Professional Documents
Culture Documents
Technical Memoir
Arhitecture
1.Location characteristics
The building is located at the extremity of the city Timisoara.The terrain
surface has 4800 m2. having rectangular form with the following
dimensions 120m x80 m.On current terrain there is no construction
present and surface is relatively plane.
Purpose
Terrain dimensions
Height
Construction height
Constion surface
Entire surface
Suprafaa utila
Cateoria de importan
Clasa de importan
P.O.T.
C.U.T.
SPA Center
80 x 60 m
D+P+1E
14m
861 m2
2583 m2
1085 mp
18%
0,73%
Page 1
Page 2
For the exterior side of the building the color of the painting used is
mostly dark yellow.The woodwork used for the doors and windows has
the color brown.
At the interior the walls are painted in different colors.The warm floor
is made of oak wood.The cold floor is made out of sandstone tiles.
The cold floor is present mainly at the underground level ,where the
swimming pool is located.
The roof structural system is realized by wood framing.The height of
roof is 4 m.
Page 3
SPA Center
Location
Timisoara
Page 4
3.Structural system
The structural system of the building is made out of reinforced concrete
frames.Columns,transversal and longitudinal girder.
The columns have a square section of 60x60 cm.The transversal girders
have a rectangular section of 30x60cm while the longitudinal girders
have a rectangular section of 25x50cm.
The exterior walls are non-structural and are mode out of masonry with
the thickness of 30cm
Then interior walls are also made of masonry with the thickness of
12.5cm
The horizontal structural system is made out of girders on both
directions and reinforced concrete slabs.
The first reinforced concrete slab is at the height +3.50m.The thickness
of the slab is 20 cm with reinforcement on both directions.
The second reinforced concrete slab is located at the height +7.00m
with the thickness of 20 cm and reinforced on both directions.
The third reinforced concrete slab is at the height +10.5m .
The concrete used for the upper part of the structure is C25/30 while
the concrete used at the foundations is C20/25.
Page 5
Intocmit
Lucaciu Sorin Andrei
Page 6
Page 7
7.1Load Evaluation
1.Permanent loads
Dead weight of the slab
Superior finishing : a) Parquet floor (warm floor)
Parquet Floor
No.
Material Name
1.
Parquet
2.
Sound Insulation
3.
Specific
weight[kg/m3]
Thickness
[m]
Own
weight[daN/m2]
420
0.022
9.24
80
0.003
0.24
Support Casing
1200
0.025
30
4.
Reinforced Concrete
Slab
2500
0.20
500
5.
Plaster
1600
0.02
32
TOTAL
571daN/m2
Page 8
Thickness
[m]
Own
weight[daN/m2]
No.
Material Name
1.
Sandstone Tiles
2400
0.008
19.2
2.
Mortar
2100
0.005
10.5
3.
Compensatory
Coping
1200
0.037
44.4
4.
Reinforced Concrete
Slab
2500
0.15
500
5.
Plaster
1600
0.02
32
TOTAL
606daN/cm2
Compartment walls
bwall=12.5cm
material:ceramic block
=12kN/m3
gk,cw=0.125*12=3kN/m2
Inferior finishing
false ceiling gypsum board: t=20 mm
gb=11.5 kN/m3
Student:Lucaciu Sorin Andrei
Page 9
gkif=0.02*11.5=0.23 kN/m2
Closing walls:
ceramic blocks b=300mm
b=12 kN/m3
glass are:70%
h=3.5m-0.6=2.9m
=> gkcw=0.3*12*2.9*0.3=3.13 kN/m
2.Variable loads
Live load:
=> C4 category => National Annex :
qk=5kN/m2
Snow load
s=is*i*Ce*Ct*sk
-Location: Timisoara=> sk=1.5 kN/m2
-Importance class II=> is=1.10
-complete exposure => Ce=0.8
-Ct=1.00
=0.8
=> sk=1.10*0.8*0.8*1*1.5=1.05kN/m2
Wind load
Page 10
We= iw*Cpe*qp(Ze)
iw=1.15 importance class II
Cpe= ?
