BRIEF OF PROJECT:
Approved Cost
154.107 Million
Expenditure (up to 30.6.2015)
90.255 Million
Allocation of funds (in ADP 2015-16)
Nil
Fund Released (During 2015-16)
Nil
Forest
5725 ft
Snow Clearance
Services to be provided
By Punjab
Highway
Department on request
4 Kanals
FACILITIES
Parking Space
Control Room
64 Vehicles
155 sft
Guard Room
Tuck Shop
Toilet Block (9 X 17.75)
2 for Gents
Gazebos (64 Sft each)
Affected Area
50 sft
86 sft
1 no for Ladies and
3 Nos.
1.5 Kanals
FACILITIES
Parking Capacity
Toilet Block
Coffee Shop
Guard room
Gazebos (64 Sft each)
21 Cars
1 for Ladies and 1 for Gents
128 sft
50 sft
3 Nos.
GENERAL FACILITIES
Entry Booth
Exit Booth
Control Room
Sign Boards
Display Boards
parking availability
Water Tank
Gallons
50 sft
50 sft
155 sft
Showing
2500
Source of water Natural
Springs with alternate
provision of lifting of water
from bouzer
Septic tank
Sewerage System
with allied sewer line
Transformer
Generator
Greaves (France)
Approach from main Rawalpindi 450 Rft
Murree Kashmir Road
800 Rft
100 KVA
60 KVA,
Entry Road
Exit Road
Common Road
Street Lights with poles
IT Systems
Ticketing system
Dispensers, Barrier, Signal,
250 Rft
31 No. LEDs
2 Nos. RFID
2 Nos.
6 Nos. CCTV
(2 Nos. PTZ Dome & 4 Nos. IP)
Sensors, Repeaters,
Server, data
Display