GROUP MEMBER:
MUHAMMAD SHAFIQ AIMAN BIN
AHMRAN
ADILAH ARMA SHAARI
MOHD NAZAMIR BIN AZHAR
MUHAMMAD RAFIQUE MOHD
NASIR
SUPERVISOR :
IR.ASRI BIN ABD RAHIM
INTRODUCTION
PROGRESSIVE BUILDER CONST. founded in 1 Feb
2005 initially to provide professional consulting
services in Civil & Structural Engineering.
providing extensive professional services to both
the public and private sector
The Firm had affiliated and associated with others
professionals and recruited several experience
personnel to form productive team
PROJECT DESCRIPTION
ITEMS
CONTENT
PROJECT NAMES
COST
RM5430527.85
CONTRACT PERIOD
14 WEEKS
DESIGN CONSULTANT
1.
2.
3.
4.
5.
Project Manager
Geotechnical Engineer
Civil Engineer
Structural Engineer
M&E Engineer
EARTHWORK
Borelog Data
Proposed foundation
STRUCTURE DESIGN
CALCULATION OF COLUMN LOAD
USING
AREA METHOD (VIP ROOM
GRANDSTAND)
VIP ROOM
TRF
Material
METAL DECK
ROOFING SHEET
WITH 50 THK.
INSULATION
WOOL
& A LAYER
DOUBLE SIDED
SISALATION ON
CHICKEN
WIRE MESH M.S
PURLIN AT 1200
C/C
3.9
THK
0.8
DENSITY
References :
Eurocode 1 (Table 2.2.2 &
2.3.1)
50 mm
78
6.465
Label
Area (m2)
Load (kN)
CL1
102.599942
663.30862503
CL2
102.599942
663.30862503
CL3
78.974956
510.57309054
CL4
78.974956
510.57309054
CL5
102.599942
663.30862503
CL6
102.599942
663.30862503
Load (kN)
CL1
663.309
CL2
1141.354
CL3
1073.384
CL4
1127.603
CL5
1180.304
CL6
663.309
CLS1
275.041
CLS2
287.794
CLS3
243.768
CLS4
228.936
COLUMN GRANDTAND
450
mm
900
mm
212
mm
width of stair, w
5800 mm
length of stair, L
2000 mm
Characteristic Actions:
permanent,gk
variable,qk
(excluding
selfweight)
Materials :
fck
25
fyk
500
25
Cnom
25 mm
bar
8 mm
22.94
11.55
gk
12.55
qk
Ultimate Load
22.94
Distributed load
133071.0424991
32
Bending Moment
53228.41699965
27
Average
thickness
y
237 mm
462 mm
Load (kN)
A1
3.57
163.82
A2
7.21
330.84
A3
7.28
334.05
A4
7.28
334.05
A5
9.12
418.49
A6
10.21
468.50
A7
20
917.73
A8
20.18
925.99
A9
20.18
925.99
A10
25.55
1172.40
A11
6.15
282.20
A12
15.47
709.87
A13
15.6
715.83
A14
15.6
715.83
A15
11.18
513.01
A16
8.46
388.20
A17
16.51
757.59
A18
16.65
764.01
A19
16.65
764.01
A20
12.36
567.16
21
12.29
563.95
22
13.25
608.00
23
8.3
380.86
BEAM DESIGN
BEAM LAYOUT
DESIGN CONSIDERATION
Concrete:
Grade 30 for superstructure
Density = 25 kg/m3
Reinforcement:
Grade 500 N/mm2 for main
reinforcement
Grade 500 N/mm2 for shear link
reinforcement
Concrete cover
30 mm
Design criteria
Loading: EC1
Reinforcement bar:
20mm
Link:
6mm
BEAM DETAIL
SLAB DESIGN
LOADING DETERMINATION
Slab self weight
Finishes
Imposed load (EC1)
Ultimate design load, n = 1.35Gk + 1.5Qk
COVER
Exposure condition (Table 4.1, EN 1992-1-1)
Fire resistance (Table 5.8, EN 1992-1-2)
FLOOR SLAB
ROOF TRUSSES
4.10
kN
G
5.01 kN
4.74 kN
2.96
kN
2.70
kN
10
A
9.73
kN
407
5
B
8.36
kN
536
0
C
11.14
kN
367
5
D
9.78
kN
264
5
SEWERAGE
The proposed sewer linesSYSTEM
is to cater the following : -
Stadium
Office
Manhole
Max. Spacing
:
Not Greater Than 90 m
Minimum Depth
:
1200mm Below Ground Level
Manhole covers :
Heavy Duty Cast Iron Manholes
Design Criteria
Malaysian Standard, MS1228
Design and installation of sewerage system by the Director
General of Sewerage Services Department
Malaysian Sewerage Industry Guideline (MSIG).
following gradients ( Building Spec JKR )
TOTAL P.E
AREA (m2)
STADIUM
120
24.0
OFFICE
177
3/100m2
5.0
29.0
The total area for office is 177m 2. The estimated numbers of capacity for this stadium
is about 120 persons. The PE calculations are shown above.