h=10.5 m
b=24m
=>h<b
qp(Z)=qp(Ze)
e=min(b;2h)
b=40m
2h=2*10.5m=29m
=>d=24m
e=29m
e<d =>
h/d=14/24=0.58
Zone A
Area in zone A=e/5*h=81 m2
Area in zone B: B=(d-e/5)*h=255m2
D=E=40*14= 560 m2
=> CpeA=Cpe10=-1.2
CpeB=Cpe10=-0.8
CpeD=Cpe10=+0.7
Student:Lucaciu Sorin Andrei
Page 11
Iv( z ) =
2.5ln
Z min
Z0
2.35
= 0.27
14
2.5ln
0.3
=>Cpq(Z)=1+7*0.27=2.89
qm(Z)= C02*Cr2(Z)*qb
Cr2(Z)=Kr2(Z0)* [ln(
Z min 2
)]
zo
Kr2(Z0)=0.046
=> Cr2(Z)=0.53
=>qm(Z)=0.54*0.6=0.318
=>qp(Z)=2.89*0.318=0.91
We= iw*Cpe*qp(Ze)
=>
WeA=1.14*(-1.2)*0.91=--1.25 kN/m2
WeB=1.15*(-0.8)*0.91=-0.83kN/m2
WeD=1,15*(+0.7)*0.91=+0.0.73 kN/m2
WeE=1.15*(-0.31)*0.91=-0.32 kN/m2
Student:Lucaciu Sorin Andrei
Page 12
Wind on roof
h=14m
b=40m
=>>e=2h
Area in zone F
e/4*e/10=10.15 m2
Cpe,F=Cpe,10=-1.3
Area in zone G
(b-2e/4)*e/10=28 m2
Cpe,G=Cpe,10=-1.3
Area in zone H
(e/2-e/10)*b=209 m2
CpeH=Cpe10=-0.6
Area in zone I
b*e/2=348 m2
Student:Lucaciu Sorin Andrei
Page 13
CpeI=Cpe10=-.5
qp(Z)=Cpq(Z)*qm(Z)
Cpq(Z)=1+2g*Iv(Z)=1+7*Iv(Z)
Category of land:III=> Z0=0.3m; Zmin=5m
Iv( z ) =
2.5ln
Z min
Z0
2.35
= 0.27
14
2.5ln
0.3
=>Cpq(Z)=1+7*0.27=2.76
qm(Z)= C02*Cr2(Z)*qb
Cr2(Z)=Kr2(Z0)* [ln(
Z min 2
)]
zo
Kr2(Z0)=0.046
=> Cr2(Z)=0.63
=>qm(Z)=0.63*0.6=0.38
We= iw*Cpe*qp(Ze)
=> WeF=1.15*(-1.3)*0.38=-0.56kN/m2
WeG=1.15*(-1.3)*0.38=-0.56kN/m2
WeH=1.15*(-0.6)*0.38=-0.26kN/m2
WeI=1.15*(-0.21)*0.38=-0.21kN/m2
Page 14
Seismic load
Location:Timisoara
ag=0.20g
Tc=0.7s
Checks :
Lateral displacement verification ( P100-2013 Annex E)
drSLS<draSLS
draSLS=0.005h=0.005*3500=17.5mm
drULS<draU:S
draU:S=0.025h=0.025*3500=87.5mm
Student:Lucaciu Sorin Andrei
Page 15
N
1690*1000
=
= 0.28 < 0.4 ok
b * h * fcd 60*60 *16.67
< 0.1 on every floor so the second order effects can be neglected
Thermal-Hygro-Energetical Memoir
The calculus for the thermal resistance fot the designed house was made with
respect to the code Normativ C 107-1 (Normativ privind calculul coeficienilor
globali de izolare termic la cldirile de locuit ).
This calculus was made for an exterior wall, the slab above ground and the
terrace; using the Therwoline program.
The thermal resistance was determined taking into account that these
elements are composed of layers of homogenous materials, placed on the direction
of the heat flux. In order to determine this thermal resistance the formula was
applied:
n
R = R + R + Re
i
j
j =1
m2K
where:
n
j
Rj =
j=1
j
Page 16
1
R =
resistance to heat transfer at the inner surface
i
i
1
Re =
resistance to heat transfer at the exterior surface
e
J = thermal conductivity
i ; e = heat transfer coefficients form the surface
Page 17
7.2Thermal-Hygro-Energetical Calculus
Exterior Wall
Page 18
Page 19
Page 20
k=0.255 1/k=3.92
=>
1/k>Rmin=1.20
Ground Slab
Page 21
Page 22
k=0.23 1/k=4.34
=>
Page 23
Page 24
Page 25
Page 26
The roof framing is made of softwood having the resistance class C40.
The characteristics of the resistance class C40 are the following:
resistance in bending:
f m, k = 40 N / mm 2
resistance in shear:
f v, k = 3,8n / mm2
Page 27
Page 28
Page 29
Combination 1
(gd+sd)*cos=(4.66daN/m+31.5daN/m)*cos18=34.71daN/m
(gd+sd)*sin==(4.66daN/m+31.5daN/m)*sin18=9.76daN/m
My =
ql
9.76 *0.82
=
= 0.78daN / m
8
8
Combination 2
pd*cos=120*cos18=114.1daN
gd*cos=4.66*cos18=4.43daN/m
pd*sin=120*sin18=47.1daN
gd*sin=4.66*cos18=1.44daN
Mz =
ql 2 p * l 4.43*0.82 114.1*0.8
Mz =
+
=
+
= 23.17 daNm
8
4
8
4
Resistance checking
Mz My
+
Rd
Wy Wz
R = k mod*
d
Rk
Page 30
Combination 1
kmod=0.6 for permanent loads
kmod=0.9 for shor duration loads
R d = 0.6*
400daN / cm2
