
se face din ase n ase zile n funce de cantitatea de material i numrul de zile n
care se utilizeaz. S-a considerat c materialele utilizate vor fi adpostite n funcie
de natura lor n depozite nchise (ciment, var), n depozite acoperite (armtur,
materialul lemnos, geamul), n depozite deschise (nisipul, pietriul, balastul,
crmida, bitumul). n urma acestui calcul au rezultat suprafeele de depozitare
pentru materiale . n funcie de aceste suprafee, pe antier se vor realiza
depozitele pentru materiale.
Volumul mijloacelor circulante propii se determin pe baz de normative
iar pentru calculul necesarului de materiale se folosete norma de consum ,
respectiv cantitatea de resurse materiale ce se consum pentru producerea unei
uniti de produs sau prestarea unui serviciu. Normele de consum reprezint
elementele principale ale planului de aprovizionare tehnico material, constituind
baza normativ a planificrii aprovizionrii tehnico materiale.

Student:Lucaciu Sorin Andrei

Page 113

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

8.2Indicatori tehnico-economici

1.Coeficientul de aplatizare
Ca

(e * d )
Dex * nr.max demunc

5573
= 0.73 > 0.65
360* 21

Activitate
Pregatirea_terenului
Sapaturi
Infrastructura
subsol
parter
etaj
sarpanta

d
1
1
30
33
33
33
16

e
4
2
13
20
20
20
8

VM
4
2
390
660
660
660
128

Scara_interioara

zidarie_subsol

14

126

zidarie_parter

14

zidarie_etaj

14

9
9

126
126

tencuieli inte

46

18

828

tencuieli_ext

13

tamplarie

13

14
11

182
143

zugraveli_int

35

pardoseli_reci

28

224

pardoseli_calde

20

160

zugraveli_ext

10

tinichigerie

10
5

100
15
4573

Durata executiei Dex=361 zile


Student:Lucaciu Sorin Andrei

Page 114

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Numarul maxim de muncitori=26


Coeficientul de aplatizare=0.72

2.Investitita totala I(valoarea din devizul general)


I=2.995.668 lei
Indici de consum pentru materiale
 Ciment
Cant 583000kg
=
= 202.4kg / m 2
Sd
2880mp
Cant 583000kg
Cs =
=
= 0.19kg / lei
I
2995668
Cs =

 Armatura

Cant 163070kg
=
= 57 kg / m 2
Sd
2880mp
Cant 163070
Cs =
=
= 0.054buc / lei
I
2995668
Cs =

 Caramida
Cant 28088kg
=
= 9.75buc / m 2
Sd
2880mp
Cant 28088kg
Cs =
=
= 0.009buc / lei
I
2995668
Cs =

3.Durata de executie a investitiei


D=360 zile

Student:Lucaciu Sorin Andrei

Page 115

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

4.Aria construita
S=960 m2

5. Suprafata desfasurata utila


Sd=2880 m2

6.Procentul de ocupare al terenului


POT=12%

7.Coeficientul de utilizare al terenului


CUT=0.49

8.Indicii de cost
Ic =

I 2995668
=
= 1040lei / m 2 = 236 Euro / m 2
S
2880

9.Productivitatea muncii
Pm = (C + M )

Fta
Fttm

C + M = 2883244
Fta = 1784ore / an
Fttm = 31725[oreom]
Pm = 162134lei / oman

Student:Lucaciu Sorin Andrei

Page 116

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Slab over the underground level reinforcement area on Y direction

Bottom reinforcement on Y direction

Student:Lucaciu Sorin Andrei

Page 117

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Top reinforcement area on X dirextion

Bottom reinforcement on X direction

Student:Lucaciu Sorin Andrei

Page 118

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Slab over the last floor:Top reinforcement on Y direction

Slab over last floor:Bottom reinforcement on Y direction

Student:Lucaciu Sorin Andrei

Page 119

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Slab over last floor:Top reinforcement on X directio

n
Slab over last floor:Bottom reinforcement on X direction

Student:Lucaciu Sorin Andrei

Page 120

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Stair reinforcement
Ramp 1

Ramp 2

Student:Lucaciu Sorin Andrei

Page 121

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Transversal girder

Longitudinal girder

Student:Lucaciu Sorin Andrei

Page 122

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 123

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Bending moment Columns

Axial force in column from combination with S7


Student:Lucaciu Sorin Andrei

Page 124

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Axial force in column with combination containing S8

Student:Lucaciu Sorin Andrei

Page 125

`POLITEHNICA UNIVERSITY OF TIMISOARA


CIVIL ENGINEERING FACULTY

Student:Lucaciu Sorin Andrei

Page 126