Professional Documents
Culture Documents
Parameters: T (MTHS) T (HRS) Q (STB/dy) Q (STB) Cumm Q % Prod
Parameters: T (MTHS) T (HRS) Q (STB/dy) Q (STB) Cumm Q % Prod
= 5651
,
= 8.2
= 3500
= 0.9
= 1.40 10 ,
= 53
= 3.00 10
= 2.80 10 ,
= 1.7
= 1.29 10
= 1.1,
= 0.19
= 0.34,
= 28,
= 0.328
Problem 1
For a transient flow condition;
(
=
162.6
=
log + log
)
3.23 + 0.87
t (hrs)
q (STB/dy)
Q (STB)
Cumm Q
% Prod
720
446.2452
13,387.36
13,387.36
9.17
1.5
1080
435.1239
6,526.86
19,914.21
13.64
1440
427.5635
6,413.45
26,327.67
18.03
2.5
1800
421.8778
6,328.17
32,655.83
22.36
2160
417.3432
6,260.15
38,915.98
26.65
3.5
2520
413.5847
6,203.77
45,119.75
30.89
2880
410.3832
6,155.75
51,275.50
35.11
4.5
3240
407.6001
6,114.00
57,389.50
39.29
3600
405.1424
6,077.14
63,466.64
43.46
5.5
3960
402.9445
6,044.17
69,510.81
47.59
4320
400.9587
6,014.38
75,525.19
51.71
6.5
4680
399.1491
5,987.24
81,512.42
55.81
5040
397.4882
5,962.32
87,474.75
59.89
7.5
5400
395.9543
5,939.32
93,414.06
63.96
5760
394.5302
5,917.95
99,332.01
68.01
8.5
6120
393.2017
5,898.03
105,230.04
72.05
6480
391.9573
5,879.36
111,109.40
76.08
9.5
6840
390.7875
5,861.81
116,971.21
80.09
10
7200
389.6841
5,845.26
122,816.47
84.09