= 184daN / cm 2
1.3
Combination 2
kmod =
g d *0.8 + pd *0.9
= 0.9
g d * o.8 + pd
Page 31
Tangential efforts
q * l 34.71*0.8
=
= 13.88daN
2
2
q * l 4.43*0.8 + 114.1
= Ty =
=
= 58.82daN
2
2
Tmax = Ty =
Tmax
3 Tmax
fv ,d
2 A
kmod * ksys * f v , k 0.9 *1.0 *3.8
f v ,d =
=
= 26.3daN / cm 2
m
1.3
f v ,k = 3.8 N / mm 2
kmod = 0.9
ksys = 1.0
m = 1.3
Combination 2
3 Tmax
f v .d
2 A
3 58.82
*
= 1.76dan / cm 2
2 50
for Combination 2
f v.d =
0.6*1.0 *3.8
= 17.5dan / cm 2
1.3
kmod = 0.6
k sys = 1.0
f v ,k = 3.8 N / mm 2
m = 1.3
Page 32
3 Tmax
f v.d
2 A
3 13.88
*
= 0.41dan / cm 2
2 50
0.41daN / cm 2 17.5daN / cm 2
Deflection check
It is done with the characteristic values
f max, final = f1 + f 2 + f3 + fi fc f a
f1 -permanent loading
f 2 = f 2,inst (1 + kdef )
f i = 1.5mm
fc = 0
f = f ,inst (1 + kdef )
gk=4.66daN/m
Page 33
Pk=100daN/2=50daN
g kz = 4.66*sin18 = 1.44daN / m
g ky = 4.66*cos18 = 4.43daN / m
pz = 50daN *sin18 = 13.94daN
p y = 50daN cos18 = 48daN
2.53 * 20
= 26.04cm 4
12
2.5* 203
Iz =
= 166.66cm 4
12
Iy =
f1 =
f y2 + f z2 (1 + k def )
4
5 qky * l
5 qkz * l 4
f1 = 1.5* (
*
)+(
*
) = 0.01cm
384 EI z
384 EI z
f1 = 1.25* (
4
5 py * l
5 pz * l 4
*
)+(
*
) = 0.15cm
384 EI z
384 EI z
f1=0.01cm
f2=0.15cm
fi=0,15cm
fc=0
f adm =
l
80
=
= 0.53cm
150 50
Page 34
Computation of Rafters
distance between rafters is 80cm
bc=13cm
hc=15cm
Load Evaluation
Own weight of the rafters,covering,chip wood
g kc = bc * hc * wood = 0.15*0.15*600 = 12daN / m
g * lc = 8.3daN / m 2 *0.80 = 6.7daN / m
g d = 1.35*(12 + 6.7) = 24.75daN / m
Snow load
Sk=105daN/m2
Sd=1.5*105daN/m2
Tributary area=0.8m
Load on 1 rafter
g d *cos = 24.75*cos18 = 23.53daN / m
Mz My
+
Rd
Wy Wz
Page 35
Shear check
q * l 34.71*0.8
=
= 13.88daN
2
2
q * l 4.43*0.8 + 114.1
= Ty =
=
= 58.82daN
2
2
Tmax = Ty =
Tmax
3 Tmax
f v ,d
2 A
kmod * k sys * f v ,k 0.6 *1.0*3.8
f v ,d =
=
= 17.5daN / cm 2
m
1.3
f v ,k = 3.8 N / mm 2
kmod = 0.6
k sys = 1.0
m = 1.3
Tmax =
147.83*3
= 221.7 daN
2
3 Tmax
= 17053daN / m
2 A
17053 < 17500dan / cm 2
Deflection check
fi=1.5mm
fc=0
b * h3 12*153
Iz =
=
= 3375cm 4
12
12
Page 36
5 qk * l 4
f1 = 1.5* (
*
) = 0.7 mm
384 EI z
kdef = 0.5
1 + kdef = 1.5
f1=1.5* (
5
0.23*34
*
) = 0.7 mm
384 9.4*106* *3375*108
f 2 = 1.25* (
5 sk * l 4
*
)
384 EI z
kdef = 0.25
1 + kdef = 1.25
f 2 = 1.25* (
5
0.99*34
*
) = 4mm
384 9.4*106 *3375*108
l
= 15mm
200
= f1 + f 2 = 5.05mm
f adm =
f final
Page 37
Combination 1
Permanent +Snow
Page 38
( g d + s d ) * cos l 2
= 299daN / m
8
( g d + s d ) *sin l 2
Mz =
= 97 daN / m
8
My =
Tmax = Ty =
f v ,k = 3.8 N / mm 2
kmod = 0.6
k sys = 1.0
m = 1.3
5.16daN / cm2 < 17.5daN / cm 2
Check of deflections
fi=15mm
fc=0
b * h3 12*153
Iz =
=
= 3375cm 4
12
12
f1 = 1.5* (
5 qk * l 4
*
) = 7.2mm
384 EI z
Page 39
5 sk * l 4
f 2 = 1.25* (
*
) = 6.25mm
384 EI z
l
= 12.5
200
= f1 + f 2 = 13.45mm
f adm =
f final
Page 40
Snow load
Sk*dp1*dp2=1.05*3*2.5=787daN
Gsk=787daN
Page 41
ef
m in
* Ac
Rd
N = Q
= 184daN / cm
Ac = b * h = 225cm
Rd
b = 15cm
h = 15cm
m ax =
i m in
I m in
A
h * b3
I m in =
= 4219cm 4
12
4219
i m in =
= 4 .3 3 c m
225
l f = H post = 3 .9 m
i m in =
m ax =
i m in
post
0 .2 9 b
ad
ad = 1 5 0
m ax =
390
= 8 9 .6 5
4 .3 5
m ax > 7 5 = >
m in
3100
2
m ax
= 0 .3 6
ef
ef
ef
m in
* Ac
Rd
3600
= 4 4 .2 5 d a N / c m
0 .3 6 * 2 2 5
< Rd = 1 8 4 d a N / cm 2
=
Page 42
= 1.3
R d = 34.8daN / cm 2
Q = 34.8* 225*1.6*1.0
Q = 12528daN = 125.28kN
N = 36kN
Q>N
Page 43
Page 44
Page 45
qk=5 kN/m2
qd=1.5*qk=1.5*5=7.5kN/m2
Cnom=Cmin+Cdev
Cmin=max(Cmin,b ;Cmin,dur ;10mm)
Exposure Class XC1
