Wind Load
Wind Load
CROSSRAIL
Job Ref
Date:
11/26/2015
Calc sheet
1
Check By:
Rev
Date:
Output
Ref
Calculations
BS6399-2 Wind
1997
2.2.2.1
Vs = Site wind speed
Vb Sa Sd Ss Sp
Fig 6
Vb = basic hourly mean wind speed
2.2.2.2
Sa = altitude factor
= altitude in metres above mean sea level
2.2.2.3
Sd = direction factor
2.2.2.4
Ss = Seasonal factor
2.2.2.5
Sp = probability factor
=
=
=
=
=
=
=
21.50 m/s
21.00 m/s
1.02
24.00 m
1.00
1.00
1.00
2.2.3.2
Table 4
2.1.2.1
qs = Dynamic pressure
0.613 Ve2
0.85 kN/m2
Walls
Fig 12
Pe
D/H
D
H
=
=
=
=
qs Cpe Ca
span ratio of building
width of building
height of building
Table 5
Cpe (windward)
Cpe (leeward)
Cpe (sideface)
2.1.3.4
Cae
a
Cpe
0.60
-0.50
-0.90
=
=
=
8.11 m
107.00 m
13.20 m
Pe (kN/m2)
0.45
-0.38
-0.68
=
=
0.89
21.00 m
21.3m
31.3m
20.7m
33.2m
~200m
Span 4
Span 3
Span 2
= 0deg
Span 1
= 90deg
(zone B with
funnelling effect)
Line B
Span 3 worst case
Wind Direction
te:
utput
worst case
with
g effect)
worst case
CROSSRAIL
Project:
Lea Crossing Bridge
Part of Structure:
Loadings
Drawing Ref: Calc By:
ND
Ref
Job Ref
Calc sheet
2
Check By:
Date:
11/26/2015
Rev
Date:
Output
Calculations
Roof
Span 4
Span
2
Span 1
Span
3
~30deg
~30d
eg
~30de
g
~30de
g
Calculation of roof windload assuming the curved roof is multi-bay duo pitch roof
External coefficient (Cpe)
Cpe
=0
Pitch angle
Table 10
+30 deg
Zone C
-0.20
0.40
Cpe
=0
Cpe
= 90
Zone G
-0.50
-0.50
Zone C
Cae
0.92
0.92
0.92
0.92
Dim a
21
21
21
21
-0.60
Dim a
13
13
13
13
* = 90
Line B
Span 3 worst case
90
Zone C
Zone G
Zone C
-0.16
-0.39
Span 1
-0.46
0.31
-0.39
-0.12
-0.31
Span 2
-0.46
0.25
-0.31
-0.09
-0.23
Span 3
-0.46
0.19
-0.23
-0.09
-0.23
Span 4
-0.46
0.19
-0.23
Factored by 1.0 upwind bay, 0.80 second bay, 0.6 remaining bays
Table 12
Tab 18
Fig 4
Cae
0.90
0.90
0.90
0.90
Cai
Pi (kN/m2)
0.53
-0.38
0.33
0.74
Line B
=
=
107.3 m
11.1 m
CROSSRAIL
Project:
Lea Crossing Bridge
Job Ref
Part of Structure:
Loadings
Calc sheet
3
Rev
Check By:
Date:
Drawing Ref:
Calc By:
ND
Date:
11/26/2015
Output
Loadcase Calculations
All units in (kN/m2)
A9/10
0.83
Span 1
P
0.83
0.00
-0.30
Span 2
-0.30
-0.30
Span 3
Span 4
0.00
A9/10
0.22
0.25
-0.01
0.69
0.28
0.06
0.63
-0.01
0.28
0.14
0.56
0.06
0.14
0.56
0.14
0.14
0.13
A11/12
Span 1
P
0.13
-0.70
-1.01
Span 2
-1.01
-1.01
Span 3
Span 4
-0.70
-0.48
-0.75
-0.72
-0.01
-0.64
-0.08
-0.72
-0.65
-0.14
-0.64
-0.65
-0.56
-0.56
-0.14
-0.56
-0.56
Span 4
0.19
-0.23
0.33
-0.14
-0.56
CROSSRAIL
Project:
Lea Crossing Bridge
Job Ref
Part of Structure:
Loadings
Calc sheet
4
Rev
Check By:
Date:
Drawing Ref:
Calc By:
ND
Date:
11/26/2015
Output
Loadcase Calculations
-1.21
A8
Span 4
P
-0.08
-0.91
-1.21
Span 3
-0.08
-0.91
Span 2
Span 1
-1.21
A8
P
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
-0.99
-4.04
-4.04
-4.04
-4.04