SEWERAGE LAYOUT
WATER RETICULATION
Types of Fittings
Qty.
Storage
Demand
Demand
Capacity (Liters)
(lpd)
(gpd)
Shower
24
900
21,600
4,752
Lavatory Basins
20
90
1,800
396
Water Closet
26
180
4,680
1,030
Wash Up Sink
225
225
50
Water Tap
13
90
1,170
257
Urinal
180
360
79
29,835.00
6564
680.00
lpm
700.72
lpm
11.68
lps
TYPE
OF
PIPE
H.
WILLIAMS,
C
L (m)
D (m)
Q
(Avg)
Q, Peak
Node
A(M) Up
Node
Down
Veloci
ty
node
up
Veloci
ty
node
down
V<
Vmax
= 2.6
hf
(m)
Residual
Head
Pressure
Node Up
Residual
Head
Pressure
N. Down
Minimum
Residual
Pressure >
7.5m
SV
HDPE
120
53.8
0.2
0.369
0.923
0.031
55.09
50.74
0.00
0.03
OK
0.05
36.50
40.86
OK
HDPE
120
33.9
0.2
0.369
0.923
0.031
50.74
52.82
0.03
0.03
OK
0.03
40.86
38.78
OK
HDPE
120
17.5
0.2
0.369
0.923
0.031
52.82
52.74
0.03
0.03
OK
0.01
38.78
38.86
OK
HDPE
120
60.6
0.2
0.369
0.923
0.031
52.74
49.67
0.03
0.03
OK
0.05
38.86
41.93
OK
HDPE
120
33.8
0.2
0.369
0.923
0.031
49.67
49.56
0.03
0.03
OK
0.03
41.93
42.04
OK
HDPE
120
28.6
0.2
0.369
0.923
0.031
49.56
49.57
0.03
0.03
OK
0.02
42.04
42.03
OK
HDPE
120
28.6
0.2
0.369
0.923
0.031
49.570
51.17
0.03
0.03
OK
0.02
42.03
40.43
OK
HDPE
120
31.2
0.2
0.369
0.923
0.031
51.170
50.75
0.03
0.03
OK
0.03
40.43
40.85
OK
BUIL
DNG
HDPE
120
34.4
0.2
0.369
0.923
0.031
50.758
50.88
0.03
0.03
OK
0.03
40.85
40.72
OK
HR1
HDPE
120
5.35
0.2
0.369
0.923
0.031
51.170
50.88
0.03
0.03
OK
0.00
40.72
41.00
OK
HR
1
HDPE
120
27.7
0.2
0.369
0.923
0.031
50.886
50.16
0.03
0.03
OK
0.02
41.00
41.72
OK
HDPE
120
9.93
0.2
0.369
0.923
0.031
50.166
50.15
0.03
0.03
OK
0.00
41.72
41.73
OK
HR2
HDPE
120
14.8
0.2
0.369
0.923
0.031
50.159
50.68
0.03
0.03
OK
0.01
41.73
41.204
OK
TYPE
OF
PIPE
H.