Structural Class S3(class reduction by 1-member slab geometry)
Cmin,dur=10mm
Cmin,b=max
max=14mm
Cmin,b=14mm=>>Cmin=14mm
Cdev=10mm
Cnom=25mm
d=h-ds
ds=Cnom+/2=32mm
d=150=32=118
fyd=300N/mm2 (S345)
M ED = 7.52kNm
M Ed
7.62*106
= 0.02
= 2 =
bd f cd 1500*1182 *16.67
= 1 1 2 = 0.021
As = bd
f cd
= 2.13cm2
f yd
Page 46
M ED = 13.65kNm
M Ed
13.65*106
= 0.03
= 2 =
bd f cd 1500*1182 *16.67
= 1 1 2 = 0.031
As = bd
f cd
= 3.15cm 2
f yd
M Ed
13.73*106
=
= 0.03
bd 2 f cd 1500*1182 *16.67
= 1 1 2 = 0.031
As = bd
f cd
= 3.15cm 2
f yd
M Ed
6.6*106
=
= 0.017
bd 2 f cd 1500*1182 *16.67
= 1 1 2 = 0.018
As = bd
f cd
= 1.83cm 2
f yd
Page 47
M ED = 7.39kNm
M Ed
6.6*106
= 0.019
= 2 =
bd f cd 1500*1182 *16.67
= 1 1 2 = 0.020
As = bd
f cd
= 2.03cm 2
f yd
Page 48
7.5Slab design
Computation of the concrete covering layer:
Cnom=Cmin+Cdev
Cmin=max(Cmin,b;Cmin,dur;10mm)
max=14mm
Cdev=10mm
Cmin,dur=10mm (S3 class)
=> Cnom=14+10=25mm
ds=Cnom+/2=25+8=31 mm
d=h-ds=200-31=169mm
Constructive rules :
for the reistance reinforcement: smax=min{3*hpl;200mm}=min{600mm,200mm}
=> 200mm
for the repartition reinforcement : smax=min{3.5*hpl; 300mm}=min{700mm;
300mm}=300mm
the minimum for the slab is 6 mm
Page 49
hp
+ 2mm = 22mm
10
fctm
*b * h
fyk
As, min 0.0013* b * d
As, min = 0.26
dx = hp Cnom
= 200 25 6 = 169mm
dy = hp Cnom
= 200 25 10 6 = 159mm
f ctm = 2.6 N / mm 2
fyk = 345 N / mm 2
b = 1000mm
2.6
*1000*169 = 3.31cm 2
345
2.6
*1000*59 = 3.11cm 2
As, min y = 0.26*
345
As, min 0.0013* b * d = 0.0013*1000*159 = 2.06cm 2
As, min x = 0.26*
The slab is reinforced on 2 directions: the global X&Y directions from AxisVM
Page 50
Page 51
Cnom=Cmin+Cdev
Cmin=max(Cmin,b ;Cmin,dur ;10mm)
Exposure Class XC1
Structural Class S3(class reduction by 1-member slab geometry)
Cmin,dur=10mm
Cmin,b=max PC52 max=25mm
Cmin=max(25;20;10)
Cmin=25mm
Cdev=10mm
Cnom=25+10=35mm
Cnom=35mm
ds=Cnom+max/2
ds=50 mm
dss=dsi=50mm
d=h-ds
d=600-50=550mm
Page 52
Span 1
Asi , nec =
Asi , nec =
M ED ,inf
Asi ,min =
fyd (d d ss )
144.6*106
300*(550 50)
Asi ,min =
0.5M ED ,sup
fyd (d d ss )
0.5* 200.82*106
300(550 50)
=> =
200.82*106 1016*300*500
= 0.03
300*550 2 *16.67
M ED ,sup
fyd * hs
200.82 *106
= 13.38cm 2
300 *500
f ctm
f yk
Page 53
Support K
=
xu < xmin
f ctm
f yk
Span 2
Asi , nec =
Asi , nec =
M ED ,inf
fyd (d d ss )
124*106
300*(550 50)
Asi ,min =
Asi ,min =
0.5M ED ,sup
fyd (d d ss )
0.5* 236*106
300(550 50)
M ED ,sup
fyd * hs
233*106
= 15.53cm 2
300*500
f ctm
f yk
Page 55
Support K
=
233*106 942*300*500
300*5502 *16.67
= 0.06
M ED ,sup
fyd * hs
233*106
= 15.53cm 2
300*500
f ctm
f yk
Span 3
Page 56
Asi ,nec =
Asi ,nec =
M ED ,inf
Asi ,min =
fyd (d d ss )
122*106
300*(550 50)
Asi ,min
0.5M ED ,sup
fyd (d d ss )
0.5* 231*106
=
300(550 50)
M ED ,sup
fyd * hs
231*106
= 15.53cm2
300*500
f ctm
f yk
Page 57
Support K
=
240*106
=> Ass =
=
= 16.00cm 2
fyd * hs 300 *500
M ED ,sup
f ctm
f yk
Span 4
Page 58
Asi ,nec =
Asi ,nec =
M ED ,inf
Asi ,min =
fyd (d d ss )
155*106
300*(550 50)
Asi ,min
0.5M ED ,sup
fyd (d d ss )
0.5* 263*106
=
300(550 50)
M ED ,sup
fyd * hs
231*106
= 17.53cm 2
300*500
f ctm
f yk
Page 59
Support K
=
M ED ,sup
fyd * hs
Solution 320+218
240 *106
= 13.93cm 2
300 *500
f ctm
f yk
As=16.48cm2
Ass Asi
1390 1016
* fyd =
*300 = 28.04mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin
Page 60
Span 2
xu =
xmin
Ass Asi
1648 1016
* fyd =
*300 = 47.39mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin
Span 3
xu =
xmin
Ass Asi
1648 942
* fyd =
*300 = 52.93mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin
Span 4
Page 61
xu =
xmin
