Philippe Vion - Emmanuel Bouchon

Prestressed concrete bridges built


by the cantilever method
Design and stability during erection

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Contents
1.
2.
3.
4.

Introduction
General design
Longitudinal post-tensioning
Temporary cantilevers stability

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

1. Introduction
Design begins with
knowledge of
successive stages
of construction

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Cast in place segments

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Pre-cast segments

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Range of spans
! Between

40 and 200 m, even 300 m


! French records:
205 m Rhin bridge (2002)
192 m Sioule viaduct (2005)
190 m Viaur viaduct (1999)

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Bridge over the Rhin river


November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Viaduct over the Viaur river


November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

Viaduct over the Sioule river


November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

10

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

11

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

12

2. General design

With hinges at mid-span (in the old days)

Lest

Cintre

Equal length spans, side spans 0.6L

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

13

Variable length spans


0,6 L

November 26 29 New Delhi

(L+l)/2

fib Symposium on Segmental construction in concrete

0,6 l

14

Deck depth
hc

hp

Parabolic depth variation

Linear depth variation

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

15

Depth ratio
Common case

On Pier hp
L = 120 m
hp
Mid-span hc
L = 120 m
hc

November 26 29 New Delhi

Static study

L/16 to L/18 L/(14+(L/45))


7m

7.2 m

L/30 to L/35 L/(19+(L/7))

3.6 m

3.3 m

fib Symposium on Segmental construction in concrete

16

One-sided cantilever technique

Bras de la plaine
November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

17

Cross section
One cell box

Two cells box

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

18

Box-girder ribbed transversely

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

19

Box-girder with braces

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

20

Twin box-girder

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

21

Composite girder

Boulonnais
November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

22

Bearing conditions

Simply supported

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

23

Connected to
the pier

Twin walls

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

24

Twin walls

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

25

On pier segments

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

26

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

27

Traveller forms to cast


on pier segment

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

28

2. Post-tensioning
Cantilever tendons

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

29

17

15

13

11

10

12

GV

14

16

COUPE TRANSVERSALE

ELEVATION

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

30

Ducts in the top flange

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

31

Internal continuity tendons

Side-span

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

32

Internal continuity tendons

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

33

External continuity tendons


ancrage
sur pile
Anchor
on

pier

November 26 29 New Delhi

Deflectiondviateur
cross-beam
en trave

fib Symposium on Segmental construction in concrete

34

External tendons: 3 spans

dviateurs
Cross-beam

entretoises

Diaphragms

0,2 0,25

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

35

External tendons

On pier

External tendons

Cbles extrieurs

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

36

Deflection cross-beam

External tendons

Cbles extrieurs
0,15
0,35 0,40

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

37

3. Cantilevers stability

Poids de l'quipage

2 types of situation
Temporary: Unbalanced cantilever during erection
Accidental: Fall of a traveller form or a precast segment

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

38

Stability devices
Temporary ties

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

39

Top flange anchorage

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

40

Vertical tendons

Temporary stays +
temporary ties

2 cbles
27 T 15 S

2 cbles
10 T 15 S

Temporary stays

November 26 29 New Delhi

2 cbles
12 T 15 S

fib Symposium on Segmental construction in concrete

41

November 26 29 New Delhi

fib Symposium on Segmental construction in concrete

42