FOREST PARK BANSRA GALI MURREE

BRIEF OF PROJECT:
Approved Cost
154.107 Million
Expenditure (up to 30.6.2015)
90.255 Million
Allocation of funds (in ADP 2015-16)
Nil
Fund Released (During 2015-16)

Nil

Funds Required for Clearance of liabilities


(i/c Cost for variation in scope as per site requirement)
80 Miliion
Mode of Travel to Murree
Chair Lift/Road
Distance to GPO Chowk Murree by Road
8 Km
Land Ownership
Department
Altitude of site

Forest

5725 ft

Snow Clearance
Services to be provided
By Punjab
Highway
Department on request

SCOPE OF WORK (TERRACE -1)


Area (Approx.)

4 Kanals

FACILITIES
Parking Space
Control Room

64 Vehicles
155 sft

Guard Room
Tuck Shop
Toilet Block (9 X 17.75)
2 for Gents
Gazebos (64 Sft each)
Affected Area

50 sft
86 sft
1 no for Ladies and
3 Nos.

63 ft X 27 ft area (for parking of 9 Nos. vehicles) has been affected due


to landslide which is under observation after execution of remedial
measures.

SCOPE OF WORK (TERRACE -2)


Area (Approx.)

1.5 Kanals

FACILITIES

Parking Capacity
Toilet Block
Coffee Shop
Guard room
Gazebos (64 Sft each)

21 Cars
1 for Ladies and 1 for Gents
128 sft
50 sft
3 Nos.

GENERAL FACILITIES
Entry Booth
Exit Booth
Control Room
Sign Boards
Display Boards
parking availability
Water Tank
Gallons

50 sft
50 sft

155 sft
Showing
2500
Source of water Natural
Springs with alternate
provision of lifting of water
from bouzer
Septic tank

Sewerage System
with allied sewer line
Transformer
Generator
Greaves (France)
Approach from main Rawalpindi 450 Rft
Murree Kashmir Road
800 Rft

100 KVA
60 KVA,
Entry Road
Exit Road

Common Road
Street Lights with poles
IT Systems
Ticketing system
Dispensers, Barrier, Signal,

250 Rft
31 No. LEDs

2 Nos. RFID
2 Nos.

Computers & 1 Printer


Surveillance system
Cameras

6 Nos. CCTV
(2 Nos. PTZ Dome & 4 Nos. IP)

Parking Guidance system


Gateway,
concentrator,

Sensors, Repeaters,
Server, data
Display

Boards & Commissioning kit