ANALISIS DE COSTOS

MATERIAL
CEMENTO
PIEDRA CHANCADA 1/4
AGREGADO FINO
ACERO CORRUGADO 1/4
ALAMBRE
LISTONES
TRIPLAY
CLAVOS

ELEMENTO
AGUA
CEMENTO
PIEDRA
ARENA
TOTAL
ELEMENTO
AGUA
CEMENTO
PIEDRA
ARENA
TOTAL

UND.
Kg
m3
m3
m
Kg
m
m2
Kg

CANTIDAD P.U
0.47082353
0.05
0.04
0.234888
1
15.2
1.47
0.5
TOTAL

20
80
60
6.5
3.5
20

PESO
11.90
20.29
43.11
49.52
124.82
VOLUMEN
0.012 m3
0.007 m3
0.016 m3
0.019 m3
0.053 m3

PARCIAL
9.41647058
4
2.4
1.526772
3.5
0 *Dividir entre long. Real de liston
29.4 *Dividir entre AREA Real de TRIPLAY
0
S/. 50.24

kg.
kg.
kg.
kg.
kg.

0.5 bolsas

FIERROS

ESTRIBOS:
VIGA
COLUMNA

NUMERO

MEDIDA m TOTAL m
17
0.38
6.46
12
0.28
3.36
9.82

LONG-TRANS:
VIGA
COLUMNA

NUMERO

MEDIDA m TOTAL m
4
1.76
7.04
8
0.82
6.56
13.6

TOTAL

23.42

MADERA
LISTONES
CANTIDAD

LARGO m
PARCIAL
4
1.65
4
0.65
4
0.5
4
0.4
12
0.2
TOTAL

6.6
2.6
2
1.6
2.4
15.2

TRIPLAY
ANCHO m

LARGO m
CANTIDAD
0.2
0.65
0.2
0.5
0.1
0.65
0.15
1.5
0.2
1.5
TOTAL

PARCIAL m2
2
0.26
2
0.2
4
0.26
2
0.45
1
0.3

1.47