COST ESTIMATE FOR A SINGLE BASE - 1.

5 KW Plant

Description

Quantity

cost

SUM
120,000.00

$200,000.00
$600,000.00

SUM

$30,000.00

1
4
4

10000
3000
6000

$10,000.00
$12,000.00
$24,000.00

PRIMER , PAINT , gall.

3000

$3,000.00

Base for Muffler , cubic yard conc


Labourer x2
welder

2
5
4

26000
6400
4500

$52,000.00
$32,000.00
$18,000.00

SITE PREPARATION
40 FT OF W12X10
TRANSPORTATION

Total

PLANTS
CRANE TRUCK (DAYS)
WELDING PLANT (DAYS)
OTHER HAND TOOLS(DAYS)

sub total

$981,000.00

Preliminaries @ 12%

$117,720.00

Mark up @ 25 %

$274,680.00
Gand Total

Cost for Three bases


Note: Estimate is based on the assumption that the area is undistrurbed

$1,373,400.00

$3,720,200.00

ENGINEER'S ESTIMATE FOR


THREE ABOVEGROUND TANKS
AND BUND WALL CONTAINMENT
DESCRIPTION
TO SUPPLY THREE ABOVE GROUND SINGLE WALL STEEL TANKS TOTAL CAPACITY OF THIRTY THOUSAND
GALLONS.
INSTALL THREE ABOVE GROUND TANKS WITHING BUND WALL
``
CONSTRUCT BUND STRUCTURE COMPRISES OF 200MM BASE 1:2:3 CONCRETE MIXTURE AND
12MM MILD STEEEL BARS 200 CRS BOTHWAY ; 150 MMM THCK BLOCKWALL ALL POCKETS FILLED
WITH 1:3:6 CONCRETE MIX COMPLETE 12MM BAR AT 200 MM CRS VERTICAL AND 10 MM BARS 600 CRS
HORIZONTAL , STEEL FLOATED 12 MM CEMENT SAND RENDERING FINISH TO INTERIOR OF WALL AND
FLOOR SLAB, WOOD FLOAT FINISH TO THE EXTERNAL WALL; 150 x150 MM REINF. CONC. BEAM ON
TOP OF BLOCKWALL, INCLUDING ALLOCATION FOR EXCAVATION, DISPOSAL AND FORMWORKS

DETERMINATION OF THE BUND WALL CAPACITY


TOTAL TANK CAPACITY :

30000 GAL

CAPACITY OF BUND AREA

33000 GAL

CONVERTING TO GAL TO CUBIC FEET

DIVIDE BY

VOLUME

4412 CUB. FT

AREA OF BUND AREA 40' x44'

1760 SQ. FT

HEIGHT

3 FT

COST FOR TANKS X3


CIF
DUTIES 23%
SUB-TOTAL

7.48

BASED ON COST RECEIVED FROM RUBIS - Ja. Ltd.. US$19,500.00 CIF


$58,500.00 USD
$16,380.00 USD
$74,880.00 USD

EXCHANGE RATE : 113

$8,461,440.00

COST FOR BUND AREAS


BLOCKS
FILL VOID WITH CONC 1:3:6
REBARS, KG
RENDERING, SQ. YD
CONCRETE SLAB, CUBIC YD
MISC
SUB-TOTAL

TOTAL

QUANTITYRATE
600
150
1699
112
44

COST
150
180
250
2500
29000

$90,000.00
$27,000.00
$424,750.00
$280,000.00
$1,276,000.00
$200,000.00
$2,297,750.00

$10,759,190.00

STIMATE FOR

GROUND TANKS

LL CONTAINMENT

AL CAPACITY OF THIRTY THOUSAND

ONCRETE MIXTURE AND


KWALL ALL POCKETS FILLED
RTICAL AND 10 MM BARS 600 CRS
NISH TO INTERIOR OF WALL AND
0 MM REINF. CONC. BEAM ON
POSAL AND FORMWORKS

FROM RUBIS - Ja. Ltd.. US$19,500.00 CIF

EXCHANGE RATE : 113

.25 CUB. FT / BLOCK


112 X 4.5