Ass Asi
1770 1140
* fyd =
*300 = 47.24mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin
xu =
xmin
Ass Asi
1418 1140
* fyd =
*300 = 20.84mm
0.8* b * fcd
0.8*300*16.67
= 2 * dss = 94.1mm =>> xu < xmin
Page 62
lc=L-bcolumn=6m-0.6m=5.4m
Vm =
Span 2
Mdb,1=Mcapinf*RD=142kNm *1.2=184kNm
Mdb,2=Mcapsup *RD=248 kNm *1.2=298kNm
Vm =
Span 3
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Mdb,2=Mcapsup *RD=272 kNm *1.2=327kNm
Vm =
Span 4
Mdb,1=Mcapinf*RD=171kNm *1.2=206kNm
Student:Lucaciu Sorin Andrei
Page 63
Vm =
Span 2
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Mdb,2=Mcapsup *RD=246 kNm *1.2=295kNm
Vm =
Span 3
Mdb,1=Mcapinf*RD=142kNm *1.2=171kNm
Student:Lucaciu Sorin Andrei
Page 64
Span 4
Mdb,1=Mcapinf*RD=142kNm *1.2=206kNm
Mdb,2=Mcapsup *RD=272 kNm *1.2=327kNm
Vm =
Page 65
Page 66
0.18
= 0.12
200
200
= 1+
= 0.008 < 0.02
d
550
= 86kN
k = 1+
VRd ,c
Page 67
x
4.5
=
=> x = 145
173 5.4
y = x + 88 = 145 + 88 = 233 => Vdb ,max 2 = 233kN
Asw
VED
233*1000
mm 2
)nec =
=
= 1.52
s
f ywd * z * ctg 300* 495
mm
Page 68
x
4.5
=
=> x = 145
173 5.4
y = x + 88 = 145 + 90 = 235 => Vdb ,max 2 = 235kN
Asw
VED
235*1000
mm 2
)nec =
=
= 1.58
s
f ywd * z * ctg 300 * 495
mm
Page 69
Span 3
x
4.5
=
=> x = 150
180 5.4
y = x + 88 = 135 + 89 = 239 => Vdb ,max 2 = 239kN
Asw
VED
239 *1000
mm2
=
= 1.60
)nec =
s
f ywd * z * ctg 300 * 495
mm
Page 70
Span 4
x
4.5
=
=> x = 147
176 5.4
y = x + 86 = 147 + 86 = 232 => Vdb ,max 2 = 232kN
Mdb,1=Mcapinf*RD=151kNm *1.2=181.2kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Student:Lucaciu Sorin Andrei
Page 71
Vm =
Span 2
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 3
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 4
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Page 72
Span 5
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 6
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 7
Mdb,1=Mcapinf*RD=151kNm *1.2=181kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 8
Page 73
Mdb,1=Mcapinf*RD=137kNm *1.2=164.4kNm
Mdb,2=Mcapsup *RD=103kNm *1.2=123.6kNm
Vm =
Span 2
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=151kNm *1.2=181.2kNm
Vm =
Page 74
Span 3
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =
Span 4
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =
Span 5
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =
Span 6
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Page 75
Span 7
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=151kNm *1.2=181kNm
Vm =
Span 8
Mdb,1=Mcapinf*RD=103kNm *1.2=123.6kNm
Mdb,2=Mcapsup *RD=137kNm *1.2=164.4kNm
Vm =
Page 76
0.18
= 0.12
200
200
= 1+
= 1.6 < 2
d
450
= 64kN
k = 1+
VRd ,c
Page 77
x
4.4 0.85
=
=> x = 143.2
177.5
4.4
y = x + 88 = 143.2 + 3.5 = 146.7 => Vdb ,max 2 = 148kN
Asw
VED
147 *1000
mm 2
=
= 1.44
(
) nec =
s
f ywd * z * ctg 300* 495
mm
212 Asw = 2.26cm 2
Asw
226
=
= 156mm
Asw
1.44
(
)nec
s
A
226
mm 2
mm 2
( sw )eff =
= 1.5
> 1.44
s
150
mm
mm
n *A
2* 2.26*100
w = e sw =
= 0.012
sw*b
150 * 250
sw =
Page 78
7.6Reinforcement of columns
N ED
1690*103
=
= 0.26 < 0.5
b * h * f cd 600*600*16.67
Bending moment diagrams of the transversal girder considering the two direction
of the seismic activity
Page 79
M d* = Rd * M EDC (
M
M
M
M
M
M
Rd
= 1468kNm
Ed
= 1587kNm
Rd
Rd
Ed
Rd=1.3(DCH)
= 1.08
Ed
M d* = 1.3*1.08* M EDC
M d* = 1.4* M EDC
M
M
M
M
M
M
Rd
= 1583kNm
Ed
= 1477kNm
Rd
Rd
Ed
Rd=1.3(DCH
= 1.07
Ed
M d* = 1.3*1.07 * M EDC
M d* = 1.39* M EDC
Md* diagram
Student:Lucaciu Sorin Andrei
Page 80
Point I
min = 0.01
min =
Asc ,total
M d* N ED (0.5* h 0.4* x)
