Pipe deflections should not be excessive and cause collisions. Any pipe with more than 80 mm of movement must be checked for clearance. Pipe sagging is limited to half an inch or 12.7mm under sustained and occasional loads.
Pipe deflections should not be excessive and cause collisions. Any pipe with more than 80 mm of movement must be checked for clearance. Pipe sagging is limited to half an inch or 12.7mm under sustained and occasional loads.
Pipe deflections should not be excessive and cause collisions. Any pipe with more than 80 mm of movement must be checked for clearance. Pipe sagging is limited to half an inch or 12.7mm under sustained and occasional loads.
Pipe deflections should not be excessive as to cause collision with surrounding pipe work, structural or equipment. All pipe work with more than 80 mm of movement shall be checked for clearance. Pipe sagging shall be limited to half inch or 12.7mm under sustained and occasional loadsfdgfd.