WILLIA
MS, C
L (m)
D
(m)
Q (Avg
Q, Fire
Flow
Node
Down
Residual
Head
Residual
Pressure Head
Node Up Pressure
(m)
N. Down
Minimum
Residual
Pressure
> 7.5m
S
V
HDPE
120
53.882
0.2
0.345
11.345
0.0314
55.1
52.7
0.00
1.44
OK
0.578
36.50
40.17
OK
HDPE
120
33.909
0.2
0.345
11.345
0.0314
52.7
52.6
1.44
1.44
OK
0.364
40.17
37.73
OK
HDPE
120
17.587
0.2
0.345
11.345
0.0314
52.6
52.4
1.44
1.44
OK
0.189
37.73
37.62
OK
HDPE
120
60.624
0.2
0.345
11.345
0.0314
52.4
52.3
1.44
1.44
OK
0.650
37.62
40.04
OK
HDPE
120
33.883
0.2
0.345
11.345
0.0314
52.3
51.9
1.44
1.44
OK
0.363
40.04
39.79
OK
HDPE
120
28.631
0.2
0.345
11.345
0.0314
51.9
51.9
1.44
1.44
OK
0.307
39.79
39.48
OK
HDPE
120
28.631
0.2
0.345
11.345
0.0314
51.9
51.2
1.44
1.44
OK
0.307
39.48
37.57
OK
HDPE
120
31.288
0.2
0.345
11.345
0.0314
51.2
50.9
1.44
1.44
OK
0.335
37.57
37.65
OK
BUIL
DNG
HDPE
120
34.450
0.2
0.345
11.345
0.0314
50.9
50.9
1.44
1.44
OK
0.369
37.65
37.15
OK
HR1
HDPE
120
5.355
0.2
0.345
11.345
0.0314
50.9
50.8
1.44
1.44
OK
0.057
37.15
37.38
OK
H
R
1
HDPE
120
27.720
0.2
0.345
11.345
0.0314
50.8
50.7
1.44
1.44
OK
0.297
37.38
37.80
OK
HDPE
120
9.931
0.2
0.345
11.345
0.0314
50.7
50.2
1.44
1.44
OK
0.106
37.80
37.70
OK
HR2
HDPE
120
14.847
0.2
0.345
11.345
0.0314
50.2
50.2
1.44
1.44
OK
0.159
37.70
37.02
OK
EXTERNAL PIPEWORKS
ROAD DESIGN
DESIGN ROAD
Road need to be designed by considered several
terms which is requirement from clients,
environmental
barriers,
safety,
physical
environmental factors (such as topography, climate,
and soils), traffic requirements, and traffic service
levels.
.
Traffic : ADT
Design Vehicles :
Refer Figure 3.2 ( SU Design Vehicle )
Capacity
Capacity is negligible due to a very low passenger car unit (PCU) and
frequency.
Level of Service : A
Free flow with low volumes, densities and high speed. Drivers can
maintain their desired speeds with little or no delay
Pavement
Pavement type : Intermediate Type
Pavement(Bituminious Macadam /
Concrete)
Shoulders
Usable shoulders : 2.00m ( Refer
Table 5-4A, Arahan Teknik Jalan 8/86 )
Kerbs
Type of kerbs : Barrier kerb
Kerb : Sidewalks
CALCULATION
Given :
Design speed : 50km/h
Traffic direction at Pauh Sport Complex
Calculation
Step 1 : Development of Design Input
PCV = 16 % (no detailed break-down by vehicle type)
Lane Distribution Factor, L = 1.0 (one lane in one
direction)Table 2.2
Terrain Factor, T = 1.1 (rolling)Table 2.3
Design Life = 10 years
Annual Traffic Growth = 3.0%
= 0.77 million
DRAINAGE SYSTEM
DRAINAGE LAYOUT
Diameter,d = 300 mm
Area,A = 0.1
Slope,s = 0.005
Hydraulic Radius,r = 0.075
Disharge = 0.12
Velocity = 1.25
Diameter,d = 600 mm
Area,A = 0 mm2
Slope,s = 0.005
Hydraulic Radius,r = 0.071
Disharge,Q = 0.581 m3/s
Velocity,V = 2.055 m/s
MECHANICA
L&
ELECTRICAL
GROUND FLOO
R
1ST FLOOR
2ND FLOOR
MECHANI
GROUND FLOO
CAL
R
2ND FLOOR
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
GROUND FLOOR
SECOND FLOOR
C
AL
C
U
LA
TI
O
N
(Room Area) 60
9000
LIGHTING SYSTEM
No of Light Used =
AIR CONDITIONING
Cooling Load Requirement (HP) = (Room Area)
60
9000
FI
RE
RE
DRY POWDER AND CO2
SI
FIRE EXTINGUISHER
ST
AN
CE
FIRE RESISTANCE
FI
RE
RE
SI
ST
AN
CE
EXIT SIGN
EMERGENCY
LIGHT
PRELIMINARY DETAILS
ABSTRACT
BILL NO
DESCRIPTION
BILL 1
PRELIMINARIES
429,816.50
BILL 2
EARTH WORK
106,4780.00
BILL 3
TURFING
BILL 4
PILING
146,992.89
BILL 5
STRUCTURE
333,368.95
BILL 5
WATER RETICULATION
BILL 6
SEWARAGE SYSTEM
139,956.00
BILL 7
ROAD
188,183.90
BILL 8
DRAINAGE SYSTEM
61128.00
BILL 9
M&E
10265.00
TOTAL
4544.00
72467.00
2451496.24
THANK YOU