= 9.74cm 2
f yd (0.5* h ds )
M d* = 193.2kNm
N ED = 1083kN
Point II
Page 81
min = 0.01
min =
Asc ,total
b*h
N ED
1052*103
x=
=
= 131.47 mm
0.8* b * f cd 0.8*600*600
xmin = 2 * dss = 1.882*50 = 94.1mm
x > xmin => As ,total =
M d* N ED (0.5* h 0.4* x)
= 16.70cm 2
f yd (0.5* h ds )
M d* = 135kNm
N ED = 1052kN
f yd = 300 N / mm 2
Point III
min = 0.01
min =
Asc ,total
b*h
N ED
650*103
x=
=
= 81.23mm
0.8* b * f cd 0.8*600*600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total
M d* N ED (0.5* h ds )
=
= 4.6cm 2
f yd (0.5* h ds )
M d* = 128kNm
N ED = 650kN
f yd = 300 N / mm 2
Page 82
Point IV
min = 0.01
min =
Asc ,total
b*h
650 *103
N ED
=
= 81.23mm
x=
0.8* b * f cd 0.8* 600 *600
xmin = 2 * dss = 1.882 *50 = 94.1mm
M d* N ED (0.5* h ds )
=
= 1.16cm 2
f yd (0.5* h ds )
M d* = 146kNm
N ED = 619kN
f yd = 300 N / mm 2
Point V
min = 0.01
min =
Asc ,total
b*h
N ED
650 *103
x=
=
= 27.49mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
M d* N ED (0.5* h ds )
=
= 6.25cm 2
f yd (0.5* h ds )
M d* = 47 kNm
N ED = 220kN
f yd = 300 N / mm 2
Page 83
Point VI
min = 0.01
min =
Asc ,total
b*h
189 *103
N ED
=
= 23.62mm
x=
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
M d* N ED (0.5* h ds )
=
= 9.72cm 2
f yd (0.5* h ds )
M d* = 73kNm
N ED = 189kN
f yd = 300 N / mm 2
Point II
N Ed = 1052kN
x = 131.47 mm
x > xmin =>> M Rd = N ED (0.5h 0.4 x ) + As.total * f yd (0.5h ds )
M Rd = 530.2kNm
Student:Lucaciu Sorin Andrei
Page 84
Point III
N Ed = 650kN
x = 81.23mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 432.5kNm
Point IV
N Ed = 620kN
x = 77.35mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 425kNm
Point IV
N Ed = 220kN
x = 27.49mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 325kNm
Point IV
N Ed = 189kN
x = 23.69mm
x < xmin =>> M Rd = ( N ED + As.total * f yd )(0.5h ds )
M Rd = 318kNm
Page 85
M
M
M
M
M
M
Rd
= 1948kNm
Ed
= 1636kNm
Rd
Rd
Ed
Rd=1.3(DCH)
= 1.2
Ed
Page 86
M d* = 1.3*1.2* M EDC
M d* = 1.56* M EDC
M
M
M
M
M
M
Rd
= 1948kNm
Ed
= 1646kNm
Rd
Rd
Ed
Rd=1.3(DCH)
= 1.2
Ed
M d* = 1.3*1.2* M EDC
M d* = 1.56* M EDC
Md* diagram
Page 87
Point I
min = 0.01
min =
Asc ,total
b*h
1083*103
N ED
=
= 135.54
x=
0.8* b * f cd 0.8*600*600
M d* N ED (0.5* h 0.4* x )
= 6.56cm 2
f yd (0.5* h ds )
M d* = 217 kNm
N ED = 1083kN
Point II
min = 0.01
min =
Asc ,total
b*h
N ED
1083*103
x=
=
= 131.54
0.8* b * f cd 0.8* 600* 600
M d* N ED (0.5* h 0.4* x )
=
= 14.43cm 2
f yd (0.5* h ds )
M d* = 152kNm
N ED = 1052kN
Page 88
Point III
min = 0.01
min =
Asc ,total
b*h
N ED
650 *103
x=
=
= 81.23mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882*50 = 94.1mm
x < xmin => As ,total =
M d* N ED (0.5* h ds )
= 24.66cm 2
f yd (0.5* h ds )
M d* = 144kNm
N ED = 650kN
f yd = 300 N / mm 2
Point IV
min = 0.01
min =
Asc ,total
b*h
N ED
650 *103
x=
=
= 77.35mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total =
M d* N ED (0.5* h ds )
= 1.10cm 2
f yd (0.5* h ds )
M d* = 53kNm
N ED = 220kN
f yd = 300 N / mm 2
Page 89
Point V
min = 0.01
min =
Asc ,total
b*h
650 *103
N ED
=
= 27.49mm
x=
0.8* b * f cd 0.8* 600 *600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total
M d* N ED (0.5* h ds )
=
= 0.26cm 2
f yd (0.5* h ds )
M d* = 53kNm
N ED = 220kN
f yd = 300 N / mm 2
Point VI
min = 0.01
min =
Asc ,total
b*h
N ED
650 *103
x=
=
= 23.7 mm
0.8* b * f cd 0.8* 600* 600
xmin = 2 * dss = 1.882 *50 = 94.1mm
x < xmin => As ,total =
M d* N ED (0.5* h ds )
= 4.63cm 2
f yd (0.5* h ds )
M d* = 82kNm
N ED = 189kN
f yd = 300 N / mm 2
Page 90
M
M
Rd 2
Rc 2
M
M
M
M
Rb 2
= 390kNm
Rc 2
= 963kNm
Rb 2
