Calculations
BS6399-2 Wind
1997
2.2.2.1
Vs = Site wind speed
Vb Sa Sd Ss Sp
Fig 6
Vb = basic hourly mean wind speed
2.2.2.2
Sa = altitude factor
= altitude in metres above mean sea level
2.2.2.3
Sd = direction factor
2.2.2.4
Ss = Seasonal factor
2.2.2.5
Sp = probability factor

=
=
=
=
=
=
=

21.50 m/s
21.00 m/s
1.02
24.00 m
1.00
1.00
1.00

2.2.3.2
Table 4

Ve = Effective wind speed


Vs Sb
=
37.20 m/s
Sb = terrain and building factor
=
1.73
effective height 16.70m (worst case span 4), Site in town, >100km from sea

2.1.2.1

qs = Dynamic pressure

0.613 Ve2

0.85 kN/m2

Walls

Fig 12

Pe
D/H
D
H

=
=
=
=

qs Cpe Ca
span ratio of building
width of building
height of building

Table 5
Cpe (windward)
Cpe (leeward)
Cpe (sideface)
2.1.3.4

Cae
a

Cpe
0.60
-0.50
-0.90

=
=
=

8.11 m
107.00 m
13.20 m

Pe (kN/m2)
0.45
-0.38
-0.68

= size effect factor


= diagonal dimension

=
=

0.89
21.00 m

21.3m
31.3m
20.7m
33.2m
~200m

Span 4
Span 3
Span 2

= 0deg

Span 1

= 90deg

Span 3 worst case

(zone B with
funnelling effect)
Line B
Span 3 worst case

Wind Direction

te:

utput

worst case

with
g effect)

worst case

CROSSRAIL

Project:
Lea Crossing Bridge
Part of Structure:
Loadings
Drawing Ref: Calc By:
ND

Ref

Job Ref
Calc sheet
2
Check By:

Date:
11/26/2015

Rev
Date:
Output

Calculations
Roof

Span 4

Span
2

Span 1

Span
3

~30deg

~30d
eg

~30de
g

~30de
g

Calculation of roof windload assuming the curved roof is multi-bay duo pitch roof
External coefficient (Cpe)
Cpe
=0
Pitch angle

Table 10

+30 deg

Zone C
-0.20
0.40

Cpe
=0

Cpe
= 90

Zone G
-0.50
-0.50

Zone C

Cae
0.92
0.92
0.92
0.92

Dim a
21
21
21
21

-0.60

Size effect factor (Ca)


* = 0
Span 1
Span 2
Span 3
Span 4
* Figure 4, line B

Dim a
13
13
13
13

* = 90

External surface pressure, Pe (kN/m2)


=0

Line B
Span 3 worst case

90

Zone C
Zone G
Zone C
-0.16
-0.39
Span 1
-0.46
0.31
-0.39
-0.12
-0.31
Span 2
-0.46
0.25
-0.31
-0.09
-0.23
Span 3
-0.46
0.19
-0.23
-0.09
-0.23
Span 4
-0.46
0.19
-0.23
Factored by 1.0 upwind bay, 0.80 second bay, 0.6 remaining bays

Table 12

Internal Pressure, Pi (kN/m2)


Direction
Cpi
Cai
= 90
0.85
0.74
0.74
-0.60
=0
0.74
0.52
One open face

Tab 18

Fig 4

Cae
0.90
0.90
0.90
0.90

Cai

= size effect factor

Pi (kN/m2)
0.53
-0.38
0.33

0.74

Line B

= diagonal dim of open space


or 0.2 x (internal Volume1/3)

(1072+ 7.92) 0.5


0.2 (200 x 107 x 7.9)1/3

=
=

107.3 m
11.1 m

Span 3 worst case

CROSSRAIL

Project:
Lea Crossing Bridge

Job Ref

Part of Structure:
Loadings

Calc sheet
3

Rev

Check By:

Date:

Drawing Ref:

