DAILY ACTIVITY RE

Regular Working H
NO

Tanggal

Nama
Saut Gabe. B
Subhan Lenggawa

Kamis/16 April 2015


Dedy Rahmad

Dedy Rahmad
2

Jum,at/ 17 April 2015


Saut Gabe. B

Senin / 20 April 2015

Dedy Rahmad

Selasa / 21 April 2015

Dedy Rahmad

Rabu / 22 April 2015

Dedy Rahmad

Rabu / 06 Mei 2015

Dedy Rahmad

Rabu / 06 Mei 2015

Dedy Rahmad

DAILY ACTIVITY REPORT

Regular Working Hours


Activity
Aktifiatas
Safety Induction PT....
Cek Eye Wash & Shower di PGS

Status
Selesai
Belum selesi

Menemani PT MPI
Inspeksi LK3 lokasi Shore tank belawan, Raw oil tank,
Boiller basuki, Cooling tower utility, Intermediet tank

Selesai

Pengecekan kebisingan area # 1000 Hydrant Plant Air


compressor & High Steam Boiller

Selesai

Joint Tool box meeting pada lokasi warehouse. C

Selesai

Safety Induction
Joint Tool box meeting pada lokasi warehouse. C
Safety Talk Utility
Safety Induction CV. Mitsalindo 3 orang
Summary weekly Permit
Meeting kordinasi dengan pihak scurity
Safety Induction CV. Kharisma 3 orang
Pengecekan kebisingan area # 1000

Selesai
Selesai
Selesai
Belum selesi
Selesai
Selesai
Selesai

Inspeksi LK3 pada lokasi Product tank, OS Warehouse A/B,


Waste Bin, Warehouse B, C & D, Beading Plant Existing LT,
1 s/d &

Selesai

Buat laporan hasil inspeksi LK3

Selesai

Inspeksi equipment pihak ke-3 PT. Kharisma Guna Lestari


yang akan masuk kelokasi kerja PT. Socimas

Selesai

Safety inspection pagi hari


Summary weekly Permit
Pembuatan jalur pillar hydrant PGS
Pengecekan Permit coal boiller, pipe rack existing, Power
plant.
Pengecekan equipment contractor.
Pembuatan d'sign Safty Pass.
Investigasi kebakaran & kecelakaan kerja
Safety inspection pagi hari
Inspeksi LK3 Raw Oil Tank, Coal Boiller Existing, Cooling
Tower Utility, Intermidiet Tank, Pump House, RWTP

Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai
Selesai

Check Permit Hydrogenasi PGS, Calorick Plant, RWTP.

Selesai

Pengecekan equipment contractor.


Safety Induction PT. Beta Pramesti.
Pembuatan Safety Pass

Selesai
Selesai
Selesai

Power plant

Keterangan

Report menyusul
Report menyusul
Joint tool box meeting dilakukan setiap jum'at
diwarehouse. C
Joint tool box meeting dilakukan setiap jum'at
diwarehouse. C

Report sudah di emailkan kepada Pak Erwinsyah


Equipment yang dicek dinyatakan aman dan dapat
digunakan dilokasi PT. Socimas.
Sudah dikirimkan

Sudah dikirimkan

Selesai
Selesai
Selesai
Selesai