Maharashtra State Power Generation Comp, LTD

Chandrapur Super Thermal Power Station,


Chandrapur
AUXILIARY FAILURE EVENT ANALYSIS REPORT
DATE-02.05.2012

UNIT NO- 1
Auxiliary Failed :

C/M-1A tripped at 15:25 Hrs.

Brief description of Event :

Running C/M-1A tripped all of a sudden with E/F indication. After


checking by E/M & TIC no E/F found. C/M Taken back in service at
16:50 Hrs.

Observation :

C/M-1A E/F Relay & Master trip Relay on 6.6 KV Breaker panel
found operated.
The same incidence with the same C/M again occurred on
03/05/2012 at 13:15 Hrs.

Analysis of failure :

Relay replaced, Earth fault current measured showing 0.15 mA. In


other motors it is 0 mA. Setting is 20 mA. Motor to be checked.

New Marathon make C/M motor installed & checked leakage


current & replaced the old cable.

ACTION :

Recommendation:

During COH of mill, relay as well as motor to be checked.

Equipment Failure committee :


1) S.P. Patil
2) R.M. Choudhary
3) A.S. Sangewar
4) M.V. Mahawadi
5) R.N. Nilawar
Supdt. Er. (M-I)
Submitted w.r.to
1) Dy.C.E(I)
Copy to
1) S.E (POG)