= 0.40
Rc 2
M dc 2 = 1.3*531*0.40 = 277kNm
Vdc =
Groundfloor column
Mdc2=277kNm
Page 91
M
M
M
M
Rb
= 390kNm
Rc
Rb 2
= 0.52
Rc 2
Vdc =
M dc 2 + M dc 3 264 + 277
=
= 187 kN
lc
2.9
Groundfloor column
Mdc2=277kNm
M dc3 = 264kNm
M dc 2 = 1.2*318 = 382kNm
Vdc =
M dc 2 + M dc 3 264 + 318
=
= 200kN
lc
2.9
Page 92
Point A
(
Asw
V
304 *1000
mm 2
) nec = ED =
= 2.00
s
f ywd *z 309* 495
mm
f ywd = 309 N / mm 2
z = 0.9 * d = 495mm
d = h ds = 600 50 = 550mm
lcr=max{1.5hc;lcl/6;600mm}
lcr=max{90;54;60}
lcr=90cm
lcl/hc=2.9/0.6=4.83>3
sw,max<min{b0/3;125mm;7dbl}
(
Asw
VED
304*1000
mm 2
) nec =
=
= 2.00
s
f ywd * z * ctg 309 * 495
mm
min = 0.005
Student:Lucaciu Sorin Andrei
b0=hcol-2*cnom
b0/3=197mm
7dbl=7*22=154
mm
sw,max<{197;12
5;154}
Page 93
sw,max<125mm
Asw
VED
187 *1000
mm 2
=
= 1.22
) nec =
s
f ywd * z * ctg 309* 495
mm
Asw
mm2
mm2
314
= 2.61
> 1.22
)eff =
s
mm
mm
120
ne * Asw 4*3.14*100
w =
=
= 0.04
sw*b
120* 250
min = 0.005
0.04 > 0.005
Asw
VED
200 *1000
mm 2
)nec =
=
= 1.30
s
f ywd * z * ctg 309* 495
mm
Point C
Asw
314
=
= 230mm
Asw
(
)nec 1.30
s
=>> sw 12cm
sw =
Asw
314
mm 2
mm 2
)eff =
= 2.61
> 1.30
s
120
mm
mm
n *A
4*3.14 *100
w = e sw =
= 0.04
sw*b
120* 250
Page 94
hb
600
Vjhd =
*877 = 877 kN
hc
600
Page 95
Vd
* bj * hc * fcd
25
) = 0.54
250
643*103
Ned
=
= 0.16
=
b * d * fcd 600*600*16.67
bj = min(bc;(bw + 0.5hc))
bj = min(600; 600)
= 0.6(1
bj = 600mm
Vjhd 0.54 1
0.16
*600*600*16.67
0.54
Vjhd 2718kN
877 < 2718kN ok
644*103
= 0.11
600*600*16.67
0.8*(1648 + 942) *300(1 0.8*0.11)
Ash nec =
= 18.34cm 2
309
d =
Page 96
h jw = hw d s1 d s 2 = 600 57 55 = 488mm
2
508
Asv *1844*
3
488
2
Asv 12.79cm
Asv = 19.00cm 2
2.Second case when the seismic load has the direction from right to left
Page 97
hb
600
Vjhd =
*877 = 877 kN
hc
600
Vd
* bj * hc * fcd
25
) = 0.54
250
Ned
649*103
=
=
= 0.10
b * d * fcd 600*600*16.67
bj = min(bc;(bw + 0.5hc))
= 0.6(1
bj = min(600; 600)
bj = 600mm
Vjhd 0.54 1
0.10
*600*600*16.67
0.54
Vjhd 2925kN
877 < 2925kN ok
Page 98
644*103
= 0.11
600*600*16.67
0.8*(1648 + 942) *300(1 0.8*0.11)
= 18.34cm 2
Ash nec =
309
d =
Page 99
Tx
Y
hc
H
Hb
On the location where the geotechnical study was done is designed a building with 4
spans and 8 bays. The columns section is 60x60 cm: .Soil characteristics are identified in bore
F1.
The building has underground level,ground level and a floor level.
Forces acting on the column are:
N= 1700 kN
My =138 kNm
Vz=67 kN
Mz=131 kNm
Vy=60 KN
The foundation soil has the following characteristics:
N y = 0.4
c = 48kN / m 2
= 12o
, where
= 18.5kN / m 3
Nq = 3
N c = 9.38
Page 100
The conditions for determining the minimum foundation depth are: Foundation depth;
Df =3.0 m
B=2.4 m
L=2.4 m
bc=1.4 m
lc=1.4 m
Page 101
We have fine soils, with high plasticity index (Ip >20% ; e<1.1) so it results that:
Ic =
W l - W 46.6% - 26.5%
=
= 0.72
Ip
27.6%
CD = ( D 2)
CD = 18.5*0.4
CD = 18.5
=> Pconv=279+19.53+18.5=311 kPa
pef max<1.6* pconv
pef max < 497.11 kN/m2
Page 102
Ntot 6 Mx
6M
2
L * B L * B L * B2
My
138
=
= 0.07 m
N+ Gf 1690 +107.32135
ey =
Mz
131
=
= 0.07 m
N+ Gf 1690 + 135
e12 e 22 1
+ 2 <
L2
B
9
0.07 2 0.082
1
+
= 0.17 < (0.11)
2
2
2.4
2.4
9
e1=ex e2=ey
Pef1=
N+ Gf
6 ey 6 ex 1825
6*0.07
(1+
+
)=
(1+ 2*
) = 428 k N / m 2
2
B* L
L
B
2.4
2.4 2
Pef2=
N+ Gf
6 ey 6 ex 1825
6*0.07 6*0.07
(1+
)=
(1+
) = 317 k N / m 2
2
B* L
L
B
2.4
2.4
2.4
Pef3=
N+ Gf
6 ey 6 ex 1825
6 *0.07 6*0.07
(1
+
)=
(1
+
) = 317 k N / m 2
2
B* L
L
B
2.4
2.4
2.4
Pef4=
N+ Gf
6 ey 6 ex
(1
) = 206 k N / m 2
B* L
L
B
Page 103
Calculation of pcritical :
b =18.5 kn/m3
