You are on page 1of 4

TUGAS 1

SI 3121 Struktur Beton


Dosen

: Prof.Bambang Budiono,Ir, M.E.,Ph.D

Disusun oleh :
Nama

: Windya Wijaya

Nim

: 15013024

Program Studi Teknik Sipil


Fakultas Teknik Sipil dan Lingkungan
Institut Teknologi Bandung
2015
1.

Windya Wijaya
15013024

A s =8 509 mm =4072 mm

A s f y =0.85 f c ' a b
A s f y =0.85 f c ' 1 c b
4072 400=0.85 27.5 0.85 c 300

c=273.26 mm
y=

fy
400
=
=0.002
E s 200,000
s=

dc
452.5273.26
3
c=
0.003=1.97 10 < y
c
273.26

Windya Wijaya
15013024
2.

A s =3 509 mm =1527 mm

A s f y =0.85 f c ' a b
A s f y =0.85 f c ' 1 c b
1527 400=0.85 27.5 0.85 c 300

c=102.47 mm
y=

fy
400
=
=0.002
E s 200,000
s=

dc
452.5102.47
2
c=
0.003=1.02 10 > y
c
102.47

3.

Windya Wijaya
15013024

A s =6 509 mm2=3054 mm2


'

A s f y =0.85 f c a b
A s f y =0.85 f c ' 1 c b
3054 400=0.85 27.5 0.85 c 300

c=204.94 mm
y=

fy
400
=
=0.002
E s 200,000
s=

dc
452.5204.94
c=
0.003=3.62 103> y
c
204.94

You might also like