Calc By:
ND

Date:
11/26/2015

Output

Loadcase Calculations
All units in (kN/m2)
A9/10

Wall load case 1 or 2 - Wind 0deg, -0.60Cpi


Zone
Cpe
Cpi
windward
0.45
-0.38
leeward
-0.38
-0.38
side
-0.68
-0.38

0.83

Span 1

P
0.83
0.00
-0.30

Span 2

-0.30

-0.30

Span 3

Span 4

0.00

not critical Roof load case 1 - Wind 0deg, -0.20Cpe, -0.60Cpi


Cpe
Cpi
P
upwind dnwind
upwind dnwind
-0.16 -0.39
-0.38
0.22
-0.01
Span 1
-0.12 -0.31
-0.38
0.25
0.06
Span 2
-0.09 -0.23
-0.38
0.28
0.14
Span 3
-0.09 -0.23
-0.38
0.28
0.14
Span 4

A9/10

Roof load case 2 - Wind 0deg, +0.40Cpe, -0.60Cpi


Cpe
Cpi
P
*upwind dnwind
upwind dnwind
0.31
-0.39
-0.38
0.69
-0.01
Span 1
0.25
-0.31
-0.38
0.63
0.06
Span 2
0.19
-0.23
-0.38
0.56
0.14
Span 3
0.19
-0.23
-0.38
0.56
0.14
Span 4

0.22

0.25
-0.01

0.69

0.28
0.06

0.63
-0.01

0.28
0.14

0.56
0.06

0.14

0.56
0.14

0.14

0.13

A11/12

Wall load case 1 or 2 - Wind 0deg, -0.60Cpi


Zone
Cpe
Cpi
windward
0.45
0.33
leeward
-0.38
0.33
side
-0.68
0.33

Span 1

P
0.13
-0.70
-1.01

Span 2

-1.01

-1.01

Span 3

Span 4

-0.70

not critical Roof load case 3 - Wind 0deg, -0.20Cpe, +0.52Cpi


Cpe
Cpi
P
*upwind dnwind
upwind dnwind
-0.16 -0.39
0.33
-0.48
-0.72
Span 1
-0.43 -0.31
0.33
-0.75
-0.64
Span 2
-0.32 -0.23
0.33
-0.65
-0.56
Span 3
-0.32 -0.23
0.33
-0.65
-0.56
Span 4
* Span 2 to 4 treated as troughed downwind face
A11/12

Roof load case 4 - Wind 0deg, +0.40Cpe, +0.52Cpi


Cpe
Cpi
P
upwind dnwind
upwind dnwind
0.31
-0.39
0.33
-0.01
-0.72
Span 1
0.25
-0.31
0.33
-0.08
-0.64
Span 2
0.19
-0.23
0.33
-0.14
-0.56
Span 3

-0.48

-0.75
-0.72

-0.01

-0.64

-0.08
-0.72

-0.65

-0.14
-0.64

-0.65
-0.56

-0.56

-0.14
-0.56

-0.56

Span 4

0.19

-0.23

0.33

-0.14

-0.56

CROSSRAIL

Project:
Lea Crossing Bridge

Job Ref

Part of Structure:
Loadings

Calc sheet
4

Rev

Check By:

Date:

Drawing Ref:

Calc By:
ND

Date:
11/26/2015

Output

Loadcase Calculations
-1.21

A8

Wall load case 4 - Wind 90deg, +0.85Cpi


Zone
Cpe
Cpi
windward
0.45
0.53
leeward
-0.38
0.53
side
-0.68
0.53

Span 4

P
-0.08
-0.91
-1.21

Span 3

-0.08

-0.91

Span 2

Span 1

-1.21

A8

Roof load case 4 - Wind 90deg, -0.60Cpe, +0.85Cpi


Cpe
Cpi
Span 1
-0.46
0.53
-0.46
0.53
Span 2
-0.46
0.53
Span 3
-0.46
0.53
Span 4

P
-0.99
-0.99
-0.99
-0.99

-0.99

-0.99

-0.99

-0.99

-4.04