B;L-reduced dimmensions of the foundation
B=B-2*e2=2.4-2*0.07=2.26 m
L=L-2*e1=2.4-2*0.07=2..26 m
Ny,Nq,Nc- non-dimmensional coefficents of bearing capacity
=12 => by linear interpolation
Ny=0.4
Nq=3
Nc=9.38
q- overweight that acts on the foundation level
q=1.7*18.5=31.45 kn/m2
c-the calculus value for cohesion
c=48 kn/m2
B/L=2.2/2.2=1 => square shape
c,q=1.3
y=0.6
Pcr= 18.5*2.26*0.4*0.6+3*1.3*31.45+48*9.38*1.3=718 kn/m2
Student:Lucaciu Sorin Andrei
Page 104
p ef med =
p ef med< mc*Pcr
lc
ly
bs
bc
ls
pmed
lx
p2
p1
p0
N01=N+Gpillow=1690+1.4*1.4*0.5*25=1715 kN
M01y=My+Vz*hc=138+67*0.5=171.5 kn/m2
M01z=Mz+Vy*hc=131+60*0.5=161 kn/m2
ex=
M 01 y 171.5
=
= 0.1m
N 01 1715.5
ey=
M 01x
161
=
= 0.09m
N 01 1714.5
1=
N 01
6ex 1714.5
6 *0.1
(1 +
)=
(1 +
) = 1250kn / m 2
2
lc * bc
lc
1.4
1.4
Page 105
1<fcd(13333 kN/m2)
2<fctk0.005 C20/25 => fctk0.005=1.5 N/m2
2=
N 01
6ex 1714.5
6* 0.1
(1
)=
(1
) = 656kn / m 2
2
lc * bc
lc
1.4
1.4
N 01
6ey 1714.5
6* 0.09
(1 +
)=
(1 +
) = 1212kn / m 2
2
lc * bc
lc
1.4
1.4
3<fcd(13333 kN/m2)
4<fctk0.005
4=
N 01
6ey 1714.5
6 *0.09
(1
)=
(1
) = 55kn / m 2
2
lc * bc
lc
1.4
1.4
1 2
lc
(lc lx ) + 2 =
1250 656
(1.4 0.4) + 656 = 658kn / m 2
1.4
lx=(lc-bst)/2=0.4m
ly=(bc-bst)/2=0.4m
y0=
3 4
x med =
y med =
lc
(bc ly ) + 4 =
1+ 2
2
3+ 4
Mx= [ x0*
1212 543
(1.4 0.4) + 543 = 1021kn / m 2
1.4
lx2
lx2
0.42
0.42
+ ( 1 x0)* ] = 1.4*[658*
+ (1250 658)*
] = 117.8Knm
2
3
2
3
Page 106
Mx
117.8*106
=
= 9.86cm 2
Aax =
0.875* h0 x * fyd 0.875* 455*300
solution 714, As=10.78 cm2
Aay =
My
98.24*106
=
= 8.60cm 2
0.875* h0 y * fyd 0.875*435*300
Reinforcement percentage :
px =
Aax
1078
=
= 0.16%
bc * h0 x 1400* 455
py =
924
Aay
=
= 0.13%
lc * h0 y 1400 * 435
Spacing of bars
bc-2*(Cnom+/2)=(140-8.4)/6=21cm
Student:Lucaciu Sorin Andrei
Page 107
=> 714/21
lc-2*(Cnom+/2)=(140-8.4)/6=21 cm
=>614/21
Med
35.86*106
=
= 0.02
b * h2 * fcd 300*5552 i13.33
= 1 1 2* = 1 1 2*0.02 = 0.03
Ao = * b * h
fcd
13.33
= 0.03*300*555
= 2.21cm2
fyd
300
Page 108
d=h-ds=50-(Cnom+/2)=55.5 cm
fcd=20/1.5=13.33
0.5
fctm
2.2
=> 0.5*
fyk
345
>0.0027
solution 316 As=6.03 cm2 for both bottom and top reinforcement
w =
Ass
603
=
= 0.006 > 0.003
b * d 300*555
stirrups: min=6 mm
=>=8 mm
w =
n * Asw
2*50.3
=
= 0.0016
sw * b
400*300
0.08 20
= 0.001 => ok
345
=>8/40 stirrups
Page 109
Page 110
Page 111
Page 112
Page 113
8.2Indicatori tehnico-economici
1.Coeficientul de aplatizare
Ca
(e * d )
Dex * nr.max demunc
5573
= 0.73 > 0.65
360* 21
Activitate
Pregatirea_terenului
Sapaturi
Infrastructura
subsol
parter
etaj
sarpanta
d
1
1
30
33
33
33
16
e
4
2
13
20
20
20
8
VM
4
2
390
660
660
660
128
Scara_interioara
zidarie_subsol
14
126
zidarie_parter
14
zidarie_etaj
14
9
9
126
126
tencuieli inte
46
18
828
tencuieli_ext
13
tamplarie
13
14
11
182
143
zugraveli_int
35
pardoseli_reci
28
224
pardoseli_calde
20
160
zugraveli_ext
10
tinichigerie
10
5
100
15
4573
Page 114
Armatura
Cant 163070kg
=
= 57 kg / m 2
Sd
2880mp
Cant 163070
Cs =
=
= 0.054buc / lei
I
2995668
Cs =
Caramida
Cant 28088kg
=
= 9.75buc / m 2
Sd
2880mp
Cant 28088kg
Cs =
=
= 0.009buc / lei
I
2995668
Cs =
Page 115
4.Aria construita
S=960 m2
8.Indicii de cost
Ic =
I 2995668
=
= 1040lei / m 2 = 236 Euro / m 2
S
2880
9.Productivitatea muncii
Pm = (C + M )
Fta
Fttm
C + M = 2883244
Fta = 1784ore / an
Fttm = 31725[oreom]
Pm = 162134lei / oman
Page 116
Page 117
Page 118
Page 119
n
Slab over last floor:Bottom reinforcement on X direction
Page 120
Stair reinforcement
Ramp 1
Ramp 2
Page 121
Transversal girder
Longitudinal girder
Page 122
Page 123
Page 124
Page 125
Page 126
Page 127