API 580 Exam Questions
API 580 Exam Questions
28. The RBI process is focused on maintaining the mechanical integrity of pressure
equipment items.
29. Probability of failure of specific consequence is depending on. 1) Magnitude of event
2) consequence of failure.
30. The main production consequences for RBI are financial.
31. The data quality has a direct relation to the relative accuracy of the RBI analysis.
32. Risk is the combination of occurrence of event and its consequence.
33. The results of inspections, changes in process conditions and implementation of
maintenance practices can all have significant effects on risks, and therefore the
inspection plan and can trigger the need to perform a reassessment.
34. Reassessment of risk is performed except rerating.
35. The risk remaining after risk mitigation is called residual risk.
36. The risk prior to mitigation activities is unmitigated risk.
37. A QRA deals with total risk, not just risk associated with equipment damage.
38. Continuum of approaches